Loading...
Res 168-92 11/3/1992RESOLUTION NO. RESOLUTION TO APPROVE THE CRITERIA FOR STORM WATER FACILITIES, REVISION B, IN THE CITY OF WICHITA FALLS WHEREAS, the City of Wichita Falls has previously adopted a Criteria for Storm Water Facilities; WHEREAS, the Council has examined the proposed Criteria for Storm Water Facilities, Revision B, and desires to adopt same. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The attached Criteria for Storm Water Facilities, Revision B, are hereby adopted. PASSED AND APPROVED THIS THE 3rd day o - ember, 1 M A 7401111111: 1ff ATTEST: CITY CLER Revision B CITY OF WICHITA FALLS CRITERIA FOR STORM WATER FACILITIES I. PURPOSE 1. 1 It is the purpose of this document to state the criteria to be used in designing storm water facilities which are to be constructed in the City of Wichita Falls, Texas. It is the intent of this document to state acceptable criteria while encouraging innovation and creativity on the part of the technically qualified designer. Designers are encouraged to coordinate their projects with the Engineering Division of the City of Wichita Falls early in the design process. 1. 2 This document accepts the premise that preventive measures addressing storm water are ultimately less expensive to the tax payers than implementation of corrective measures. It is recognized that the cost of storm water facilities ultimately is borne, and is inevitably passed on, to the user of the product via a higher cost of goods, housing, or services. 1. 3 These criteria are intended to supplement the storm water detention/retention ordinance fNe--43-68} as set forth in chapter 32 of the Municipal Code of Ordinances. II. DESIGN-FLAWS STORM RUNOFF 2 . 1 It is recognized that urban hydrology is both an art and a science. It is the intent of this document to use only a level of precision suitable for the situation under consideration. The level of precision shall be based on sound engineering judgement by technically qualified personnel. 2 . 2 Storm water flows from watersheds of less than 150 acres will be developed using the "rational formula" Q = CIA where: Q = Peak rate of runoff in cubic feet per second C = Coefficient of runoff (see Attachment 2) I = Rain intensity in inches per hour (see Attachment 1) Rainfall duration will be based on tc as defined below. A = Basn-area Drainage area of watershed in acres (Drainage area of development tract in acres,for detention) Revision B tc = Time of concentration in minutes equals the time required for a drop of water to flow from the most remote point in the drainage area to the point of interest. see Attachment 3) 2 . 3 For storm water flows from watersheds in excess of 150 acres, the engineering staff for the City of Wichita Falls should be consulted for guidance in methodology to be used. i74--Beterminat4en o reeiu4red st-eprage- eapaei'y tBetent4enfRetentlen-fl -rra ,e- 1--843-r-may- e-t rmir -by elthert a}---Me el 4€le el-re 3 i--hydrograph4e-me*kec -a8—set—fol.-tail--4n uHrban-Storm-Water-Management-Spee4al-Repent-Ne 7-49 3-7 Attaehment-37--3-t 4s--reeogrrized t -Y-- h -aa-set erth-4n- ttetehment-3--i-s--ge a a-l-l-y--ea -ier Leo--appy-and w4ii---norma-1.1.y----resu-1 t --4n-- 1c33cr--- ere.ge---volume refit lrements-than-fa}-abeve- III OPEN CHANNELS AND CULVERTS z 75 3.1 All storm open channels and eenelu4ts culverts will be designed to give a mean velocity, when flowing full, of not less than 2 . 0 feet per second. i-6 3.2 Open storm channels are acceptable and may be either paved er-unpaved concrete lined or grass lined for erosion control. It should be recognized that an--tmperved a grass lined channel has a much larger easement requirement as--eert peeeel---to----he---paved ehannei- than a concrete lined channel. Hnpaveel--cheer tei-s--skra-1+-3ee grass--- 4ned--for---eorrt r1. An additional consideration which should be born in mind by the designer is the potential displeasing aesthetics involved in an unpaved grass lined channel during periods of low flow. 33 The storm open channel er-eendtit; shall be designed far to convey a 10-year reoccurring storm event wltheut-tire--ei*a i.e er-esnelu4t--beeerti within the channel banks and a 100-year storm within a designated flowage easement or right of way. 3.4 All culverts and bridges shall be designed so as not to increase the 10-year flood stage upstream and to convey a 100-year storm without overflowing the street more than 12 inches above the roadway crown. 3.5 The storm facility shall be designed to prevent storm water from entering any structure during a 100-year recurring storm event. III IV INLETS AND eeNBWIT STORM DRAINS 37i 4.1 Inlets on streets and eenelu4ts storm drains shall be designed to meet the following conditions: Revision B a) The water depth in the public street shall not exceed top of curb during a 10-year storm event, nor 12 inches above top of curb during a 100-year storm event. b) The minimum storm sewer pipe diameter shall be 12 inches. c) New storm water conduits shall have required clearances with potable water and sanitary sewer lines as set forth in the applicable state regulations. d) Minimum velocity with the pipe flowing full shall be 2.5 feet per second. e) The hydraulic gradient line shall be computed and plotted for all sections of a storm drain system flowing full or under pressure flow. The 10-year hydraulic grade line shall not exceed 6 inches below the gutter flow line for all storm drains and inlets. V. DETENTION 5.1 Determination of storage capacity for watersheds under 150 acres will be calculate by the Modified rational h dro ra hic method as set forth in "Urban Storm Waterer Management Special Report No. 49" (see Attachment 4). Storm duration increments of 5 minutes shall be used to determine the critical capacity required for all sites larger than 10 acres, 2 minutes increments for sites between 5 and 10 acres and 1 minute increments for sites less than 5 acres. 5.2 For watersheds in excess of 150 acres, the engineering staff for the City of Wichita Falls should be consulted for guidance in methodology to be used. 5.3 Each detention facility shall contain a spillway for the control of potential storm water overflow. The spillway shall have adequate capacity to convey a 10-year storm from the watershed serving that basin. Erosion protection will be required to protect the spillway from the resulting velocities. A minimum freeboard of 6 inches is required in the storage area above the spillway flowline. 5.4 A minimum 10 foot access easement shall be provided to all City maintained basins 5.5 A conveyance channel or conduit will be required from the detention facility and spillway to a topographically identifiable receiving channel or public conduit downstream. An easement will be required for any portion of this conveyance which crosses private property. 5.6 Prior to the final acceptance of construction for any commercial detention facility, an as-built certification will be required. This certification requires the signature of a registered professional engineer, and shall state that the detention facility has been constructed in conformance with the approved plan for that site. The Certificate of Occupancy for each site will be withheld until its detention facility is approved. Revision B IV.: VI. CONSTRUCTION 471 6.1 Where the storm conduit crosses an existing or proposed sidewalk, driveway or street, the trench shall be backfilled with a suitable material compacted to 90% of modified proctor density, or portland cement stabilized sand containing no less than 1. 5 sacks per ton. 472 6.2 Manholes or inlets with rings and covers shall be installed on enclosed storm sewer systems as follows: a) At the end of each line. b) At all changes in grade, size, or vertical and horizontal alignment. c) At distances no greater than 600 feet for sewers of 30 inches or less in diameter. Vr VII SUBMITTALS 71 All drainage plans and calculations shall be prepared under the direct supervision of a registered professional engineer, licensed by the State of Texas, and shall bear the signature and seal of the submitting engineer. 7.2 A drainage plan shall include all pertinent information required by the City Engineer and may include but is not limited to the following: a) A topographic drainage area map delineating the tributary watershed. b) An engineering hydrologic analysis of storm water runoff under existing site conditions and under proposed developed conditions. Design calculations shall include runoff coefficients, time of concentration, area, rainfall intensities and flow rates. c) The location of all existing drainage channels, subsurface drainage facilities, drainage easements and other public and private utilities. d) The on-site 100-year flood boundaries of any major drainage system. e) An engineering hydraulic analysis for the control and conveyance of storm water runoff under proposed developed conditions. f) A master drainage plan shall be submitted for a parcel under active consideration for development. Construction plans will only be required at the time of final platting. 5- --Be gn-eaietiletlens-shell- rbitti. -erg--w-i-th--a-1-1--storm-weter eeneentrat en--area,--ra+n€aii-+ntensit es-and-€iew-ra€es- 5-2--The-tlra-irrase--ea-1-etrl-c ixr-etr9rn t -shell--i- e-l-ttee--a--eenteur map-de+4neat+net-the-appropriate-dra4nage-area7 Revision B 5-3--The-hpdraule-sr de-44 e-s e44- m,--a--1-C--year-sterm event- 5-4--Bea gn--eaietr+at arre--s3 171 - --stticmArt v a--suff a ent nature-to-defne-any-required-detentien-veiume- 5 75 7 . 3 All required detention facilities shall include an easement dedicated to the City. Such easement shall provide for: a) owner maintenance for detention facilities serving all other than single family residential land use. b) owner maintenance for multi-purpose detention facilities serving single family residential land use. c) City maintenance for sole purpose detention facilities serving single family residential land use.Such detention facilities shall include provisions for adequate access by City forces and shall be designed to minimize maintenance requirements. 576-7.4 Commercial development requiring detention shall include a site grading and drainage plan showing all storm water facilities. 57 --A-master-dreAnage-plan-shall-be-subm tted-fer-a-pareel-under aet4ve--ecxrs= ion--fer--de ei-opttetrt.---{?o 1.Mmn i t-plans w411-enly-be-requ red-at-the-tme-ef-f nal-plait ng- Q y an n W x E W 41 1 CC a Q XrM Y- JfaitU .NA o G. lOWza_OJI-W I-4JW a 000Ia_ i 1-11- I 0 zZZVW Ua0 <2000000000m0 . m 1O•p r-0 . m r W IA o n Al o 0 0 3 Q E)j i ,,... o xmssC r o 8 m :.unact.•:leiii::•hun:: :1----I-----: . C ."'A1:I .r.GI'.li e°=EAR-':Eijia:i!I:.I:I:---xe;111::..1::19. MWIYp NYII'1•NNIIN:IIIHI-AM.IYIIIIII1I1I,A III NI:I:YN•' MM NYNWYN MM.II. N W I.-,- IIM.I.=MII-ul11YY ANNY I. .I NNNNMNI. mlN1111 IumunwNl ii r.YA.w MA•AUlluII11II,sI 4 nWINY- MMMMMM . NIIINIII M MIS IMMI.M M..muiinii.IIIMII 0 MNM IMM.INII MIN uINII rAMMWAIMMIAM.. saNl.....1annum N NN..mam IIII NI.I.NN INN W.M.N. M.IMMW I. a r.INNIIIYI.I.NN MM YI..MaaUNYMIMNII M A /=1•1MJINW1111•Y1111YM MM MIIMNM4/M Ma..IMII.MIIMa..aa a MUM.I...a rAM.M'AN M.ANIN.NI1114MIIIraMMMMMMI.III.IIWMM111In11N III. A MM MINIM AIYNMYIIIH WA 0 MI MMM)IVA WMM MINI1A11NINI MI I W N. IMM.M M•MrAMM M rAMM M.AMM/A 1101011•1111111111111/All-A MMIMIIYNlNWI1 I WWII IIIIIIIIWap1l MM•M I MIMIIM MM•MMI.MIWI•1•11,11Y11•AMH 1••••••=1•Miumuunnannommsi 111a1M111MIMEMfMI..MU M • ••••rAM /. MAMWIINIIIt11N11WAl1MH Mmuumuu 11 n MIIIWINNE411111Y111 MMMMMM IMI1uIYIntu MM IIi 11141141'941114114 MMMMMM 11W11MYYW IMMIIM I unay.I1r1 A MM••MMIMNn IAn,11nM n 1 IINIMMM11HN11 IIHIIMIHNIMMIIHMIMIIIUII M1 1 IIIMIMIIM000A /VA/I I A WIWII.NIMYIIII 1 - 1IIII/NNNINNIIWIMIMIIYIIM 1111 H11111MINA Ansvmmousammewmananutnsi IA MONAMMINlllnllllallllllll:1111111 111111 IIIIMNIIIIIIIIIIIIU;1,111/AN1V.IIII I, •MMIa IEVAININININIII 1 U 1111,m1111111111mu1a1a1uumaun 111IOUM111uuu111144au•/IIIFIMI INarAa 111i1pJ innuNmium y img mimmU IN IInInI11111111mu11111N111IIIlsnuma111mi M/I rAII tmeranow N r onnunu auoNW Q miumimm muu mmluummmillim umminummia lumuna oriewa N mummumN1m1u11u 0 N D NU amNUmmumnimuommuuuululu mmenulull au ammorANNNr.at uu uummi: - o MMIXIWIWIIII111111UIIWWIIIIIIII11I11 1111111111111111 I1UUIIII11111 MMI1L11OMA IIKI III O%ENII MIUNIIIMIMINI x MINIUMIN1111111nlu1uu1111M1nnlnu1HIUMIUMINIWIIp'Alu/211WAMIAII IIKUNI r4 111M111UIUUUm1111lI MEM m IIMMU M111111111u111W111U1111111MUUMBIIWAIIIMIID i1IIII aIIIIIII/AIIIII•VtlI IU INNI IWNI_g r E`:e=!is- --= a I"zi=s. _€ =---- ___=___&` gam:=e c.—e_ Le:Lasicaii erg=_=s. 47 --. I==-c--=mac=z:s= ._==. - 6 _ ter-0 aEifEi6=,:1___r_,^I 1`*•:-.F., E[_s___i!!E__e. I EL"= .s_____=-.. = =_ ...e. 3."f Q' L: C L1 L:CI . CNN LII' 2r gIj===,• ri._-_ Sq1 CNN O - M ' n i:-AWS .1E's EtA 4IL:.. M EEEE-, y . aa:o nee .=.i.sins=-= '+4?en ark- rE«LEc =aEErs= effa_=a'i0 p mr=N.-.iA - er _ . sirs to===-_----"E:: g=f2. w» R s - ?e__: i 7 °e=5 ms: c E- o__ ::=. EESE EE ." EE-:: s-=2rsE?AFFlir rte i F4-:=.7.=.0_ r D r .. :•. Cin.%1'•'Y" ':- •..L CCCC C -.-- c NN : 1"':iiiw Narz 4.4.7........,.. EES~E «.x::i o F OG 11 pmara I-u:-m• -•----- .II;...r .rNNY rAI.::YN...AM r.......=.......,....... ' .„ 4 NI INM IC.. N. . M. Al••••A1.•N....NI N NN y NN- NMM. 1.®IMWTMINII III:=11i...•.. •'A :.A.a M.rAIMI. pIIV. E ..11.......1 N-tWIY.,l1NIl 1-VAVAINN.NII MMMMMM= NNNYNNUNII MMNInan.sa'. IY'Au..M/•.NY'A A a111I111 IIXIYIM•IIY.Io Il1 C MI NMMNIINN IINII-.IYI'•.Me.AI..IAe.'I rN Y NMNMM NM1IMINIIII•IMIwu.10....0 n•••••N•• ,'.Mf1WN... .N A'11II1ypIIIUI MN11YY1 M IM_MIMI NU1.u.n IIMINYNYM.NIM.VJM.N aa.'I '1.. YW1111 M.un.N 0 1.NMNINwNI1NI1NN.NwMwIW A...NI...'A NM a.rAMaaa M NM reellINWIININI0ell O MMMMM MMMIIMN YIIMIMIHIIMIMNINIMANIM/II VA "A M Aaa•••• M MM14YH11111N•WY111•NN MMMMMIMYIW.WNNIIYIIIIHIIIN 1/1/1111 It'AIM.=-iii a.aM.aY t.MNMINIIIU aMU.a11 le Ipj II.YIMllt,w11We Mt11Y1M11Y11 YYMI/MMIIII'AIIMI: III'//N•I/IIIMIWIINIY MWIIUApMMHIMt1M1I J MMMMMM MY1 MMMIAUIM,AIII•AII.I.II MIA MMILII•IIMWYINIIIMI JIIMMMMMMMIIIIYIMI .m.Ium MM1:MIMr IMMII M••MIIIM1,Il MNIMIIIIIMIMIYHY 1 IµypgryryMlMMM1MIM1 Aww"VAMI MN11I1I'/ I/•1/A M11MMI MMIIWIommu HMI MMMMMMmNMI IMIIIIIIHIIaNOA/IHAIIIIVAII1 AHEM M110111411111144111414114 LL Y miume mueuHMYuNMII III1A IIIIuAUIIIUiuIi MMM M.MMI IIIIIINYMm1 M Z w•Cr"N..-•r...-"--N.. 4- E".i.EEE""4N.•1, M yW"_N~'._~' M v5 E"•°w,.... N• N M___ NNm":1N .' :: a NN==N1 UIININN. MNI arm, ---I..:.1`.: A - W NI... MMMM MMM_M_WIIMIIMIlar Y Mw.w--i in:i1. 1N iM 111• ilw•:r-i.wM IIYIINIII.WINNON MN.ININN•.NI.• I1.- y11• N. 1Y. IN• IN. 11=11 AIM.. M.: 1:1 A..Y.-M.sN.N:A • N. u .jrI1= iN MYIIIIYNH.11111111MM1HteMel NIANNN.M.I rM MM Ma NIHNIIWIM.IWIWMY IINY MNMM M 1IYI INII.. II.Ynuramtn''A IIN.' AM ....s.aaa.a..IM NI..N...Naa.M..NN M MN I'.' INMIYNINYYM•. I...1.NMMMMMIIIMIIII.N.MIMIIIMINIt'YNtIpAY/N..I . IM NNN.MI..NM. M 4NNMIYINUMIM1IIY MMNM=. m I IHMVMIIIUIIIWI/M..IYY Ma•••M ' NMNIN..,MMN IIN. M.NN NN_NM I.IwnmMnw.mNi...••o M..MNIIIIYN In AMNnan..I/A.....I.MY.....rm....M..MI......fM INN.uu,unu N`• MMMMMM tlWtI1NWII'Awww M. MM=IIIWWINI.IaNNINNI1 H) MI 1 mei/A/NewisM.M•....M....l. IIMI.I.IIIIINIII IW W11111111I1NM W MM MIM p5 1 11 1111 WI) IMMIIMEMhhhh.& MMIIIIIU1111W IIN11NY11Mp11NYI11Ill' 111111' AI1.NaallarM I1NM.II M MWIIIIIIIIIIHIYIIMII f• MMMMMMII M IMP =NIP M Wr I MWM M1M1NN IININIII1 INIINYIIMIII M MMMMMM 1 111W 1111N/MIMIIIA IW. MM MiI111Y11I1.,..I111M1 Z MM N IYI IIIYIAYYItl/1111'1 1/I INIINIIININI IMIMW - MMMMMMII gin AIMntq•/MUarJlIIMV norm MM MWIIIIIIIIIIMYIIN M MMM WHIN=A luU 11uI 411411111114114111111141141111111111 u MIIINIINIMNMM n I 0uuauvI1% IuMg uu N NN IMtIM 1_IEu•M rluM I 1lHPAOMMf11lHluU11. uu nnIMUMN1M11 I mN1%NI /Ujuuu z111Iuuuu • . MMIN1uu u 1HIp1IUu emo WInuuuu uu •• EMS111 11111uM1 oYtl p nnllnmalll III1IlIAIIIIINNNNIIIIIa111111It11/IIIIIIINI MMMMMM N HIIIININItlNNlmll TABLE 5. RUNOFF COEFFICIENTS FOR RATIONAL FORMULA Type of Drainage Area Runoff Coefficient Business: Downtown areas 0.70-0.95 Neighborhood areas 0.50-0.70 Residential: Single-family areas 0.30-0.50 Multi-units, detached 0.40-0.60 Multi-units, attached 0.60-0.75 Suburban 0.25-0.40 Apartment dwelling areas 0.50-0.70 Industrial: Light areas 0.50-0.80 Heavy areas 0.60-0.90 Parks, cemeteries 0.10-0.25 Playgrounds 0.20-0.40 Railroad yard areas 0.20-0.40 Unimproved areas 0.10-0.30 Sand or sandy loam soil, 0-3% 0.15-0.20 Sand or sandy loam soil, 3-5% 0.20-0.25 Black or loesslal soil, 0-3% 0.18-0.25 Black or loesslal soil, 3-5% 0.25-0.30 Black or loesslal soil, >5% 0.70-0.80 Deep sand area 0.05-0.15 Steep grassed slopes 0.70 Lawns: Sandy soil, flat 2% 0.05-0.10 Sandy soil, average 2-7% 0.10-0.15 Sandy soil, steep, 7% 0.15-0.20 Heavy soil, flat 2% 0.13-0.17 Heavy soil, average 2-7% 0.18-0.22 Heavy soil, steep, 7%0.25-0.35 Streets: Asphaltic 0.70-0.95 Concrete 0.80-0-95 Brick 0.70-0.85 Drives and walks 0.75-0.85 Roofs 0.75-0.95 from ASCE, 1960 BRIDGE DIVISION HYDRAULIC MANUAL 12-85 2 - 15 ATTACHMENT 2 1 2 3 5 I 2 3 5 10 20 50 50 IIMI%IH___ 30 1111011111.1111111111111f 3 30 I-- 3 0C 1l1M1!41W 1 0 0 20 v = ,.E„ 1N Q 20 z ii 1111/10 c,: G, v d 10 J.wiii 0.4= MM v A w 0 i CITY OF WICHITA FALLS DEPARTMENT OF PUBLIC WORKS OCT 2Z 1882 EXAMPLE OF DETENTION AND RELEASE RATE REQUIREMENTS f OF z. CITY OF WICHITA FALLS ORDINANCE NO. 41-88 "DETENTION ORDINANCE" DESIGN PARAMETERS PROPOSED UNDEVELOPED CONDITION p T 30 Ac Single Family Residential Subdivision. 0 Ac. tc Undeveloped = 39 min. (per figure 5) n P C Undeveloped = 0.25 (per table 5)k``\ Iwo Undeveloped = 5.5 in/Hr (per plate 1A) Q1oo(Undeveloped) = (.25)(5.5 in/hr)(30 Ac) = 41.3 cfs DEVELOPED CONDITION tc (Developed) = 20 min. (per figure 5) Storm Duration Intensity C Factor Peak Flow minutes)inches/hour) cfs) 20 7.7 40 92 25 7.0 40 84 30 6.3 40 76 35 5.8 40 70 STORAGE CAPACITY REQUIRED: MODIFIED RATIONAL METHOD) 100 92 CFS 80 84 Cn 76 70 U 60 40 —/ 41_CFS(ALLOWABLE DISCHARGE)i 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 TIME (MIN.) DURATION STORAGE READ. min) Cu Ft ) 20 20MIN X 60 SEC/MIN (92 Cu Ft/SEC — 41 Cu Ft/SEC) = 61,200 25 25MIN X 60 SEC/MIN (84 Cu Ft/SEC — 41 Cu Ft/SEC) = 64,500 -40-- 30 30MIN X 60 SEC/MIN (76 Cu Ft/SEC — 41 Cu Ft/SEC) = 63,000 35 35MIN X 60 SEC/MIN (70 Cu Ft/SEC — 41 Cu Ft/SEC) = 60,900 DESIGN FOR 84,500 Cu Ft STORAGE CAPACITY 41.3 cfs RELEASE RATE DEEM' I ATTACHMENT 4