Loading...
Res 017-93 1/19/1993RESOLUTION NO. /743 RESOLUTION TO APPROVE ENGINEERING CONTRACT WITH EMD, INC. FOR RECONDITIONING OF LAKE ARROWHEAD VARIABLE FREQUENCY DRIVE WHEREAS, the City of Wichita Falls has a variable frequency drive on the raw water pump system at Lake Arrowhead, and the drive is intended to save energy costs and prolong the service life of the um and motor;P P WHEREAS, the drive is not operating because of the failure of various electrical components, and the City desires to repair the drive and place it back into operation; WHEREAS, the variable frequency drive is a complex electrical component, and the City desires to engage an electrical engineering firm to coordinate the repairs, test the variable drive and place the drive back into operation; and, WHEREAS, the Council has considered a proposed contract with the engineering firm of EMD, Inc. for the stated purposes. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The engineering contract with the consulting firm of EMD, Inc. to provide technical services necessary to repair the Lake Arrowhead variable frequency drive is hereby approved with a maximum payment for the base engineering services identified in the contract to be $22, 000. The City Manager is authorized to execute the contract for the City. PASSED AND APPROVED this the 19th a 'ary, 99 . . M A O R ATTEST: eili41,14t. K, kizrzie cLERK