Loading...
Res 032-97 2/18/1997RESOLUTION NO. RESOLUTION TO APPROVE ENGINEERING CONTRACT WITH CORLETT, PROBST & BOYD, INC. FOR AN ENGINEERING STUDY ON THE LAKE ARROWHEAD RAW WATER TRANSMISSION LINE WHEREAS, the citizens of Wichita Falls are dependent on the raw water transmission line from Lake Arrowhead to provide a reliable source of water for drinking purposes; WHEREAS, the 5411 pipe line has proven in recent years to be unreliable due to several major leaks; WHEREAS, Staff advises Council the leaks are the result of certain technical characteristics of the existing pipe line, and the pipe line will continue to be unreliable in the future, probably with increasing occurrence of leaks; WHEREAS, Staff believes it is necessary to conduct an engineering study to determine and cost the options for permanent repairs and/or replacement of part or all of the water line to ensure a reliable supply of raw water to our treatment plants; and, WHEREAS, the Council has examined a proposed contract with the engineering firm of Corlett, Probst & Boyd, Inc. to conduct the engineering study and to provide options to the City that will allow implementation of a planned program to repair/replace the raw water transmission line. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The contract with Corlett, Probst & Boyd, Inc. for the cited purposes is hereby approved in the amount of $37,500, and the City Manager is authorized to execute the contract for the City. PASSED AND APPROVED this the 18th day of February, 1997. A -Y 0 ATTEST:, 'J '�JC1TYCLERk