Loading...
Res 154-90 9/4/1990RESOLUTION NO. 151 49 RESOLUTION TO APPROVE CONTRACT WITH ENGINEERING FIRMS OF ALAN PLUMMER & ASSOCIATES, INC. AND CORLETT, PROBST AND BOYD, INC. FOR ENGINEERING SERVICES RELATED TO TOXICITY REDUCTION EVALUATION. WHEREAS, the City of Wichita Falls is required by the Texas Water Commission to conduct a Toxicity Reduction Evaluation at the River Road Wastewater Treatment Plant; WHEREAS, the TRE Plan and Schedule developed by the engineering consulting firms of Alan Plummer & Associates, Inc. in association with Corlett, Probst and Boyd, Inc. has been approved by the Texas Water Commission; WHEREAS, Phase A of the Plan and Schedule begins on October 1, 1990 and requires specialized engineering services; WHEREAS, the City desires to continue using the engineering services of Alan Plummer & Associates, Inc. in association with Corlett, Probst and Boyd, Inc. ; and, WHEREAS, the Council has examined a proposed contract for the engineering services for the first phase of the TRE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The proposed contract with Alan Plummer & Associates, Inc. in association with Corlett, Probst and Boyd, Inc. is approved with a total maximum fee of $44,769. 00, and the City Manager is authorized to execute the contract for the City of Wichita Falls. PASSED AND APPROVED THIS THE 4th day of September, 1990. Z 1 P M A R ATTEST: 1 CITY CLERK