Res 165-95 10/3/1995RESOLUTION NO.J(DFT-=
RESOLUTION TO APPROVE CONTRACT WITH CORLETT,
PROBST AND BOYD, INC. FOR ENGINEERING
SERVICES RELATED TO REPLACEMENT OF A MAJOR
SANITARY SEWER TRUNK LINE
WHEREAS, in response to an Environmental Protection Agency
Administrative Order, the City caused a study to be conducted,
such study known as the Sanitary Sewer Evaluation Study;
WHEREAS, the purpose of the study was to analyze the
sanitary sewer system and to determine the corrective action
necessary to prevent sanitary sewer overflows in the collection
system;
WHEREAS, the final report of the study recommends two (2)
broad programs of corrective action, a collection system
rehabilitation program and a capacity expansion program, said
programs to be conducted over a period of years;
WHEREAS, we are ready to proceed with the first year of
construction on the rehabilitation and expansion programs by
constructing a new sanitary sewer trunk main, and the City needs
to engage an engineering firm for the necessary engineering
services; and,
WHEREAS, the staff has recommended a proposed contract with
the firm of Corlett, Probst and Boyd, Inc. for the stated
engineering services.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF WICHITA FALLS, TEXAS, THAT:
The proposed contract for the project known as Arizona Trunk
Main Project is hereby approved, with a minimum engineering fee
for basic services of $197,434.45 and a maximum fee of
$241,308.79. The City Manager is authorized to execute the
contract for the City.
PASSED AND APPROVED this the 3rd day of October, 1995.
F-AINAIRI,
ATTEST:
h 0
AA "
Cloy ULEX&