Loading...
Res 106-92 7/7/1992 RESOLUTION NO. RESOLUTION AUTHORIZING THE MAYOR TO SIGN A LETTER OF INTENT TO THE CORPS OF ENGINEERS, PLUM CREEK FEASIBILITY STUDY WHEREAS, the City of Wichita Falls entered an Agreement with the United States of America for the Plum Creek Flood Protection Study: and, WHEREAS, the actual work is nearing completion and needs a Letter of Intent to be attached for the final report and approval by the Corps of Engineers; WHEREAS, City staff recommends the Letter of Intent to be signed by the Mayor. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The Council authorizes the Mayor to sign the attached Letter of Intent to the U.S. Army Corps of Engineers. PASSED AND APPROVED THIS THE 7t. --•a of Ju • •- 40111mr MA OR ATTEST: 1C TY CLERK Wichita TEXAS July 7, 1992 Colonel F. Lee Smith, District Engineer Tulsa District, Corps of Engineers P.O. Box 61 Tulsa, OK 74121-0061 Dear Sir: The City of Wichita Falls, Texas after consultation with representatives of the residents of the affected area of Plum Creek vicinity and in accordance with your request of a letter of intent, state: That the City of Wichita Falls shall have no obligation to incur any cost of liability with regards to this project until such time that a written agreement may be entered into. The City of Wichita Falls shall have no obligation to enter into a written agreement unless the City in its sole discretion decides that it has sufficient public funds available to fund its share of the project. Subject to the same conditions and prior to project construction, the City of Wichita Falls understands that it must enter into a Local Cooperation Agreement as local sponsor to: - a. Subject to the non-Federal cost limit of 25% of the total project cost, provide without cost to the United States, in compliance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Public Law 91-646) , all lands, easements, and rights-of-way necessary for implementation, maintenance, and operation of the project; b. Subject to the non-Federal cost limit of 25% of the total project cost, bear the cost of all alterations and relocations of buildings, utilities, storm drains, roads, and other community services required for implementation of the project; c. Hold and save the United States free from damages due to implementation and subsequent operation and maintenance of the project, except damages due to the fault or negligence of the United States or its contractors; d. Maintain and operate the project, including mitigation features, after completion in accordance with regulations prescribed by the Secretary of the Army; e. Provide a cash contribution of 5% of the total project cost; 1300 7th Street P0.Box 1431 817/761-7611 Wichita Falls,Texas 76307 Colonel F. Lee Smith July 7, 1992 Page 2 f. Provide cash in excess of the Federal limitation; g. Prevent encroachment that could interfere with the maintenance and operation of the flood control project; h. At least annually, publicize and notify all interested parties that the project will not provide protection from the occurrence of storms greater than the project design flood; and i. Adopt and enforce floodplain regulations and assure compatibility of future development that would ensure an unobstructed floodway. Sincerely, Michael Lam, Mayor City of Wichita Falls ML/gd