Res 124-99 10/19/1999RESOLUTION NO.
RESOLUTION ACCEPTING THE TENANT RENOVATION PLAN
SUBMITTED BY THE ARTS COUNCIL FOR PROPOSED
RENOVATIONS TO THE FORMER KEMP PUBLIC LIBRARY BUILDING;
DETERMINING THAT THE MEETING AT WHICH THIS RESOLUTION
WAS PASSED WAS OPEN TO THE PUBLIC AS REQUIRED BY LAW.
WHEREAS, on October 8, 1998 the City Council authorized the Mayor to
execute a fifty (50) year lease with the Arts Council, Wichita Falls Area, Inc. for the
former Kemp Public Library; and
WHEREAS, the lease requires the tenant to submit a Tenant Renovation Plan
( "Plan ") which must be approved by the City Council; and
WHEREAS, the tenant has previously submitted a Plan, but now desires to
update the Plan in order to commence renovation of the building; and
WHEREAS, the Plan is attached as Exhibit A.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
SECTION 1. The five - phased Tenant Renovation Plan, attached as Exhibit A, is
hereby approved.
SECTION 2. Tenant shall not substantially alter the Plan as identified in Exhibit
A during the course of design and/or construction without the prior consent of the City
Council.
SECTION 3. It is hereby officially found and determined that the meeting at
which this resolution was passed was open to the public as required by law.
PASSED AND APPROVED this the 19th day of October 1999.
ATTEST:
City Clerk
MAYO
The KEMP CENTER for the ARTS )940> 767 -'_737 ■ Fax (940) 767- 3956.1300 Lamar ■ P.O. Box 1 101 ■ Wichita Falb. l'!\ 76307
�SEEP— irw
�X A THE
KEMP
September 24, 1999 The ;rr,c.nr,r „f
WIC Iwo l wl, I—,
Mr. Robert Powers bo rrrnc r,r,. ,,,
Assistant City Manager
City of Wichita Falls
P.O. Box 1431
Wichita Falls, TX 76307
Dear Robert' DIREC"!t)16
At your request, I am submitting a Tenant Renovation Plan
Pry ni,1:r
Jahe H.111e,
for the Kemp Library Building.
1st l'ic e Pr
To date, The Arts Council has raised $1.4 million toward
Dee Decker
the total of $2.5 million, estimated for the total
2nd U4cPrr,r,ient
adaptive reuse project cost.
Sharn-h}rrenco
Srrrrrcrn
On the advice of the Project Architect, Michael
Joanc.rnphdi
Maloney,The Building Committee recommends the project
l..r
proceed toward final completion in the following distinct
„r,,.
PatNel „m
and progressive stages or phases.
N.lr =,n \1C"X1,110
In Phase I, the required demolition is completed in
Delore,C.rlle..
conjunction with the extensive, but mandatory, asbestos
removal.
Matt L11- -il'il
ua„tis rii,,.,nl
In Phase II, before any remaining phases are bid,
Pani Harmon
structural modifications compatible with the revised
John Mark ffir.dh;
functions of the Kemp are to be commenced. This phase
Bri.in Hull
will be completed in tandem with Phase I. Execution of
.annHurlter
these two phases, prior to proceeding into the bidding
Gadheti
process for actual construction, is advantageous for the
%I.rr))n
following reasons: (1) The age of the existing
f.�11111.1 :
bui ldin.g, (2) lack of documentation of original
I.ia Ptirrl
construction, (3) incomplete and unclear knowledge of past
Deny, „ttin, n,l
renovations, and(4) possible unseen natural attrition.
%�anl. =��- r�rt41
Sandi \Na „enmiller
In Phase III, construction of the decorative iron fence
will insure a required degree of privacy while securing
the grounds.
In Phase IV, the ground floor is addressed. Complete
renovation of this level will allow the Arts Council and
other related organizations to occupy new facilities.
The central ticket office, small meeting spaces, and a
small gift shop on this level will further insure
generation of steady and daily traffic to the Kemp Center
for the Arts. The kitchen facility will be available for
outdoor events on the grounds. In this phase, major
restroom facilities for the total facility will be
completed. Utilities, not only to this level, but to all
remaining levels, will be either completed and /or
addressed.
In Phase V the large arched windows, reopened in the
North elevation during demolition, will be replaced, and
the rework of the entrance vestibule will be completed.
Cleaning, refurbishing, and water - proofing of the
exterior will follow.
Local fund raising efforts will continue through the end
of 1999 and we hope to make several foundation deadlines
in early 2000. The remainder of the building
construction will be completed as funds are raised.
If the city agrees to our proposed renovation plans, we
could possibly schedule ground breaking before the end of
this year. We all have concerns about this building
remaining empty. Not only will we physically occupy the
building but we will be able to utilize the grounds. The
iron fence will facilitate the use of the grounds for art
shows, weddings, and other outdoor activities as planned.
Enclosed are the revised plans, The Tenant Renovation
plan with cost estimates for each phase, a lasting of the
Building Committee and The Development Group, and an
overall project budget. Construction documents,
including those for the fence and ground improvements,
will be submitted to the city staff for approval prior to
the bidding process.
Thank you for your assistance with this. I will be out
of town until October 4. Please feel free to contact
Michael Maloney at 767 -0403 during my absence if
additional information is needed.
Sincerely.,
A
e
Project Dire for
Kemp Center for the Arts
Tenant Renovation Flan
Goal and objectives
To provide a headquarters with high public visit' 0ty for all the arts and
humanities organizatioacxs in the community.
To provide office and communal workspace for up to six arts organizations
which will encourage efficiency and collaboration.
To provide a permanent public arts gallery for local area artists.
To provide low -cost meeting, workshop, performance and event space for arts
groups.
To increase community access to a historic building for private and public
events and thereby increase access to the arts.
To contribute to the restoration and renovation of downtown Wichita Falls by
restoring the former cultural center of the community.
The primary goal of this project is to restore the former Kemp Public Library into a
state -of- the -art display facility for the diverse visual and performing arts groups
within Wichita Falls and adjacent communities. Through creative planning, the
facility will provide a 350 -seat auditorium, an art gallery, meeting and workshop
space, offices and communal work and reception areas and open areas for social
events such as weddings, family reunions and private parties.
Building Renovation Project
The vacant Kemp Public Library located in the original township of Wichita Falls, is
approximately 19,200 square feet. The building sits on a large tree shaded city
block, is accessible by public transportation and has adequate parking on the
property and surrounding streets for large events. The building has three floors
to be remodeled for use by the arts groups.
The ground floor level will provide office space for the main office of the Arts
Council, and the Wichita Falls Symphony. There will also be office space for up to 4
additional arts groups, a gift shop, a catering kitchen, and a large library meeting
room. A central reception area will greet visitors and provide information.
The second floor is accessed by stairs or elevator. This floor will be designed as a
350 -seat auditorium to be used as a public performance and rehearsal hall. It will
contain a stage, lighting, sound system, projection equipment, and removable
seating, allowing the space to quickly adapt to multiple public uses. A large well
lighted art gallery on two levels adjoins this high - ceiling main hall. Assorted
storage, work shops, educational spaces and dressing facilities complete the
remaining areas around this great hall. The building design is totally ADA
compliant.
Phase I
Demolition and Asbestos Removal (Total Project) $187,000
Phase II
New Structural (Total Project) $210,000
Items include, but are not limited to, the installation of an area of new
roof framing which will allow for some column relocation that is required
to create a clear span for the performance stage. The existing main
floor dome will remain with surrounding columns removed. Other
structural revisions will further permit the removal of existing load
bearing library stacks. Any structural deficiencies uncovered during
demolition will be addressed at this time.
Phase M
Decorative iron Fence at rear and two sides of the grounds.
700 Linear Feet (open) @ $40.00 per foot
700 Linear Feet (Closed)@ $45.00 per foot $59,500
1400 Linear Feet Total
Phase IV
Ground Floor Reconstruction, Halls, Doors, Ceiling, Floor, Etc . $122,000
HVAC Ground Floor 26 tons @ $1350 per ton $35,000
Plumbing total. project, Rough --in $42,500
Fixtures installed on Ground Floor only
Electrical (includes service to other levels ready for $98,500
construction)
Fire System, repaired on ground floor $7,500
Kitchen Installed $45,000
Phase V
Main Floor $34,000
Four Large Arched Windows @ North $34,750
Clean and Water -proof Exterior $22,000
Complete Vestibule
Total $$97,750
Budget for total project
Personnel_
Project Director 18 mo. $54,000
Architect @ 6% 105,245
Construction Costs
Exterior
34,752
1st Floor
121,882
Main Floor
340,823
Mezzanine
37,417
Demolition Asbestos Removal
186,209
HVAC
187,000
Plumbing
48,500
Electrical
197,000
Decorative Fixtures
6,500
Fire Sprinkler Repair
10,300
Structural
210,000
Kitchen
45,000
Builders Risk
36,348
20% Contingency
292,346
Furnishings
Furniture
57,050
Office Equipment
7,575
Stage Light /curtain
41,500
Portable Stage
26,000
Window Treatments
10,000
Telephone
12,000
Security System
45,000
Projector & Screen
2,500
Landscape Fence & Paving
400,000
TOTAL $2,514,947
Budget Explanation: All estimates were compiled after requesting
2 or more estimates from area suppliers. Stage and stage
lighting costs based on equipment recommended by other centers.
0
Linda Bates
Director Backdoor Theatre
P.O. Box 896
76307 322 -5000 fax 322 -8167 H 692 -5897
Linda Ammons
Norwest Bank
P.O.Box 4377
76308 mobile 781 -4401 home 322 --8222
Jill Patterson
Union Square Federal Credit Union
Box 6050
SAFB
76311 720 -8000 fax 855 -0501
Carlana Fitch
Executive Director
Wichita Falls Symphony
4500 Seymour Hwy
76309 692 -2255 fax 692 -5566
Wanda Warren
Arts Patron
2108 Miramar
76308 322 -3048
Ken Telg
President Norwest Bank
P.O.Box 4377
76308
766 -8550 Fax 766 -8572
SAFB representative to be named by General Cook
H
IN A DAPTTVE REUSE
THE KENIIP CENTER FOR THE ARTS
WIC =.l F ELLS, TEAS
\IICRA LO. MAT,[]NEY- IRCETTECT
- - -- - - -- DeussY
Z339MIn CM OCT
0,47 .R
ODHR
pOEM&E s OTAti eggs
-.� •l---- -- --- OR
lCEMIZYn BODY
96MMY gm� FM
Pe.YT87
RHOS IF—F--17-11 I Jex
V HEMovs
E339E :16
— DCLZ'IL%
• 4
OREA BDON
I a 1m IQ FM i
I 7
1
TZIMBLRY \ 1 J
4RMAE1D BOOMS � -
ANDOR
�xmn.nx egas �— �
xm x 3m —
ALCM TO
LRIRTBDDm
,.l. 1 LORT
T. or L
BOOM ABOVE
STUDY
REVISED NULN FLOOR PLAN
a s t o a u
SCALM Le
Ylp9'L3HIILZ
Opium To MW
YENffiDIE EVW WMDOW
. BLCa1V
S�@A
ODY.II3CfXlTD
- E30LLW
i!
PSRR
• 3mC8
HDIX
cur ocT
3fMNQALLxRY
M73 x.9
COrour
i
i
WTALLWAIL
N>
.A-NA.DAPYlVE
KEALP CENTER FOR TBE ARTS
Ww ■1 +
1 i t CI
oll
I
man
.;
TE]MRA9Y
ammTBMIM
W �
ws z aaaa
(}ALLZR4 9) lECZrA�
OFW TO
VAGM OR
U301MM BOOM
BNEOW
mw
— -------- - - - - -- - - ----
LL
1
� 'a�easowrl
eZLuW
OPBNW TO
VEMMULN
BXLGW
OPdll ®10 ,ww
` VIUMMA / BOW WU=W
oollulmTo
\ f
BEKLM
STUDY
REVISED SECOND FLOOR PLAN
a e f a a s u
SCAM W'4.0"
FL=C=.om —
W, BAZZO_Y7 BAnZ4G
W!BALCO 1L BAEUM
N�
.A-ti; A.DAIYTIVE REL;SE
THE KEAIP CENTER FOR THE ARTS
WICMT A. F mss, TFXAS
NaCHA EL O. 'MALONEY - ABCBT
I
i
r.X'rL*7a
i
BLEU
3face.
»N
a1.m:1A16
F.rfmY
�
NSBANW L B3011
HAS
M�'
4105
SAH
fl88PIC6
COLS
OOREEMB
0
:HYDO'R1 - -- - - - - --
MEL
o
o a
F
ism
L F
Wq�ur
Iaax n
a F
Ai R
R1oC
J
J
xa
- - - - - -
--- - - - - -- -
�
U3FF82i
aPT=
MYU
xft�oreBa
I
�
�
CEH AL
WOBi BOOM
1&87113
]rLK
00RI D0R
OFF=
WBHFI'A FALLS
i9Arr.a nr.r,
OPF[�
00880708
e7XPEB0NYCMCMP 4A
ATS Y Ills
OFFI®BPdLZ
A8t600U.NC7L
Ali z K79
WICETTAFALI9
LtQ7 x E�
4308A171
v
I
rrnwaaa
A76 Y 1!
9zsf
n"E
I CONF. ax
i LIBB►BT
mm IDL
A71z�
VIRMULH
-- D - -a- --
t V�FYBOi& !
E1® @A 4CFS9' O EMELL4
STUDY
REVISED GROUND FLOOR PLAN N
a a e 1 o a is
SCALD Le " -11 -0"
MEMBER ORGANIZATIONS OF ARTS COUNCIL
Arts Organizations
American Guild of Organists
American Sewing Guild
Backdoor Theatre
Boys Club of Burkburnett Burkburnett,Tx
Clay County Art Association Archer City, TX
Crews Music Academy
First African Violet Society
First United Methodist Music & Arts Department
Greater W.F. Arts Alliance
Kell House Museum
Wichita County Heritage Society
Midwestern State University Artist Lecture Series
Midwestern State University Division of Fine Arts
MSU McMurtry Center for the Arts and Humanities
North Texas Mens Chorus
North Texas Tole chapter
Picture Show Players, Archer City, TX
Pro Musica
Red River Chapter Native Plant Society
Red River Embroiderers' Guild
River Bend Nature Works
Red River Orchid Society
Sheppard Air Force Base Community Chorus
Texas Chp. American Needlepoint Guild
Trails and Tales of Boomtown,USA Burkburnett TX
University United Methodist Music Department
W.F. Art Association
W.F_ Chamber Orchestra
W.F. Community Messiah
W.F. High School Band
W.F. Museum and Art Center
W.F. Musicians Club
W.F. Symphony Orchestra
Women's Y
Youth Opportunity Center
Youth Symphony Orchestra
Other organizational members
100 P1us,A Women's Leadership Alliance
Alzheimer's Association
American Red Cross
Center for Non - Profit Management
Desk & Derrick Club
Habitat for Humanity
KTEO 90.5 FM
League of Women Voters
North Texas Rehabilitation Center
Waurika Chamber of Commerce Waurika OK
Wichita County Family &Community Science Clubs
W.F. Business and Professional Women
Woman's Forum
N
Building Development Group: A broadbased
community group to over see the building planning and
construction
EXECUTIVE BUILDING COMMITTEE
David White
Symphony President
White Realty and Management Co.
908 8th Street
76301 Tel. 723 -1660 fax
Lin Purtle, Project Director
Arts Council
2423 Brentwood Drive
76308 Tel. 696 -5262
Mayor Kay Yeager
2111 Avondale
76308 Tel.767 -0683
John Hirschi
Arts Council Board
3305 Buchannan
76308 tel 691 -6001 691 -4842
Dave Clark, Director
City Planning 515
P.O.Box 1431
76307 Tel 761 -7451 fax 761 -7461
Leo Lerma
Lerma Concrete Construction
4324 View Park
76305 761 - 0466,322 -1321
Remaining members of Development Group
Gail Key,Arts Council Past President
lst Violin Symphony, Director of Youth Orchestra, Chamber
Orchestra
1801 Woodrow
76301 Tel. 322 --0753 fax761 -5367
Julie Hanes
Arts Council President
4501 Wynnwood
76308 Tel. 692 -7086 fax 723 -0737
Dr. Connie Welsh
SFISD Superintendent
1104 Broad St.
76301 Tel. 720 -3303 fax 720 -3228
11 i
i
Arthur Bea Williams, City Council
1602 Andrews Dr.
76301 766 -0874
Dr. Ron Fischli
Head MSU Fine Arts Dept.
Fain Fine Arts Center B 128
3410 Taft
76308 397 -4243
Lynn Dickerson
Publisher
Times Record News
P.O. Box 120
76307 Tel 720 -3491 fax 720 -3414
Joe Johnson
Key Realty
2608 A Kemp
76309 767.6677
Joyce Lo
Musician
3215 Glenwood
76308 322 -1030
Elizabeth Yeager Edwards
Arts Patron
3102 Speedway
76308 766 -4762
Ken Van Loh
President Trails & Tales
Owens Brumley Insurance
1408 Eighth
76301 766 -4321
Gary Patrick
President Wichita Heritage Society
3100 Hamilton Blvd.
76308 766 - 0126,766 -0123
Alice West
Arts Patron
2108 Ellingham
76308- 767 -6581
John Barfield
WF Museum President
Freemon Shapard & Story, Accts
500 City National Bldg.
76303 322 -4436 fax 761 -3365
Ron Mertins
Chairman of Board of Commerce and Industry
218 Hamilton Bldg.
76301 723 -2741 fax 723 -8773
Kerry Roach
Attorney
807 8th
76301 Tel 322 -7856 fax 322 -1204
Polly Cox
Artist, Art Association
2609 Amherst
76308 692 -2324
Otis Akins, RN
State Hospital
1313 Harding
76301 723 -9635
Miriam Mas
Region IX Education Service Center
301 Loop 11
76305 322 - 6928,767 -7000H fax767 -3836
2105 Wenonah 09
Steve Grey
Artist, Stellar Art Gallery
1815 Huff
76301 767 -5840, 723 -4303
Judy Aldaco
Greater Wichita Falls Alliance for Performing Arts
Washington Jackson Elementary
1300 Harding 76303
691 -5868
Dr. Brian Hull
physician /arts patron
4031 Medical Dr.
76308 696 -7200 692 -0824
Mary Ferguson
Junior League, Wichita Falls
2017 Hiawatha
76309 696 -5201
Jean Hall
Backdoor Theatre
1909 Lucille Ave.
76301 767 -1920