Loading...
Res 188-91 12/3/1991RESOLUTION NO. /7,7-fl RESOLUTION TO APPROVE CONTRACT WITH ENGINEERING CONSULTING FIRM FOR PRELIMINARY ENGINEERING REPORT ON NORTHSIDE WASTEWATER TREATMENT PLANT WHEREAS, the City of Wichita Falls operates the Northside Wastewater Treatment Plant under Texas Water Commission Discharge Permit No. 10509-005; WHEREAS, the discharge permit was renewed recently by the Texas Water Commission, and new, stricter effluent limitations were imposed effective September 1, 1994 ; WHEREAS, the renewed permit requires the City to submit an engineering report to the Texas Water Commission to show how the Northside Plant will meet the permitted effluent limitations; and, WHEREAS, the Council has reviewed a proposed contract to engage the engineering firm of Biggs and Mathews, Inc. of Wichita Falls, Texas, for preparing the engineering report. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The proposed engineering services contract with the firm of Biggs and Mathews, Inc. to conduct a preliminary engineering study for revised effluent limitations at the Northside Wastewater Treatment Plant is hereby approved at a maximum base fee of $8, 500. The City Manager is authorized to execute the contract for the City. PASSED AND APPROVED this the 3rd day ecember, 1•.• . 411117 C M A Y O R ATTEST: J _d„ / CITY CLER