Res 081-90 4/17/1990RESOLUTION NO. P-47
A RESOLUTION APPROVING THE JOINT CERTIFICATION PACKAGE FOR URBAN
TRANSPORTATION PLANNING AND AUTHORIZING THE CITY MANGER TO EXECUTE
REQUIRED CONTRACTS, AGREEMENTS, AND CERTIFICATIONS
WHEREAS, in the Wichita Falls area, federal assistance may be
required for: 1) street and highway construction, 2) capital and
operating assistance for public mass transportation, and 3) trans-
portation planning; and,
WHEREAS, Joint Certification of Urban Transportation Planning
Process by the Federal Highway Administration (FHWA) and Urban Mass
Transit Administration (UMTA) is prerequisite for federal capital,
operating and planning assistance; and,
WHEREAS, the Joint Certification process requires endorsement by
the Metropolitan Planning Organization (MPO) of the Transportation
Improvement Program with Annual Element, and the Unified Work Program;
and,
WHEREAS, the City of Wichita Falls, Texas, has been designated on
August 31, 1988, as the Metropolitan Planning Organization for the
Wichita Falls urbanized area; and,
WHEREAS, the City of Wichita Falls has accepted the designation
and is willing to accept continued designation.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
WICHITA FALLS, TEXAS, THAT:
SECTION 1. The following documents of the Urban Transportation
Planning Process are hereby endorsed as being valid and consistent
with the City of Wichita Falls' Comprehensive Plan:
1. Agreements: "Continuing Phase Agreement" dated September 12,
1979; Agreement designating the City of Wichita Falls as MPO
dated August 31, 1988; and, Agreement between Nortex Regional
Planning Commission and the MPO dated March 27, 1990.
2 . Transportation Improvement Program with Annual Element - FY
1991.
3 . Unified Work Program - FY 1991.
SECTION 2. The city manager is authorized to execute required
contracts, agreements, and certifications for continued transpor-
tation planning activities, and for the City of Wichita Falls
continuing to perform as the Metropolitan Planning Organization.
PASSED AND APPROVED THIS THE 17TH DAY OF APRIL, 1990.
M A Y O R
ATTEST:
CITY CLE
1
TRANSPORTATION IMPROVEMENT PROGRAM
for the
Wichita Falls Urban Transportation Study Area
FY 1991
Annual & Five Year Elements
Sponsoring Agencies: In Cooperation With:
City of Wichita Falls U.S. Department of Transportation
County of Wichita Federal Highway Administration
State Department of Highways Urban Mass Transit Administration
and Public Transportation
May 1990
TRANSPORTATION IMPROVEMENT PROGRAM
WITH ANNUAL ELEMENT
for the
WICHITA FALLS, TEXAS, URBANIZED AREA
The Transportation Improvement Program (TIP) is a five-year
program developed cooperatively by the city of Wichita
Falls, Wichita County, and the Texas State Department of
Highways and Public Transportation (SDH&PT) . This TIP is in
accordance with transportation plans developed by the
Wichita Falls Urban Transportation Study, and follows the
3-C" Planning process outlined in United States Code 23,
Highways" .
The following projects are recommended for implementation
during the period, October 1, 1990 through September 30,
1995. These projects are based on the short-range
transportation needs of the community as identified in the
Wichita Falls Urban Transportation Study, and reflect those
projects which should be constructed if funds are available.
The TIP contains an annual element and a five-year element
for highway and transit projects.The list of annual
element highway projects is divided into two parts. The
first part of the highway annual element contains projects
expected to be under contract by October 1, 1990. If any
project is delayed, it should remain as a high priority in
the current annual element. The second part of the annual
element lists projects in general order of need. The five
year projects are not prioritized.
TRANSIT PROJECTS
FY 1991
October 1, 1990 - September 30, 1991
Projected
Annual
Project Cost $
Obtain federal operating assistance funds FY'91 300, 000
Obtain federal capital assistance funds FY'91
for two (2) buses 320, 000
Obtain federal capital assistance funds FY'91
for one (1) wheelchair lift 20, 000
Obtain federal capital assistance funds FY'91
for one (1) sedan 12 , 500
Obtain federal capital assistance funds FY'91
for one (1) heavy pick-up truck 13, 500
Obtain federal capital assistance funds FY'91
for one (1) computer system 10, 000
5 Year Projects:
Obtain federal operating assistance funds for:
FY 1992 300, 000
FY 1993 310, 000
FY 1994 320,000
FY 1995 330,000
FY 1996 340, 000
NOTE: Total project costs are shown. Federal-state-local
cost sharing will be based on prevailing formulas.
ANNUAL ELEMENT
FY 1991 - October 1, 1990 to September 30, 1991
FUNDING
FACILITY LIMITS TYPE OF WORK EST. COST* SOURCE
STREET AND HIGHWAY PROJECTS
Projects expected to be in progress prior to October 1, 1990
1. FM 369 US 82 - FM 2650 East Widen to 4 lanes, C&G 1,053,000 FAU/State
2. Maurine St IH-44 - Sheppard Access Construct arterial & ROW 504,000 FAU/Local
3. Midwestern Pkwy Maplewood - Taft Reconstruct, widen, storm sewer & ROW 701,000 FAU/Local
4. Spur 370 (E Scott) Virginia - N Hines Widen, ROW 1,340,000 FAU/State
5. US 82 (Kell) Harrison - Holliday Illumination 175,000 FAP
Annual elements listed in general order of need
6. US 287 6th - 18th Construct overhead expressway 38,211,800 FAP
w/ access to the CBD
7. FM 2380 (Old Lake) FM 369 - SH 79 ROW, widen to 48', pave shoulders 2,464,400 FAU/Local/State
8. Lebanon Street Kell - Old Seymour Rd Reconstruct and realign 380,000 FAU/Local
9. FM 367 FM 368 - Loop 11 Widen pavement & structures 975,000 State
10. FM 369 Barnett Rd. - SH 79 Add 7 left-turn bays 103,360 FAU/State
11. Midwestern Pkwy a Lake Park Dr Signalization 48,300 FAU/Local
12. Taft Blvd a Hampstead Channelization 164,000 FAU/Local
13. Loop 473 31st - S of Christine Eliminate median; add continuous left-turn 90,000 FAU/State
14. Maurine St Sheppard Access - SH 240 Construct arterial, C&G, drainage 1,008,000 FAU/Local
15. Midwestern Pkwy a Jacksboro Provide turn lanes 150,000 FAU/Local
16. Wellington Ln Loop 370 - N irr canal Reconstruct, C&G, drainage 542,000 FAU/Local
17. US 82 (Kell) a Taft, Harrison, Brook Upgrade signalization 110,000 FAP
18. US 277 (Seymour Hwy) a Barnett Rd Signalize 140,000 FAU
19. Barnett Rd a Johnson Rd Signalize 50,000 FAU/Local
20. Loop 11 US 287 - Airport Dr Construction of new location 385,000 FAU/Local
21. FM 890 (Airport Dr) Loop 11 - IH-44 Reconst, widen, drainage, storm sewer, ROW 558,000 FAU/Local
22. FM 890 (Airport Dr) IH-44 - Spur 325 Reconst, widen, drainage, storm sewer, ROW 650,000 FAU/State/Local
23. IH-44 frontage roads a Maurine St Signalize 120,000 FAU
BRIDGE PROJECTS
24. Old Lake Rd (FM 2380) a Holliday Creek Install new bridge 1,000,000 Local
25. Midwestern Pkwy a McGrath Creek Replace bridges 800,000 Local/Corps
Estimated costs represent construction costs unless otherwise noted.
THESE PROJECTS ARE BASED ON THE SHORT RANGE TRANSPORTATION NEEDS OF THE COMMUNITY AS IDENTIFIED IN THE WICHITA FALLS
URBAN TRANSPORTATION STUDY AND REFLECT THOSE PROJECTS WHICH SHOULD BE CONSTRUCTED IF FUNDS BECOME AVAILABLE.
KEY: FAU = Federal Aid Urban
FAP = Federal Aid Primary
FAS = Federal Aid Secondary
BRM = Federal Bridge Replacement
G
N
S
co ANNUAL ELEMENT
e FY 1991 — OCT. 1, 1990 TO SEPT. 30, 1991
sa
1
S.A.F.B. 1
I
6
1 G I
1
1.
i 0US287EXPRESSy
L
n• AIRPORT DR.Atk 4 L
1 oRry Sr
r vOOLDIOWAPtric." .0 , .--\\_..K NWy m 9s
IQP3'F
L
m
i.,
it,ST.• \
9TH STp
a
I
U' m 4".
37
or
Z 0rc
my
CENTRAL FRwY EAST
r
400t-y.c..\-\-
P
O
MIDWESTERNIrrile
1) o i
J CALLFIEL
MO. to
CYti
o I
CI I
S.
P
SOUTHWEST
O o
w o_ Li
1
4 0 5000?
1 IT—. ._. _._._.SCALE NFEET
LAKE WICHITA
L. MAP OF
q WICHITA FALLS
oP''
TEXAS
5
FIVE YEAR ELEMENT
FY 1991 - October 1, 1990 to September 30, 1995
FUNDING
FACILITY LIMITS TYPE OF WORK EST. COST* SOURCE
STREET AND HIGHWAY PROJECTS
Projects are NOT prioritized on this list
1. US 82 (Kell)E of Fairway - W of Kemp Construct freeway 10,000,000 FAP
2. US 82 (Kell)W of Fairway - E of Fairway Construct freeway 4,200,000 FAP
3. 7th Street Brook - Broad Widen to 48' 200,000 FAU/Local
4. Fairway FM 369 - Seymour Hwy Widen 667,920 FAU/ Local
5. FM 890 (Airport Dr) Spur 325 - Armstrong Dr Reconstruct, widen, signalize 1,800,000 FAU/State
6. Hatton Rd a Jacksboro Hwy Realign intersection 400,000 FAU/Local
7. 5th Street Holliday - Ohio Reconstruct & widen 321,500 FAU/Local
8. 6th Street Holliday - Ohio Reconstruct & widen 321,500 FAU/Local
9. Lucy Park** US 277 - IH44 Construct on new location 1,200,000 FAU**/Local
10. Sheppard Access Loop 370 - Spur 325 Reconstruct, C&G, drainage 2,700,000 FAU/Local
11. Callfield Kemp - Fairway Add median & turn lanes, ROW 1,812,000 FAU/Local
12. Callfield reliever** Kemp - McNeil Construct on new location 1,200,000 FAU**/Local
13. Taft US 82 - Hampstead Widen to 4 lanes, C&G 1,000,000 FAU/Local
14. Loop 370 (OIPR) Wellington - FM171 (Jefferson)Reconstruct, C&G, drainage 2,000,000 FAU/Local/State
Estimated cost represents construction cost unless otherwise noted.
Subject to being added to the FAU system.
FAU = Federal Aid Urban
FAP = Federal Aid Primary
FAS = Federal Aid Secondary
G
0
s
j FIVE YEAR ELEMENT
FY 1991 - OCT. 1, 1990 TO SEPT. 30, 1995
S.A.F.B.
I illk
El 0IL'S 287 EXPRESSw L_ -
AY
1 ofi,ryvtsr ..2 Cr,
OLD1pw41
r-K Hwy
Lf, `P
ti F
co IQto
Io° app
r.L '9TH a\-77
2:„
Y O 0 E. SCO
r 06
kaliE,
CENTRAL FRWY EAST
Q . O o
r•, 00 0'\EV v~i
L, J.
r MIDWESTER PKWY Y O ATTON z
CALLFIELD
Z ; Q o
V
m SOUTHWEST PKWY 9
o
0
C 'LIi
a I o oo
Q r. r' SWLE N FEETL._._.
LAKE WICHITA
L.J MAP OF
WICHITA FALLS
1/44 TEXAS
P
5,
1
UNIFIED WORK PROGRAM
for the
Wichita Falls Urban Transportation Study Area
FY 1991
Sponsoring Agencies: In Cooperation With:
City of Wichita Falls U.S. Department of
Transportation
County of Wichita Federal Highway
Administration
State Department of Highways Urban Mass Transit
and Public Transportation Administration
May 1990
2
UNIFIED WORK PROGRAM
WICHITA FALLS URBAN TRANSPORTATION STUDY AREA
FY 1990 - 1991
1 OCTOBER 1990 THROUGH 30 SEPTEMBER 1991
A PART OF THE CONTINUING, COOPERATIVE, AND COMPREHENSIVE
MULTI-MODAL TRANSPORTATION PLANNING PROCESS
ACKNOWLEDGEMENT
This document was prepared in cooperation with the State
Department of Highways and Public Transportation (SDH&PT) by
the Planning Department of the City of Wichita Falls, Texas,
serving as the designated Metropolitan Planning Organization
MPO) for the Wichita Falls Urban Transportation Study Area.
AGENCY REVIEW
This document has been submitted to the Nortex Council of
Governments for local review and to the Governor's Office of
Budget and Planning for completion of the Texas Review and
Comment System (TRACS) required of federal programs.
APPROVAL
This work program was approved by the Wichita Falls City
Council on April 17, 1990; and the Transportation Advisory
Committee of the Nortex Regional Planning Commission on
April 19, 1990. The MPO Policy Advisory Committee (PAC)
approved this work program on April 26, 1990.
3
INTRODUCTION
The planning Unified Work Program (UWP) provides
descriptive and scheduling details for work undertaken in
pursuit of the Wichita Falls Urban Transportation Study
process for fiscal year 1991 (October 1, 1990 through
September 30, 1991) .
ORGANIZATION AND MANAGEMENT
The mechanics established to carry out transportation
planning include the Urban Transportation Policy Advisory
Committee, Technical Committee and task forces as necessary
for special studies, the Planning and Zoning Commission of
the City of Wichita Falls, Nortex Regional Planning
Commission, the Texas State Department of Highways and
Public Transportation, and the functional agencies related
to these committees and organizations.
The Urban Transportation Policy Advisory Committee is
responsible for routine and policy guidance and direction
for the Urban Transportation Planning Process (UTPP) . The
Committee provides this direction through annual review of
current transportation plans and accomplishments,
formulation of general policies and recommendations relative
to transportation improvements, and certification of the
UWP. The Committee includes elected officials representing
the City of Wichita Falls, the County of Wichita, and all
state senators, representatives and United States
congressmen serving the study area.
In conclusion, the UWP has been developed as a
cooperative venture between the Metropolitan Planning
Organization (City of Wichita Falls) , the State Department
of Highways and Public Transportation, and other appropriate
agencies.
4
Task 1: ADMINISTRATION, TIP/UWP PREPARATION, TRAVEL/TRAINING
Project Description
Administration of the transportation planning process including
preparation of the TIP, UWP, audits, annual performance reports,
contracts, and related documents. Travel for the purposes of
relevant education, training, and/or coordination of the
transportation planning process shall be included in this item
along with charges for telephone, general office supplies, and
related items.
Previous Work
Annual TIP/UWP's, contracts, audits, related documents, continued
training, annual performance reports, annual transportation
planning conference, field reviews
Methodology
Administration shall be in accordance with the appropriate state
and federal regulations.Travel is anticipated to include
approximately three (3) workshops and/or training sessions
sponsored by FHWA, SDH&PT, UMTA, the U.S. Census Bureau, or
similar agencies. This will include the annual Transportation
Planning Conference.
Products
FY '92 UWP and TIP, annual performance report, audit reports,
similar documentation, and the annual transportation conference.
Responsibility
MPO.
Funding
Amount: $12 ,000
Source: PL-112 funds
5
Task 2: MAINTENANCE OF TRANSPORTATION PLANNING DATA SOURCES
Project Description
Data resources related to transportation planning shall be
maintained and updated.Continued progress of linking the
AutoCad system with other data sources will be made.
Previous Work
Population Element (1983)
Growth Trends (Annual)
Annual apartment vacancy survey (1987, 1988, 1989, 1990)
General Plan (1973)
Land Use Element (1984)
Vacant Land Study 1981Y (
Rural Water Sales Data (1986)
Thoroughfare Plan (1988)
AutoCad system and data bank
Methodology
Land Use Data Bank: Land use maps and associated data are
based on building permits and other data sources. A continual
update of this type of data is to be accomplished. Appropriate
planning materials (i.e. maps, computerized data files, census
data) may be purchased.
Population Studies: Demographic, economic, and housing
data will be collected and analyzed as needed.An annual
population trends document will be produced in addition to an
apartment vacancy survey.
Traffic Counts and Street Inventory: Current and
historical traffic count data and street inventory data will be
updated on microcomputer. Annual traffic counts will be
completed.
Products
Updated demographic, economic, and traffic data
Growth Trends (annual) .
Data resources and miscellaneous reports.
Apartment Vacancy Survey
Responsibility_
MPO.
Funding
Amount: $30, 000
Sources: PL-112 funds
6
Task 3: 1990 CENSUS PRODUCTS UTILIZATION
Project Description
As the 1990 census information becomes available, various census
documents and products will be purchased. These resources will
be used to report the demographic and housing conditions and
changes which are occurring in the study area.
Previous Work
Workshops sponsored by Census Bureau (1987, 1988 and 1989)
Review of 1990 census tract and block group boundaries
Submission of city base maps to Census Bureau (1987)
MPO Workplace file
Housing tracking system and identification of group housing
Methodology
To be determined by sponsor.
Products
Updated demographic profile
Various reports documenting the socio-economic and housing
conditions of the urbanized study area
Purchase of census products
Responsibility
MPO.
Funding
Amount: $6,900
Source: PL-112 funds
7
Task 4: UMTA TECHNICAL STUDIES
Project Description
To effectively serve the public needs, the transit system route
structure will be monitored with necessary changes made. Greater
emphasis will be directed to serve the handicapped and elderly.
The fare structure will be monitored throughout the year to
determine if revisions are warranted. DBE/WBE participation in
city contracts will continue to be solicited.
Efforts to utilize the private sector for delivering cost
effective and efficient transit services will continue throughout
the year. See attachment for complete policy statement regarding
private sector participation in public transportation programs.
Previous Work
Previous technical studies and DBE/WBE documentation.
Methodology
To be determined by sponsor.
Products
Analysis of the success of proposed changes, policy statements,
and related documents.
Responsibility
MPO - City Department of Aviation, Traffic, and Transportation.
Funding
Amount: $0. 00
Source: NA
8•
PROPOSED FUNDING
TASK PL-112 UMTA MATCH SDH&PT TOTAL
1 Administration,
training/travel $12, 000 12 , 000
2 Data maintenance 30, 000 30, 000
3 Census utilization 6,900 6,900
4 UMTA studies
TOTALS 48,900 48,900
PROPOSED TIMETABLE
Oct-Dec Jan-Mar Apr-Jun Jul-Sept
1990 1991 1991 1991
TASK 1
Administration
Documentation X X
Audit*
Travel/Training*
TASK 2
Data Maintenance
Land Use Data Bank X X X X
Trends Analysis X X
Traffic & misc. data X X X X
TASK 3
Census Utilization X X X X
TASK 4
UMTA Studies X X X X
To be determined.
9
FHWA SECTION 112
BASIS OF ESTIMATED COSTS FOR FY 1991
Account Description Amount
4113 Salaries 45, 600
4121 FICA (7.65)
4122 Retirement (6.78)
4123 Life Insurance (0. 3%)
4124 Health Insurance (4. 6%)
4220 Office supplies and books
including Census products 800
4410 Telephone charges 300
4430 Professional fees (audit)300
4442 Travel and training 1, 500
4471 Binding, printing & reproduction 400
TOTAL 48, 900
The cost figure for salaries includes basic operational
salaries as well as vacation, sick leave, holidays, emergency
leave, military leave, and professional leave. The professional
leave includes time spent at conventions and workshops and the
travel time associated with these. The salaries figure also
includes all employee benefits including, but not limited to,
retirement, insurances, and FICA.
In general, costs that are eligible for reimbursement shall be
limited to salary and wage costs for actual work performed,
approved labor additives, communication costs, reproduction
costs, equipment maintenance and purchase, consultant fees and
authorized travel and training.
The rate of reimbursement for fiscal year 1991 for eligible cost
items of "overhead" and "fringe benefits" has been determined to
be 22 . 05% and 14.20%, respectively (total = 36.25%) .The
individual elements of each factor are listed below:
OVERHEAD FRINGE BENEFITS
FICA 7.65 Holidays 2 .7%
Retirement 6.78 Vacations 5. 0%
Health Insurance 4 .6% Sick Leave 5.8%
Life Insurance 0.3% Emergency Lv 0. 1%
Unemployment Ins. 0. 1% Military Lv 0. 6%
Professional Leave 0. 1%
Tuition Assist. 0. 02%
Step Increases 2 . 5%
10
ATTACHMENT
Task 4: UMTA Technical Studies
WICHITA FALLS TRANSIT SYSTEM POLICY STATEMENT
ON PRIVATE SECTOR PARTICIPATION
IN PUBLIC TRANSPORTATION PROGRAMS
PURPOSE
The Wichita Falls Transit System supports fully the involvement
of the private sector in the delivery of services by WFTS. In
fulfilling its commitment to the transit dependent area, WFTS
will provide transit service in a cost effective and efficient
manner and, to the extent possible, utilize the private sector
for the delivery of this service. WFTS desires to achieve
significant cost savings and transportation benefits for
taxpayers and patrons while favorably impacting the economic,
cultural, and social life of the community.
STATEMENT OF POLICY
The policy is intended to achieve relative cost savings without
sacrificing the quality of service. There are five areas of
policy:
1. Staff Services. WFTS will examine existing activities to
determine where opportunities may exist for private sector
participation in necessary staff services. Where cost effective
and practical, WFTS will contract for staff services. WFTS will
use the private sector for work requirements, special projects
and peak needs, which can be addressed more cost effectively than
by permanent staff.
2. Facility Planning, Design, and Engineering. It is desirable
that the private sector be used in the planning, development and
alignment of transit routes and facilities. It is important that
WFTS, to the maximum extent practical, take advantage of
competent consulting services available in the private sector.
The priority for WFTS staff should be the management of these
activities.
3. Joint Development. Where it is in its best interest, for
example where it would not jeopardize WFTS's right to issue tax-
exempt bonds, WFTS will actively solicit the private sector in
the joint development of transit facilities in order to produce
economic savings to WFTS while at the same time simulating
economic development in the private sector.
4. Resolving Disputes. WFTS's existing procedures for resolution
of protests or grievances will be adapted to address disputes
that may arise under this policy. This procedure includes the
formation of a committee which makes recommendation to the
General Manager.
5. WFTS's Contractual Obligations. Nothing in this policy should
be construed to prevent WFTS from fulfilling its obligation with
11
employees, suppliers and other units of government.