Loading...
Res 124-99 10/19/1999RESOLUTION NO. RESOLUTION ACCEPTING THE TENANT RENOVATION PLAN SUBMITTED BY THE ARTS COUNCIL FOR PROPOSED RENOVATIONS TO THE FORMER KEMP PUBLIC LIBRARY BUILDING; DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW. WHEREAS, on October 8, 1998 the City Council authorized the Mayor to execute a fifty (50) year lease with the Arts Council, Wichita Falls Area, Inc. for the former Kemp Public Library; and WHEREAS, the lease requires the tenant to submit a Tenant Renovation Plan ( "Plan ") which must be approved by the City Council; and WHEREAS, the tenant has previously submitted a Plan, but now desires to update the Plan in order to commence renovation of the building; and WHEREAS, the Plan is attached as Exhibit A. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: SECTION 1. The five - phased Tenant Renovation Plan, attached as Exhibit A, is hereby approved. SECTION 2. Tenant shall not substantially alter the Plan as identified in Exhibit A during the course of design and/or construction without the prior consent of the City Council. SECTION 3. It is hereby officially found and determined that the meeting at which this resolution was passed was open to the public as required by law. PASSED AND APPROVED this the 19th day of October 1999. ATTEST: City Clerk MAYO The KEMP CENTER for the ARTS )940> 767 -'_737 ■ Fax (940) 767- 3956.1300 Lamar ■ P.O. Box 1 101 ■ Wichita Falb. l'!\ 76307 �SEEP— irw �X A THE KEMP September 24, 1999 The ;rr,c.nr,r „f WIC Iwo l wl, I—, Mr. Robert Powers bo rrrnc r,r,. ,,, Assistant City Manager City of Wichita Falls P.O. Box 1431 Wichita Falls, TX 76307 Dear Robert' DIREC"!t)16 At your request, I am submitting a Tenant Renovation Plan Pry ni,1:r Jahe H.111e, for the Kemp Library Building. 1st l'ic e Pr To date, The Arts Council has raised $1.4 million toward Dee Decker the total of $2.5 million, estimated for the total 2nd U4cPrr,r,ient adaptive reuse project cost. Sharn-h}rrenco Srrrrrcrn On the advice of the Project Architect, Michael Joanc.rnphdi Maloney,The Building Committee recommends the project l..r proceed toward final completion in the following distinct „r,,. PatNel „m and progressive stages or phases. N.lr =,n \1C"X1,110 In Phase I, the required demolition is completed in Delore,C.rlle.. conjunction with the extensive, but mandatory, asbestos removal. Matt L11- -il'il ua„tis rii,,.,nl In Phase II, before any remaining phases are bid, Pani Harmon structural modifications compatible with the revised John Mark ffir.dh; functions of the Kemp are to be commenced. This phase Bri.in Hull will be completed in tandem with Phase I. Execution of .annHurlter these two phases, prior to proceeding into the bidding Gadheti process for actual construction, is advantageous for the %I.rr))n following reasons: (1) The age of the existing f.�11111.1 : bui ldin.g, (2) lack of documentation of original I.ia Ptirrl construction, (3) incomplete and unclear knowledge of past Deny, „ttin, n,l renovations, and(4) possible unseen natural attrition. %�anl. =��- r�rt41 Sandi \Na „enmiller In Phase III, construction of the decorative iron fence will insure a required degree of privacy while securing the grounds. In Phase IV, the ground floor is addressed. Complete renovation of this level will allow the Arts Council and other related organizations to occupy new facilities. The central ticket office, small meeting spaces, and a small gift shop on this level will further insure generation of steady and daily traffic to the Kemp Center for the Arts. The kitchen facility will be available for outdoor events on the grounds. In this phase, major restroom facilities for the total facility will be completed. Utilities, not only to this level, but to all remaining levels, will be either completed and /or addressed. In Phase V the large arched windows, reopened in the North elevation during demolition, will be replaced, and the rework of the entrance vestibule will be completed. Cleaning, refurbishing, and water - proofing of the exterior will follow. Local fund raising efforts will continue through the end of 1999 and we hope to make several foundation deadlines in early 2000. The remainder of the building construction will be completed as funds are raised. If the city agrees to our proposed renovation plans, we could possibly schedule ground breaking before the end of this year. We all have concerns about this building remaining empty. Not only will we physically occupy the building but we will be able to utilize the grounds. The iron fence will facilitate the use of the grounds for art shows, weddings, and other outdoor activities as planned. Enclosed are the revised plans, The Tenant Renovation plan with cost estimates for each phase, a lasting of the Building Committee and The Development Group, and an overall project budget. Construction documents, including those for the fence and ground improvements, will be submitted to the city staff for approval prior to the bidding process. Thank you for your assistance with this. I will be out of town until October 4. Please feel free to contact Michael Maloney at 767 -0403 during my absence if additional information is needed. Sincerely., A e Project Dire for Kemp Center for the Arts Tenant Renovation Flan Goal and objectives To provide a headquarters with high public visit' 0ty for all the arts and humanities organizatioacxs in the community. To provide office and communal workspace for up to six arts organizations which will encourage efficiency and collaboration. To provide a permanent public arts gallery for local area artists. To provide low -cost meeting, workshop, performance and event space for arts groups. To increase community access to a historic building for private and public events and thereby increase access to the arts. To contribute to the restoration and renovation of downtown Wichita Falls by restoring the former cultural center of the community. The primary goal of this project is to restore the former Kemp Public Library into a state -of- the -art display facility for the diverse visual and performing arts groups within Wichita Falls and adjacent communities. Through creative planning, the facility will provide a 350 -seat auditorium, an art gallery, meeting and workshop space, offices and communal work and reception areas and open areas for social events such as weddings, family reunions and private parties. Building Renovation Project The vacant Kemp Public Library located in the original township of Wichita Falls, is approximately 19,200 square feet. The building sits on a large tree shaded city block, is accessible by public transportation and has adequate parking on the property and surrounding streets for large events. The building has three floors to be remodeled for use by the arts groups. The ground floor level will provide office space for the main office of the Arts Council, and the Wichita Falls Symphony. There will also be office space for up to 4 additional arts groups, a gift shop, a catering kitchen, and a large library meeting room. A central reception area will greet visitors and provide information. The second floor is accessed by stairs or elevator. This floor will be designed as a 350 -seat auditorium to be used as a public performance and rehearsal hall. It will contain a stage, lighting, sound system, projection equipment, and removable seating, allowing the space to quickly adapt to multiple public uses. A large well lighted art gallery on two levels adjoins this high - ceiling main hall. Assorted storage, work shops, educational spaces and dressing facilities complete the remaining areas around this great hall. The building design is totally ADA compliant. Phase I Demolition and Asbestos Removal (Total Project) $187,000 Phase II New Structural (Total Project) $210,000 Items include, but are not limited to, the installation of an area of new roof framing which will allow for some column relocation that is required to create a clear span for the performance stage. The existing main floor dome will remain with surrounding columns removed. Other structural revisions will further permit the removal of existing load bearing library stacks. Any structural deficiencies uncovered during demolition will be addressed at this time. Phase M Decorative iron Fence at rear and two sides of the grounds. 700 Linear Feet (open) @ $40.00 per foot 700 Linear Feet (Closed)@ $45.00 per foot $59,500 1400 Linear Feet Total Phase IV Ground Floor Reconstruction, Halls, Doors, Ceiling, Floor, Etc . $122,000 HVAC Ground Floor 26 tons @ $1350 per ton $35,000 Plumbing total. project, Rough --in $42,500 Fixtures installed on Ground Floor only Electrical (includes service to other levels ready for $98,500 construction) Fire System, repaired on ground floor $7,500 Kitchen Installed $45,000 Phase V Main Floor $34,000 Four Large Arched Windows @ North $34,750 Clean and Water -proof Exterior $22,000 Complete Vestibule Total $$97,750 Budget for total project Personnel_ Project Director 18 mo. $54,000 Architect @ 6% 105,245 Construction Costs Exterior 34,752 1st Floor 121,882 Main Floor 340,823 Mezzanine 37,417 Demolition Asbestos Removal 186,209 HVAC 187,000 Plumbing 48,500 Electrical 197,000 Decorative Fixtures 6,500 Fire Sprinkler Repair 10,300 Structural 210,000 Kitchen 45,000 Builders Risk 36,348 20% Contingency 292,346 Furnishings Furniture 57,050 Office Equipment 7,575 Stage Light /curtain 41,500 Portable Stage 26,000 Window Treatments 10,000 Telephone 12,000 Security System 45,000 Projector & Screen 2,500 Landscape Fence & Paving 400,000 TOTAL $2,514,947 Budget Explanation: All estimates were compiled after requesting 2 or more estimates from area suppliers. Stage and stage lighting costs based on equipment recommended by other centers. 0 Linda Bates Director Backdoor Theatre P.O. Box 896 76307 322 -5000 fax 322 -8167 H 692 -5897 Linda Ammons Norwest Bank P.O.Box 4377 76308 mobile 781 -4401 home 322 --8222 Jill Patterson Union Square Federal Credit Union Box 6050 SAFB 76311 720 -8000 fax 855 -0501 Carlana Fitch Executive Director Wichita Falls Symphony 4500 Seymour Hwy 76309 692 -2255 fax 692 -5566 Wanda Warren Arts Patron 2108 Miramar 76308 322 -3048 Ken Telg President Norwest Bank P.O.Box 4377 76308 766 -8550 Fax 766 -8572 SAFB representative to be named by General Cook H IN A DAPTTVE REUSE THE KENIIP CENTER FOR THE ARTS WIC =.l F ELLS, TEAS \IICRA LO. MAT,[]NEY- IRCETTECT - - -- - - -- DeussY Z339MIn CM OCT 0,47 .R ODHR pOEM&E s OTAti eggs -.� •l---- -- --- OR lCEMIZYn BODY 96MMY gm� FM Pe.YT87 RHOS IF—F--17-11 I Jex V HEMovs E339E :16 — DCLZ'IL% • 4 OREA BDON I a 1m IQ FM i I 7 1 TZIMBLRY \ 1 J 4RMAE1D BOOMS � - ANDOR �xmn.nx egas �— � xm x 3m — ALCM TO LRIRTBDDm ,.l. 1 LORT T. or L BOOM ABOVE STUDY REVISED NULN FLOOR PLAN a s t o a u SCALM Le Ylp9'L3HIILZ Opium To MW YENffiDIE EVW WMDOW . BLCa1V S�@A ODY.II3CfXlTD - E30LLW i! PSRR • 3mC8 HDIX cur ocT 3fMNQALLxRY M73 x.9 COrour i i WTALLWAIL N> .A-NA.DAPYlVE KEALP CENTER FOR TBE ARTS Ww ■1 + 1 i t CI oll I man .; TE]MRA9Y ammTBMIM W � ws z aaaa (}ALLZR4 9) lECZrA� OFW TO VAGM OR U301MM BOOM BNEOW mw — -------- - - - - -- - - ---- LL 1 � 'a�easowrl eZLuW OPBNW TO VEMMULN BXLGW OPdll ®10 ,ww ` VIUMMA / BOW WU=W oollulmTo \ f BEKLM STUDY REVISED SECOND FLOOR PLAN a e f a a s u SCAM W'4.0" FL=C=.om — W, BAZZO_Y7 BAnZ4G W!BALCO 1L BAEUM N� .A-ti; A.DAIYTIVE REL;SE THE KEAIP CENTER FOR THE ARTS WICMT A. F mss, TFXAS NaCHA EL O. 'MALONEY - ABCBT I i r.X'rL*7a i BLEU 3face. »N a1.m:1A16 F.rfmY � NSBANW L B3011 HAS M�' 4105 SAH fl88PIC6 COLS OOREEMB 0 :HYDO'R1 - -- - - - - -- MEL o o a F ism L F Wq�ur Iaax n a F Ai R R1oC J J xa - - - - - - --- - - - - -- - � U3FF82i aPT= MYU xft�oreBa I � � CEH AL WOBi BOOM 1&87113 ]rLK 00RI D0R OFF= WBHFI'A FALLS i9Arr.a nr.r, OPF[� 00880708 e7XPEB0NYCMCMP 4A ATS Y Ills OFFI®BPdLZ A8t600U.NC7L Ali z K79 WICETTAFALI9 LtQ7 x E� 4308A171 v I rrnwaaa A76 Y 1! 9zsf n"E I CONF. ax i LIBB►BT mm IDL A71z� VIRMULH -- D - -a- -- t V�FYBOi& ! E1® @A 4CFS9' O EMELL4 STUDY REVISED GROUND FLOOR PLAN N a a e 1 o a is SCALD Le " -11 -0" MEMBER ORGANIZATIONS OF ARTS COUNCIL Arts Organizations American Guild of Organists American Sewing Guild Backdoor Theatre Boys Club of Burkburnett Burkburnett,Tx Clay County Art Association Archer City, TX Crews Music Academy First African Violet Society First United Methodist Music & Arts Department Greater W.F. Arts Alliance Kell House Museum Wichita County Heritage Society Midwestern State University Artist Lecture Series Midwestern State University Division of Fine Arts MSU McMurtry Center for the Arts and Humanities North Texas Mens Chorus North Texas Tole chapter Picture Show Players, Archer City, TX Pro Musica Red River Chapter Native Plant Society Red River Embroiderers' Guild River Bend Nature Works Red River Orchid Society Sheppard Air Force Base Community Chorus Texas Chp. American Needlepoint Guild Trails and Tales of Boomtown,USA Burkburnett TX University United Methodist Music Department W.F. Art Association W.F_ Chamber Orchestra W.F. Community Messiah W.F. High School Band W.F. Museum and Art Center W.F. Musicians Club W.F. Symphony Orchestra Women's Y Youth Opportunity Center Youth Symphony Orchestra Other organizational members 100 P1us,A Women's Leadership Alliance Alzheimer's Association American Red Cross Center for Non - Profit Management Desk & Derrick Club Habitat for Humanity KTEO 90.5 FM League of Women Voters North Texas Rehabilitation Center Waurika Chamber of Commerce Waurika OK Wichita County Family &Community Science Clubs W.F. Business and Professional Women Woman's Forum N Building Development Group: A broadbased community group to over see the building planning and construction EXECUTIVE BUILDING COMMITTEE David White Symphony President White Realty and Management Co. 908 8th Street 76301 Tel. 723 -1660 fax Lin Purtle, Project Director Arts Council 2423 Brentwood Drive 76308 Tel. 696 -5262 Mayor Kay Yeager 2111 Avondale 76308 Tel.767 -0683 John Hirschi Arts Council Board 3305 Buchannan 76308 tel 691 -6001 691 -4842 Dave Clark, Director City Planning 515 P.O.Box 1431 76307 Tel 761 -7451 fax 761 -7461 Leo Lerma Lerma Concrete Construction 4324 View Park 76305 761 - 0466,322 -1321 Remaining members of Development Group Gail Key,Arts Council Past President lst Violin Symphony, Director of Youth Orchestra, Chamber Orchestra 1801 Woodrow 76301 Tel. 322 --0753 fax761 -5367 Julie Hanes Arts Council President 4501 Wynnwood 76308 Tel. 692 -7086 fax 723 -0737 Dr. Connie Welsh SFISD Superintendent 1104 Broad St. 76301 Tel. 720 -3303 fax 720 -3228 11 i i Arthur Bea Williams, City Council 1602 Andrews Dr. 76301 766 -0874 Dr. Ron Fischli Head MSU Fine Arts Dept. Fain Fine Arts Center B 128 3410 Taft 76308 397 -4243 Lynn Dickerson Publisher Times Record News P.O. Box 120 76307 Tel 720 -3491 fax 720 -3414 Joe Johnson Key Realty 2608 A Kemp 76309 767.6677 Joyce Lo Musician 3215 Glenwood 76308 322 -1030 Elizabeth Yeager Edwards Arts Patron 3102 Speedway 76308 766 -4762 Ken Van Loh President Trails & Tales Owens Brumley Insurance 1408 Eighth 76301 766 -4321 Gary Patrick President Wichita Heritage Society 3100 Hamilton Blvd. 76308 766 - 0126,766 -0123 Alice West Arts Patron 2108 Ellingham 76308- 767 -6581 John Barfield WF Museum President Freemon Shapard & Story, Accts 500 City National Bldg. 76303 322 -4436 fax 761 -3365 Ron Mertins Chairman of Board of Commerce and Industry 218 Hamilton Bldg. 76301 723 -2741 fax 723 -8773 Kerry Roach Attorney 807 8th 76301 Tel 322 -7856 fax 322 -1204 Polly Cox Artist, Art Association 2609 Amherst 76308 692 -2324 Otis Akins, RN State Hospital 1313 Harding 76301 723 -9635 Miriam Mas Region IX Education Service Center 301 Loop 11 76305 322 - 6928,767 -7000H fax767 -3836 2105 Wenonah 09 Steve Grey Artist, Stellar Art Gallery 1815 Huff 76301 767 -5840, 723 -4303 Judy Aldaco Greater Wichita Falls Alliance for Performing Arts Washington Jackson Elementary 1300 Harding 76303 691 -5868 Dr. Brian Hull physician /arts patron 4031 Medical Dr. 76308 696 -7200 692 -0824 Mary Ferguson Junior League, Wichita Falls 2017 Hiawatha 76309 696 -5201 Jean Hall Backdoor Theatre 1909 Lucille Ave. 76301 767 -1920