Loading...
Res 157-89 9/19/1989RESOLUTION NO. /V7/y RESOLUTION TO REJECT BID FOR UTILITY LINE ADJUSTMENTS FOR PHASE III OF THE HOLLIDAY CREEK FLOOD CONTROL PROJECT ANT TO AUTHORIZE REBID OF THE UTILITY ADJUSTMENT PROJECT WHEREAS, the City advertised for bids for the relocation of a 54" raw water line and two 12" treated water lines in preparation for Phase III of the Holliday Creek Flood Control Project, such project estimated by the engineer to cost 280, 000. 00; WHEREAS, the City received one bid from Rhode Construction Co. , Lubbock, Texas in the amount of $582,860. 00; and, WHEREAS, Council believes this job should be reconfigured and rebid in order to confirm through additional competitive bidding the cost of this job. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The bid of Rhode Construction Co. in the amount of 582,860. 00 for utility line adjustments for Phase III of the Holliday Creek Flood Control Project is hereby rejected. The City Staff is authorized to reconfigure the Utility Adjustment Project and rebid the project. PASSED AND APPROVED THIS THE 19TH DAY OF SEPTEMBER, 1989. E/17M A Y O R ATTEST: te--7/)(1Z.,-}i ' CITY CLERK