Res 159-90 9/18/1990qq
RESOLUTION NO.
51 --
7
RESOLUTION TO RESCIND RESOLUTION 176-83
RELATING TO FEES FOR SERVICES PROVIDED BY
UTILITY COLLECTIONS ANS WATER DISTRIBUTION
AND MAINTENANCE DIVISIONS, RESOLUTION 197-83
RELATING TO FEES FOR WATER AND SEWER TAPS AND
OTHER UTILITY-RELATED SERVICES, RESOLUTION
127-84 RELATING TO RATE SCHEDULE FOR
LABORATORY SERVICES BY CITY WASTEWATER
TREATMENT PLANT, RESOLUTION 175-84 RELATING
TO SERVICE CHARGE FOR TEMPORARY TURN-ON AND
TURN-OFF OF WATER SERVICE, RESOLUTION 88-85
RELATING TO RATE FOR PERFORMING COD TESTS AT
CITY WASTEWATER TREATMENT PLANT, AND TO
UPDATE AND CONSOLIDATE INTO A SINGLE
RESOLUTION RATES FOR UTILITY LABOR,
EQUIPMENT, MATERIAL AND SERVICES.
WHEREAS, the City of Wichita Falls performs water and sewer
services and the cost of these services is recovered from the
user;
WHEREAS, the current fee schedule for these services is
enumerated in several previous resolutions and is out of date;
and,
WHEREAS, the Council desires to update the fee schedule and
consolidate the schedule into a single resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF WICHITA FALLS, TEXAS, THAT:
1. Section 1: The following resolutions are hereby
rescinded and the standard charges enumerated in the
following Sections are established for labor, material,
equipment and services.
Resolution 176-83 dated September 20, 1983 and
relating to fees for services provided by Utility
Collections and Water Distribution and Maintenance
Divisions.
t'
Resolution 197-83 dated October 4, 1983 and relating
to fees for water and sewer taps and other utility-
related services.
Resolution 127-84 dated July 3, 1984 and relating to
a rate schedule for laboratory services by the City
Wastewater Treatment Plant.
Resolution 175-84 dated October 2, 1984 and relating
to a service charge for temporary turn-on and turn-
off of water service at customer's request.
Resolution 88-85 dated July 16, 1985 and relating to
the rate for performing COD tests at the City
Wastewater Treatment Plant.
2 . Section II: Water And Sewer Taps. The charge for
standard and non-standard water taps and for standard
and non-standard sewer taps will be as follows:
A. Standard Water Tap: A 5/8" or 1" water tap that
does not exceed 15 ' of service line. Excavation is
performed in soil using a backhoe and no additional
construction (e.g. breaking of asphalt or concrete;
underground boring) is required.
Size of Tap Cost to Customer
5/8" 313 . 00
1" 330. 00
B. Non-Standard Water Tap: A water tap that is larger
than 1" or that includes a service line longer than
15 ' ; underground boring; breaking of concrete or
asphalt in street, alley or behind curb; or other
non-standard construction techniques such as
carrier pipe encasement or excavation by a means
other than backhoe.
Cost to Customer
Determined by job
estimate using Standard
charges in Section III
C. Standard Sewer Tap: A sewer tap installed on an
existing sewer main line or manhole using standard
equipment and materials where the property owner or
agent has excavated and no additional preparation
by the City is required, and where the excavation
meets OSHA standards for trench/excavation safety.
Type Tap Cost to Customer
Pipe 50. 00
Manhole 100. 00
D. Non-standard Sewer Tap: A sewer tap where non-
standard equipment or materials are required;
additional preparation by the City is required; or
trench/excavation safety to meet OSHA standards
must be achieved by the City.
Cost to Customer
Determined by job
estimate using standard
charges in Section III
3 . Section III: Standard charges for labor, equipment and
materials. The following standard charges for labor,
equipment and materials will be used to estimate non-
standard water and sewer taps and other special
utility-related services.
Item Cost to Customer
Labor (Normal duty hours) 9.75/hr.
Labor (Overtime) 14 . 63/hr
Materials Current cost to City +
10% for Administration
and Warehousing
Backhoe/ditcher/front 25. 00/hr. (4-hour
end loader with minimum)
operator
Crew truck with tools 20. 00/day (1/2 day
minimum)
Sewer rod truck, hydraulic 39.50/hr. (Normal duty
rodder or jet cleaner with hours) $49.25/hr.
crew Overtime)
Air compressor 20. 00/hr (2 hour
minimum)
Boring machine 25. 00/job
Tap machine (6" and 125. 00/job
smaller tap)
Tap machine (larger than 140. 00/job
6" tap)
4 . Section IV: Standard Charges for General Services:
The price for the general utility-related services
shown below will be as indicated:
Service Cost to Customer
Meter size reduction Determined by job
or increase estimate using standard
charges in Section III
Underground boring 160. 00/job
without casing (up to
60 ' )
Underground boring 2 . 67/ft.
without casing (60' and
over)
Underground boring with Boring cost plus
casing materials cost
Street cut for water tap 290. 00/job
Concrete/asphalt cut 85. 00/job
behind curb for water tap
Unload septic waste from 3 . 00 for load
vacuum truck at City Waste- originating within
water Treatment Plant city limits; $6. 00 for
load originating outside
city limits
Newcomers list 11.00
Returned check (no cut- 10. 00
off required)
Cut-off/reconnect(no 15. 00 plus deposit
deposit)
Remove/reinstall meter 25. 00 plus deposit or
up to 1") (no payment payment
or deposit)
Remove/reinstall meter Determine by job estimate
larger than 1") (no using standard charges
payment or deposit) in Section III
Padlock and saddle damage 11. 00
Water-off lid (customer 12 . 00
damage)
Cut-off/replacement 37. 00
customer damage)
Meter damage (customer 25. 00 plus parts or
tampering) meter
Plug customer service line 100. 00
install and remove plug)
Meter test (of accurate 20. 00
meter) (up to 1")
Meter test (of accurate 50. 00
meter) (larger than 1")
Reread and check for leaks 15. 00
reading accurate)
5. Section V: Wastewater Laboratory Test Charges: The
charge for each sample is indicated below for the
specified laboratory test:
CHARGE PER SAMPLE FOR SINGLE TEST
NUMBER OF SAMPLES 1-2 3 4 5 OR MORE
TEST
Biochemical Oxygen 9.54 8.81 8. 07 7. 34
Demand (BOD)
Total Suspended 6.88 6. 35 5.82 5.29
Solids (TSS)
Volatile Suspended 11. 00 10. 15 9 . 31 8.46
Solids (VSS) (includes
TSS test)
Hydrogen Ion 2 . 12 2 . 12 2 . 12 2 . 12
Concentration (pH)
Chlorine Residual 2 . 09 2 . 09 2. 09 2. 09
6. Section VI: Temporary Turn-Off of Water Service at the
Customer's Request: A fee of $15. 00 is established for
a customer-requested turn-off and turn-on of water
service, unless the service call is to be made on an
overtime basis in which case the fee shall be $20. 00.
The fee shall include bot h a turn-off and turn-on
service call to the meter. None of the fee in
refundable if only one service call is made. No charge
Ia
shall be made if the customer is requesting the turn-
off so that repairs can be made to the portion of
the house line between the City-owned water meter and
the customer-owned shut-off valve. The Director,
Department of Public Works, shall have the authority to
temporarily waive this charge when extreme weather
conditions require water to turned off at the meters to
prevent damages in buildings throughout the City.
7 . Section VII: The charges indicated above will be
effective for services performed on or after October 1,
1990.
PASSED AND APPROVED THIS THE 18th day o .eptember, 19. 0
f
M A Y O R
ATTEST:
CITY CLERK
RESOLUTION NO. / yfQ
RESOLUTION TO RESCIND RESOLUTION 176-83
RELATING TO FEES FOR SERVICES PROVIDED BY
UTILITY COLLECTIONS ANS WATER DISTRIBUTION
AND MAINTENANCE DIVISIONS, RESOLUTION 197-83
RELATING TO FEES FOR WATER AND SEWER TAPS AND
OTHER UTILITY-RELATED SERVICES, RESOLUTION
127-84 RELATING TO RATE SCHEDULE FOR
LABORATORY SERVICES BY CITY WASTEWATER
TREATMENT PLANT, RESOLUTION 175-84 RELATING
TO SERVICE CHARGE FOR TEMPORARY TURN-ON AND
TURN-OFF OF WATER SERVICE, RESOLUTION 88-85
RELATING TO RATE FOR PERFORMING COD TESTS AT
CITY WASTEWATER TREATMENT PLANT, AND TO
UPDATE AND CONSOLIDATE INTO A SINGLE
RESOLUTION RATES FOR UTILITY LABOR,
EQUIPMENT, MATERIAL AND SERVICES.
WHEREAS, the City of Wichita Falls performs water and sewer
services and the cost of these services is recovered from the
user;
WHEREAS, the current fee schedule for these services is
enumerated in several previous resolutions and is out of date;
and,
WHEREAS, the Council desires to update the fee schedule and
consolidate the schedule into a single resolution.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF WICHITA FALLS, TEXAS, THAT:
1. Section 1: The following resolutions are hereby
rescinded and the standard charges enumerated in the
following Sections are established for labor, material,
equipment and services.
Resolution 176-83 dated September 20, 1983 and
relating to fees for services provided by Utility
Collections and Water Distribution and Maintenance
Divisions.
Resolution 197-83 dated October 4, 1983 and relating
to fees for water and sewer taps and other utility-
related services.
Resolution 127-84 dated July 3, 1984 and relating to
a rate schedule for laboratory services by the City
Wastewater Treatment Plant.
Resolution 175-84 dated October 2, 1984 and relating
to a service charge for temporary turn-on and turn-
off of water service at customer's request.
Resolution 88-85 dated July 16, 1985 and relating to
the rate for performing COD tests at the City
Wastewater Treatment Plant.
2 . Section II: Water And Sewer Taps. The charge for
standard and non-standard water taps and for standard
and non-standard sewer taps will be as follows:
A. Standard Water Tap: A 5/8" or 1" water tap that
does not exceed 15' of service line. Excavation is
performed in soil using a backhoe and no additional
construction (e.g. breaking of asphalt or concrete;
underground boring) is required.
Size of Tap Cost to Customer
5/8" 313. 00
1" 330.00
B. Non-Standard Water Tap: A water tap that is larger
than 1" or that includes a service line longer than
15' ; underground boring; breaking of concrete or
asphalt in street, alley or behind curb; or other
non-standard construction techniques such as
carrier pipe encasement or excavation by a means
other than backhoe.
Cost to Customer
Determined by job
estimate using Standard
charges in Section III
C. Standard Sewer Tap: A sewer tap installed on an
existing sewer main line or manhole using standard
equipment and materials where the property owner or
agent has excavated and no additional preparation
by the City is required, and where the excavation
meets OSHA standards for trench/excavation safety.
Type Tap Cost to Customer
Pipe 50.00
Manhole 100.00
D. Non-standard Sewer Tap: A sewer tap where non-
standard equipment or materials are required;
additional preparation by the City is required; or
trench/excavation safety to meet OSHA standards
must be achieved by the City.
Cost to Customer
Determined by job
estimate using standard
charges in Section III
3. Section III: Standard charges for labor, equipment and
materials. The following standard charges for labor,
equipment and materials will be used to estimate non-
standard water and sewer taps and other special
utility-related services.
Item Cost to Customer
Labor (Normal duty hours) 9.75/hr.
Labor (Overtime) 14.63/hr
Materials Current cost to City +
10% for Administration
and Warehousing
Backhoe/ditcher/front 25.00/hr. (4-hour
end loader with minimum)
operator
Crew truck with tools 20.00/day (1/2 day
minimum)
Sewer rod truck, hydraulic 39.50/hr. (Normal duty
rodder or jet cleaner with hours) $49.25/hr.
crew Overtime)
Air compressor 20.00/hr (2 hour
minimum)
Boring machine 25.00/job
Tap machine (6" and 125.00/job
smaller tap)
Tap machine (larger than 140.00/job
6" tap)
4 . Section IV: Standard Charges for General Services:
The price for the general utility-related services
shown below will be as indicated:
Service Cost to Customer
Meter size reduction Determined by job
or increase estimate using standard
charges in Section III
Underground boring 160.00/job
without casing (up to
60' )
Underground boring 2.67gg ft.$
without casing (60' and
over)
Underground boring with Boring cost plus
casing materials cost
Street cut for water tap 290.00/job
Concrete/asphalt cut 85.00/job
behind curb for water tap
Unload septic waste from 3.00 for load
vacuum truck at City Waste- originating within
water Treatment Plant city limits; $6.00 for
load originating outside
city limits
Newcomers list 11.00
Returned check (no cut- 10.00
off required)
Cut-off/reconnect(no 15.00 plus deposit
deposit)
Remove/reinstall meter 25.00 plus deposit or
up to 1") (no payment payment
or deposit)
Remove/reinstall meter Determine by job estimate
larger than 1") (no using standard charges
payment or deposit) in Section III
Padlock and saddle damage 11.00
Water-off lid (customer 12.00
damage)
Cut-off/replacement 37.00
customer damage)
Meter damage (customer 25.00 plus parts or
tampering) meter
Plug customer service line 100.00
install and remove plug)
Meter test (of accurate 20.00
meter) (up to 1")
Meter test (of accurate 50.00
meter) (larger than 1")
Reread and check for leaks 15.00
reading accurate)
5. Section V: Wastewater Laboratory Test Charges: The
charge for each sample is indicated below for the
specified laboratory test:
CHARGE PER SAMPLE FOR SINGLE TEST
NUMBER OF SAMPLES 1-2 3 4 5 OR MORE
TEST
Biochemical Oxygen 9.54 8.81 8.07 7.34
Demand (BOD)
Total Suspended 6.88 6.35 5.82 5.29
Solids (TSS)
Volatile Suspended 11.00 10.15 9.31 8.46
Solids (VSS) (includes
TSS test)
Hydrogen Ion 2.12 2.12 2.12 2.12
Concentration (pH)
Chlorine Residual 2.09 2.09 2.09 2.09
6. Section VI: Temporary Turn-Off of Water Service at the
Customer's Request: A fee of $15.00 is established for
a customer-requested turn-off and turn-on of water
service, unless the service call is to be made on an
overtime basis in which case the fee shall be $20.00.
The fee shall include both a turn-off and turn-on
service call to the meter. None of the fee in
refundable if only one service call is made. No charge
shall be made if the customer is requesting the turn-
off so that repairs can be made to the portion of
the house line between the City-owned water meter and
the customer-owned shut-off valve. The Director,
Department of Public Works, shall have the authority to
temporarily waive this charge when extreme weather
conditions require water to turned off at the meters to
prevent damages in buildings throughout the City.
7. Section VII: The charges indicated above will be
effective for services performed on or after October 1,
1990.
PASSED AND APPROVED THIS THE 18th day of September, 1990.
4011°!!!:a„
MAYOR
ATTEST:
CITY LERK