Loading...
Res 121-2013 11/5/2013 RESOLUTION NO. 121-2013 Resolution Awarding Bid For The 2014 Budget Utility Improvement Project (CWF14-550-03) To Bowles Construction Co. In An Amount Of $723,173.80 WHEREAS, the City of Wichita Falls has advertised for bids for the 2014 Budget Utility Improvement Project (CWF14-550-03); and WHEREAS, it is found that the lowest responsible bidder is Bowles Construction Co., with a unit price bid in an estimated total amount of $723,173.80. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the 2014 Budget Utility Improvement Project (CWF14-550- 03) is awarded to Bowles Construction Co., in an estimated total amount of $723,173.80, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 5th day of November, 2013. MAYOR ATTEST: City diA 14 Bukget Utility Improvements Projea TF t 4- -SO-03 f s . -y AW '4I _ kiREC T a!� -ARK �+ �r cE,4TF-L s 2014 BUGET UTILITY IMPROVEMENT PROJECT CW F14-550-03 BID DATE:OCTOBER 22,2013 ORDER OF BIDS LOWESTTO HIGHEST Bowles Construction Co.- A&M Construction and Utilities,Inc.- BASE BID-Rivercrest Dr./Emerson Dr./Lamar St.-Waterline Re lacem Ent Wichita Falls,TX Rowlett,TX Pay Project Rem Description Unit Totals Unit Price Total Unit Price Total 107-TS TRENCH SAFETY SYSTEM LF 6,508 $ DAD $ 65C.80 $ 1.00 $ 6,508.00 3.DM SITE PREPARATION&MOBILIZATION(NOTTO EXCEED 5%) LS 1 $ 20,00D.OD $ 2D,000.00 $ 35,000.00 $ 35,000.00 402-R PAVEMENT REPAIR SY 3424 $ D.25 $ 856.00 $ 74.00 $ 253,376.OD 402-CG REMOVE&REINSTALLCURB&GUTTER LF 20D $ 30.00 $ 6,0D0.D0 $ 40.00 $ 8,000.00 501.15-1.5 INSTALL 1-112"WATERLINE AND FITTINGS LF 20 $ 25.01) $ SDO.DO $ 150.00 $ 3,000.OD 501.15-2 INSTALL 2"WATERLINE AND FITTINGS LF 446 $ 27.OD $ 12,042.DC $ 35.00 $ 15,61D.OD 501.15-4 INSTALL4"WATERLINE AND FITTINGS LF 10 $ 45.00 $ 45C.00 $ 10O.00 $ 1,000.00 501.15-6 INSTALL 6"WATERLINE AND FITTINGS LF 684 $ 79.00 $ 54,036.DC $ 40.00 $ 27,360.00 501.15-8 INSTALL 8"WATERLINE AND FITTINGS LF 4,937 $ 87.00 $ 429,519.DC $ 43.00 $ 212,291.00 501.15-12 INSTALL 12"WATERLINE AND FITTINGS LF 401 $ 11D.0D $ 44,11C.00 $ 60.00 $ 24,06D.00 501.15-14 INSTALL 14"WATERLINE AND FITTINGS LF 10 $ 14D.00 $ 1,400.00 $ 500.00 $ 5,000.00 502.3-1 INSTALL 5 1/4"FIRE HYDRANT EA 10 $ 3,400.00 $ 34,000.D0 $ 3,700.00 $ 37,000.00 502.3-RS REMOVE&SALVAGE 5 3.14"FIRE HYDRAT EA 6 $ 50D.00 $ 3,0D0.00 $ 100.00 $ 500.00 502.5-Sx8 INSTALL 8"x8"TAPPING SLEEVE EA 1 $ 1,200.00 $ 1,200.00 $ 4,D00.00 $ 4,000.00 502.5-DC-1.5 INSTALL 1-112"DRESSER COUPLING EA 1 $ 200.00 $ 200.DO $ 300.00 $ 300.00 502.5-DC-8 INSTALL 8"DRESSER COUPLING EA 4 $ 500.00 $ 2,000.DO $ 600.00 $ 2,400.00 502.5-DC-14 INSTALL 14"DRESSER COUPLING EA 1 $ 1,000.00 $ 1,000.DO $ 2,W0.00 $ 2,000.00 502.6-1.5 INSTALL 1-112"GATE VALVE WITH BOX EA 1 $ 400.00 $ 400.DC $ 600.00 $ 600.00 502.6-2 INSTALL 2"GATE VALVE WITH BOX EA 2 $ 400.00 $ 8D0.00 $ 600.00 $ 1,200.00 502.6-6 IINSTALL 6"GATE VALVE WITH BOX EA 5 $ 800.00 $ 4,000.00 $ 1,000.00 $ 5,000.00 502.6-8 INSTALL 8"GATE VALVE WITH BOX EA 10 $ 1,100.0o $ 11,o00.00 $ 1,300.00 $ 13,000.00 502.6-12 INSTALL 12"GATE VALVE WITH BOX EA 2 $ 2,000.00 $ 4,0D0.00 $ 2,500.00 $ 5,000.00 502.6-RS-6 REMOVE&SALVAGE 6"GATE VALVE EA 1 $ 500.00 $ 5o0.O0 $ 100.00 $ 106.00 502.6-RS REMOVE&SALVAGETAPPING SLEEVE&GATE VALVE EA 1 $ 500.00 $ 500.D0 $ 500.00 $ 500.00 502.10-9 INSTALL 3/4"LONG SERVICES EA 29 $ 1,000.0D $ 29,000m $ 800.00 $ 23,200.00 502.11TT INSTALL 3/4"SHORT SERVICES EA 24 $ 55D.00 $ 13,2D0.00 $ 604.00 $ 14.400.00 502.1D-9-1 INSTALL 1"LONG SERVICES EA 11 $ 1,200.00 $ 13,200.00 $ 1,200.00 $ 13,200.00 502.1D-T-1 I INSTALL I"SHORT SERVICES EA 7 $ 63D.00 $ 4,410.00 $ 1,OW.00 $ 7,000.00 502.1D-B-1.5 INSTALL 1-1/2"LONG SERVICES EA 1 $ 3,000.00 $ 3,000.00 $ 3,000.00 $ 3,000.00 502.10-T-2 INSTALL 2"SHORT SERVICES EA 2 $ 2,400.00 $ 4,800.D0 $ 2,500.90 $ 5,000.00 502.1D-9-3 INSTALL 3"LONG SERVICES EA 1 $ 1,70D.00 $ 1,7DC.DC $ 5,000.00 $ 5,000.00 502.1D-T-4 INSTALL4"SHORT SERVICES EA 2 $ 1,700AD $ 3,400.00 $ 6,500.00 $ 13,00D.0D 506.8-2 CUT AND PLUG EXIST 2"WATER MAIN EA 3 $ 300.00 $ 9DO.00 $ 400.00 $ 1,200.00 506.8-4 CUT AND PLUG DUST 4"WATER MAIN EA 2 $ 400.00 $ 800.D0 $ 500.00 $ 1,000.00 506.8-6 CUT AND PLUG EXIST 6"WATER MAIN EA 9 $ 500.00 $ 4,500.D0 $ 700.00 $ 6,300.00 506.8-14 CUT AND PLUG EXIST 14"WATER MAIN EA 3 $ 700.00 $ 2,1DO.DO $ spoo O $ 15,000.00 801 ITEMPORARY BARRICADING AND TRAFFIC CONTROL I L3 1 $ 10,000.00 $ 10,0DO.00 $ 1o,600.00 $ 10,000.00 Total Base Bid $ 723,173.80 Total Base Bid $ 780,205.00 Incorrect Total as written In byA&M on Sheet D-7.