Res 142-94 9/6/1994r , RESOLUTION NO. I Ll-A - C1 LI RESOLUTION TO RESCIND RESOLUTION 159-90, AS AMENDED, PERTAINING TO FEES FOR SERVICES BY THE PUBLIC WORKS/UTILITIES DEPARTMENT AND TO APPROVE A NEW RESOLUTION TO UPDATE THE RATES FOR UTILITY LABOR, EQUIPMENT, MATERIAL AND SERVICES WHEREAS, the City of Wichita Falls performs certain waterYP and sewer services and the cost of these services is recovered from the user; WHEREAS, the current fee schedule for these services does not reflect all of the services currently performed, and the rates for services need to be updated; and, WHEREAS, the Council desires to update the fee schedule so that users pay a reasonable and equitable cost for services rendered. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, THAT: 1 . Section I : Resolution 159-90 dated September 18, 1990 with all amendments is hereby rescinded. 2 . Section II : Water and Sewer Taps. The charge for standard and non-standard water taps and for standard and non-standard sewer taps will be as follows : A. Standard Water Tap: A 5/8" or 1" water tap that does not exceed 15 ' of service line. Excavation is performed in soil using a backhoe and no additional construction (e.g. breaking of asphalt or concrete; underground boring) is required. Size of Tap Cost to Customer 5/8" 313 . 00 1" 330. 00 B. Non-Standard Water Tap: A water tap that is larger than 1" or that includes a service line longer than 15 ' ; underground boring; breaking of concrete or asphalt in street, alley or behind curb; or other non-standard construction techniques such as carrier pipe encasement or excavation by a means other than backhoe. Cost to Customer Determined by job estimate using standard charges in Section III C. Standard Sewer Tap: A sewer tap installed on an existing sewer main line or manhole using standard equipment and materials where the property owner or agent has excavated and no additional preparation by the City is required, and where the excavation meets OSHA standards for trench/excavation safety. t - Type Tat? Cost to Customer Pipe 50 . 00 Manhole 100 . 00 D. Non-standard Sewer Tap: A sewer tap where non- standard equipment or materials are required; additional preparation by the City is required; or trench/excavation safety to meet OSHA standards must be achieved by the City. Cost to Customer Determined by job estimate using standard charges in Section III 3 . Section III : Standard charges for labor, equipment and materials. The following standard charges for labor, equipment and materials will be used to estimate non- standard water and sewer taps and other special utility-related services. Item Cost to Customer Labor (Normal duty hours) 11.13/hr Labor (Overtime) 16.70/hr Materials Current cost to City + 10t for Administration and Warehousing Backhoe/ditcher/front-25.00/hr (4-hour end loader with minimum) operator Crew truck with tools 20 . 00/day (1/2 day minimum) Sewer rod truck, hydraulic 42.26/hr (Normal duty rodder or jet cleaner with hours) $53 .39/hr crew Overtime) c/2 Air compressor 20.00/hr 2-hour minimum) Boring machine 25 . 00/job Tap machine (6" and 125. 00/job smaller tap) Tap machine (larger than 140 . 00/job 6" tap) Lighted arrowboard 60 . 00/day (1/2 day minimum) Type I barricade 5 .00/day (1/2 day minimum) Standard traffic sign 5 . 00/day (1/2 day minimum) Standard traffic cone 3 . 00/day (1/2 day minimum) Standard traffic barrel 5 . 00/day (1/2 day minimum) 4 . Section IV: Standard Charges for General Services: The price for the general utility-related services shown below will be as indicated: Service COST TO CUSTOMER Meter size reduction Determine by job or increase estimate using standard charges in Section III Underground boring 160 . 00/job without casing (up to 60 ' ) Underground boring 2 .67/ft without casing (60 ' and over) Underground boring with Boring cost plus casing materials cost Street cut for water tap 290.00/job Concrete/asphalt cut 85 . 00/job behind curb for water tap Unload septic waste from 3 . 00 for load vacuum truck at City Waste- originating within water Treatment Plant city limits; $6 .00 for load originating outside city limits. Laboratory testing of Commercial lab cost plus septic load with excessive 10% for administration levels of FOG, TSS, or BOD and handling or with other constituents not acceptable at plant. Dewatering and disposal 0.20/gallon of grease and/or grit waste at City Waste- water Treatment Plant Newcomers list 11. 00 Returned check (no cut- 10 . 00 off required) Cut-off/reconnect (no 15.00 plus deposit deposit) Remove/reinstall meter 25.00 plus deposit or up to 1") (no payment payment or deposit) Remove/reinstall meter Determine by job estimate larger than 1") (no using standard charges payment or deposit) in Section III Padlock and saddle damage 11. 00 Water-off lid (customer 14 . 00 damage) Cut-off/replacement 52 .00 customer damage) Meter damage (customer 25.00 plus parts or tampering) meter Remove cut-off and plug 125. 00 customer service line install and remove cut- off and plug) Additional measures to Determine by job estimate prevent illegal use of using standard charges in water Section III Meter test (of accurate 20. 00 meter) (up to 1") Meter test (of accurate 50 . 00 meter) (larger than 1") 19,Z-99 Reread and check for leaks 15 . 00 reading accurate) Establish termporary 15. 00 (includes water account establishment of account, turn-on and turn-off of water) Deposit for Fire Hydrant 550 . 00 Meter Manual invoicing 10 .00 minimum charge) Standard barricading 30.00/day (1/2 day of excavation: use of minimum) not more than 3 Type I barricades with lights as necessary and/or plastic fencing, 3 standard traffic signs and 6standard traffic cones. Includes 1 on-site check per day. Non-standard barricading Determined by job of excavation: an estimate using standard excavation that requires charges in Section III. more than 3 Type I barricades, 3 standard traffic signs or 6 standard traffic cones. Includes 1 on-site check per day. 5 . Section V: Wastewater Laboratory Test Charges: The charge for each sample is indicated below for the specified laboratory test: CHARGE PER SAMPLE FOR SINGLE TEST NUMBER OF SAMPLES 1-2 3 4 5 OR MORE TEST Biochemical Oxygen 9.54 8 .81 8 . 07 7.34 Demand (BOD) Chemical Oxygen 9.54 8.81 8 . 07 7.34 Demand (COD) Carbonaceous Biochemical 9.54 8 . 81 8 . 07 7.34 Oxygen Demand (CBOD) Total Suspended 6.88 6.35 5 . 82 5.29 Solids (TSS) Volatile Suspended 11.00 10.15 9.31 8.46 Solids (VSS) (includes TSS test) Hydrogen Ion 2.12 2 .12 2 .12 2.12 Concentration (pH) Chlorine Residual 2.09 2 .09 2 . 09 2. 09 Ammonia Nitrogen 12 .46 11.33 10 .30 9 .36 Dissolved Oxygen 1.73 1.73 1.73 1.73 6 . Section VI : Temporary Turn-off of Water Service at the Customer' s Request: A fee of $15. 00 is established for a customer-requested turn-off and turn-on of water service, unless the service call is to be made on an overtime basis in which case the fee shall be $20. 00 . The fee shall include both a turn-off and turn-on service call to the meter.None of the fee is refundable if only one service call is made. No charge shall be made if the customer is requesting the turn- off so that repairs can be made to the portion of the house line between the City-owned water meter and the customer-owned shut-off valve. The Director, Department of Public Works, shall have the authority to temporarily waive this charge when extreme weather conditions require water to be turned off at the meters to prevent damages in buildings throughout the City. 7 . Section VII : The charges indicated above will be effective for services performed.on or after October 1, 1994 . PASSED AND APPROVED THIS THE 6th day of S- - eu =-f 1994 MAYOR ATTEST: II 1111 ' CITY CLERK itt? "f