Res 037-2014 3/18/2014 RESOLUTION NO. 37-2014
Resolution awarding bid for the 2014 Street Rehabilitation Project
(CWF14-100-05) to Bobby Bounds Excavation, Inc., in an estimated
total amount of $3,302,478.00
WHEREAS, the City of Wichita Falls has advertised for bids for the 2014 Street
Rehabilitation Project (CWF14-100-05); and
WHEREAS, the City Council finds that the lowest responsible bidder is Bobby
Bounds Excavation, Inc., which made a unit price bid in an estimated total amount of
$3,302,478.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
The unit price bid for the 2014 Street Rehabilitation Project (CWF14-100-05) is
awarded to Bobby Bounds Excavation, Inc., in an estimated total amount of
$3,302,478.00, and the City Manager is authorized to execute a contract for the City
with said Contractor for the construction of such project.
PASSED AND APPROVED this the 18t" day of March, 2014.
MAYOR
ATTEST:
City Clerk
2014 Street Rehabilitation Project, l=WF14-.100.05 BID TAB I' ngir"r Bobby Bwma Zack Burkett Cio.
ESTIMATED QUA WIT IE.S Esjrrate Fxcava-ion. Inc.
d
�crlptl®n Vni4 TotPay als PrIce cost P6 co51
.SITE PREP& M 31uZATIQN HOT TO EXCEED 5%] L5 _ S157,260.00 $157,2f�I:flO $1001000.00 $100. 00
TYP€[ Fdfv1AC 7C~N '7,7w;;F. $1J 5,12 �..00 $0,55 SUIE19�,�64�4.5'CONCRETE DRIVE APPFJDAEH SY 41 $8^.00 51.2 .00 $160.00 $6 .00
REMQVE 4 REPLACE GJR9 AND 77EIR LF 1,184 $5 7.00 S 5`3, °f 55�.4OI 4,2DOM
REMOVE &REPLACE VALLP:YG�ITTER SY 473 S30.CG $Tz,570,r $1S�0.00 $70r9W.00
P€a€5TRIAN RAMP EA 28 S�l50.15) 544,140.00 �3,775.00 $67,51S0.Ob°SASE R EPAIR SY 16,477 $73.00 $1X21821.00
4Q2-PP !tEMOVE FRE5SURE PAD Fa, 2 S31000.00 �61000-00 $7,,7r7�7.04 �3,540.01)
A0±3-M M I L L I N G SY 100,r�g S2M 53�70,076 00 $2.70 5270,102 W
541.1 A13JZYMANHOLE EA10 5OO= ;5,O+�0= 1,475.00 $14,750.00
90Z.6 ADJjST"u A-ERVALVE I �. 1C° $400M $4,IJW.G0 559+0.t10
80..1 _AArt C CNITF.0- L5 1 $2E.[?(IQ 521=.Do $ i,om.w $2u0w,00
Base Did Total $2,C41,95T 2. D.42T,0() $2.9 ,I .00
$02-5P-413 5UPEFLP.8% F TON 2,7C4 -� $236,250ZO $65,90 57.31,930.00
303®11641) REMOVE ANO REPLACE$11 CONCRETE PAVEMENT SY 144 $110.00 $15, M $173.50 $243V-40
305_L�4B REMOVE&REPLACE CURB&GUTTER _F 70 $W-00 4,200-CO $50. 0� 53,50fl.00
305.2-4B REMOVE E&REPLACE VALLEY GUTTER SY 92 5100.00 $$ 100,c $130.00 $13,800.00
402-45 13ASE REPAIR SY 1.987 $7�00 $1AS.051.C4 $79. $154,966.00
$03-M46 MILLING 5Y' 2AA0$ 2.00 S46,R1D,00 $ .7':1 5551893-5O
5117.1-411 AMUST NtM HOLE €A 3 $E000
$1,500.M 51A75.00 $41,425:00
502€-0 AD:UST WATER Vlklk IE FA . 3 $1,2 .012 $590� $1,37'Q:00
- 4B Fund Bid Total $M.980 00 $4 2 051,-DD $ 01.288_50
Total Base Bid plus 48 Bid $3,106,1 a7,00 $3,302.478.043 $3,495,091.50
2014 Street
Rehabilitation Project - Hooper st
I
i
° T F
VOy
'o�raF��� 5t31 Street
lllllam5A�u
�c.crf r� Gth Meet
Riverside Cemetery y TUlsa SL
#tth Street r+Gin fit
Lp
Bell st "�'k cc�rrTav
LAveH ,J �
%
I Beefeater, Newcomb and Gladney S_ Rosewood Ave
66
PiedrrrontAve ,T4 LIS2:97 W
Johnson Rd Arrmry Rd
GiaL L FIELD RD rn M MVEST p+M 5-
Q
,S.OI M4 K+E,ST PlCluy r+
a
CypfessAve Faimay Ave Norman
r{ Lake Park Dr
Lake - • [
" !- 6s