Loading...
Res 177-97 12/2/1997RESOLUTION NO. % 7—q7 RESOLUTION TO APPROVE ENGINEERING CONTRACT WITH BIGGS & MATHEWS, INC. FOR EPA INFORMATION COLLECTION RULE TREATMENT STUDY WHEREAS, the City of Wichita Falls is required by the federal Information Collection Rule to conduct a laboratory bench -scale treatment study and to report the results to the Environmental Protection Agency; WHEREAS, this study and the analysis and the data derived from the study exceed the expertise of the City staff and require the City to engage an engineering consultant; and, WHEREAS, the Council has examined a proposed contract with the engineering firm of Biggs & Mathews, Inc. to accomplish the stated treatment study. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The contract with Biggs & Mathews, Inc. to provide engineering services for the EPA Information Collection Rule Treatment Study is hereby approved with a maximum cost of $161,450 for the granulated activated carbon bench -scale study. If the City is required, under the EPA rules to change to a membrane filtration bench -scale study, a lump sum fee of an additional $16,000 will be paid to the Consultant. The City Manager is authorized to execute the contract for the City of Wichita Falls. PASSED AND APPROVED this the 2nd day of December, 1997. ATTEST: A I o 0 City Clerk i ZIMEW