Loading...
Res 022-88 2/2/1988RESOLUTION NO. /j '1 - I j RESOLUTION TO APPROVE ENGINEERING CONTRACT FOR CONSTRUCTION OF CYPRESS 5MG GROUND STORAGE WATER TANK WHEREAS, the City will construct a 5MG ground storage water tank at the Cypress Street Water Treatment Plant; WHEREAS, the engineering firm of Biggs & Mathews, Inc. proposes to provide the necessary engineering services for the design and construction of the tank; and, services. WHEREAS, the Council has examined a proposed contract for the NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The proposed contract with the firm of Biggs & Mathews, Inc. for providing the necessary engineering services to design and construct a 5MG water tank at the Cypress Street Water Treatment Plant is hereby approved. The maximum fee for the basic services provided in the contract is $36,000.00. The maximum fee for the inspection and contract administration services is $24,000.00. The fees for other additional services that may be necessary are as provided in Appendix A of the contract. The City Manager is authorized to execute the Contract. ATTEST: PASSED AND APPROVED ON THIS THE 2ND DAY OF ABRWRY, 1988. 4L CITY CLERK