Res 093-2026 approve Change Order No. 4 for the Quail Creek Drainage Improvements Project, 09/01/2026 Resolution No. 93-2026 Resolution authorizing the City Manager to approve Change Order No. 4 for the Quail Creek Drainage Improvements Project, contracted to Scales Concrete Construction Co., Inc., a deduct in the amount of ($203,286.95) WHEREAS, one of the City of Wichita Falls' Strategic Goals is to Provide Quality Infrastructure; and, WHEREAS, the City entered into a unit price contract with Scales Concrete Construction Co., Inc. for the Quail Creek Drainage Improvements Project; and, WHEREAS, the City desires to formally adjust the contract price to be commensurate with the completed and final in-place quantities. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: City Manager is authorized to execute all documents necessary, in a form as approved by the City Attorney, to execute deductive Change Order No. 4 for the Quail Creek Drainage Improvements Project in the amount of ($203,286.95). PASSED AND APPROVED this the 1st day of September, 2026. MAYOR ATTEST: , B City Clerk CITY OF WICHITA FALLS, TEXAS CHANGE ORDER NO.: 4 & Final CONTRACT CHANGE ORDER FORM DATE: 8/19/2026 AMOUNT OF CHANGE: $203,286.95 PROJECT/CONTRACT: Quail Creek Drainage Improvements CWF-20-552-01 (PO#- 22303746) TO: Scales Concrete Construction Co., Inc. ,this Change Order,after approval by the Owner,will be your (Contractor) authority to make the following changes in the work under your contract: Decrease Increase Total Change Description of Changes in Contract in Contract in Contract See Attached-Final Quantity/Cost Adjustments to amounts actually completed. $ 203,286.95 i$203,286.95) $ TOTAL $ 203,286695 $ - $ (203,286.95) AMOUNT OF ORIGINAL CONTRACT: ( - 6,971,470.00 TOTAL AMOUNT OF THIS CHANGE ORDER: $ (203,286.95) TOTAL AMOUNT OF PREVIOUS CHANGE ORDERS: W—78,350.00 CONTRACT AMOUNT TO DATE: $ 6,846,533.05 Approved By Owner: Accepted By Contractor: Recommended By Arch/Eng: City of Wichita Falls Scales Concrete Construction Co., Inc. Biggs & Mathews, Inc. By: By: By:__ Title: City Manager Title: President Title: President Date: Date: Date: 2019-027 CITY OF WICHITA FALLS QUAIL CREEK DRAINAGE IMPROVEMENTS (CWF 20-552-01) CHANGE ORDER NO. 4-FINAL QUANTITY ADJUSTMENTS BID ITEM NO. & DESCRIPTION ADD TO CONTRACT AMOUNT Base Bid: 15. Geotextile Filter Fabric 5733.20 SY @ $2.25 = $12,899.70 19. Type B Filter Material 32.75 CY @ $75.00 = $2,456.25 33. Erosion Control Blanket 585.8 SY @$3.25 = $1.903.85 34 Hydromulch Seeding Etc. 585.8 SY @$3.75 = $2,196.75 38. Pedestrian Railing 35 LF @ $350.00 = $12,250.00 Alternate A-North Quail Creek: 8-A Concrete Pavement(8" Thickness) 2.7 SY @$155.00 = $418.50 9-A Concrete Pavement(6" Thickness) 580.40 SY@$130.00 = $75,452 10-A Concrete Pavement(4" Thickness) 1.60 SY@$110.00 = $176.00 20-A Lateral Storm Drain (6"-2"Diameter) 1.0 EA.@$400.00 = $400.00 Alternate B Gladney Channel: 10-B Concrete Pavement(4" Thickness) 9.3 SY@$110.00 = $1023.00 15-B Weep Holes 1 EA. $375.00 = $375.00 18-B Lateral Storm Drain (6"-2"Diameter) 2 EA. @ $400.00 = $800.00 23-B Rock Filter Dam 4 LF @$55.00 = $220.00 TOTAL ADD TO CONT " • CT: $ 110,571.05 BID ITEM NO. & DESCRIPTION DEDUCT FROM CONTRACT AMOUNT Base Bid: 4. Asphalt Street Repair 48.95 SY @ $70.00 = $3,426.50 9. Concrete Pavement(8" Thickness) 414.20 SY@$148.00 = $61,301.60 10. Concrete Pavement(6" Thickness) 129.7 SY @ $130.00 = $16,861.00 11. Concrete Pavement(4" Thickness) 117.7 SY@ $110.00 = $12,947.00 12. Concrete Retaining Wall 945.60 SF @$69.00 = $65,246.40 13. Concrete Block Retaining Wall 109 SF @$45.75 = $4,986.75 16. Underdrain Pipe(6') 390 LF @$17.00 = $6,630.00 17. Weep Holes 69 EA. @$375.00 = $25,875.00 26. Lateral Storm Drain (6"-2') 2 EA. @ $500.00 = $1,000.00 31. Rock Rip Rap (24" Thick) 100 CY @$130.00 = $13,000.00 35. Rock Filter Dam 100 LF @$50.00 = $5,000.00 37. Removable Bollard 2 EA. @ $1,500 = $3,000.00 2019-027 BID ITEM NO. & DESCRIPTION DEDUCT FROM CONTRACT AMOUNT Alternate A—North Quail Creek: 4-A Asphalt Street Repair 40 SY @ $60.00 = $2,400.00 11-A Concrete Retaining Wall 224.4 SF @$69.00 = $15,483.60 13-A Geotextile Filter Fabric 1,098.10 SY @ $2.25 = $2,470.73 14-A Underdrain Pipe (4') 116 LF @ $17.00 = $1,972.00 15-A Weep Holes 11 EA.@ $375.00 = $4,125.00 22-A Erosion Control Blanket 317 SY @ $3.25 = $1,030.25 23-A Hydromulch, Seeding, Fertilizing 317 SY @$3.75 = $1,188.75 24-A Rock Filter Dam 8 LF @$55.00 = $440.00 Alternate B—Gladney Channel: 4-B Asphalt Street Repair 4.7 SY @$60.00 = $282.00 8-B Concrete Pavement(8" Thickness) 28.3 SY.@$160.00 = $4,528.00 9-B Concrete Pavement(6" Thickness) 2 SY @$130.00 = $260.00 11-B Concrete Retaining Wall 470.75 SF @ $69.00 = $32,481.75 13-B Geotextile Filter Fabric 88.30 SY @$2.25 = $198.68 14-B Underdrain Pipe (4') 94 LF @ $17.00 = $1,598.00 Change Order No. 3 Adjustment: Concrete Anchor Ballast for 36"Arizona Main 522.5 LF @ $50.00 = $26,125.00 TOTAL DEDUCT FROM CONTRACT: $313,858.00 CHANGE ORDER NO. 4(CONTRACT DEDUCT) $203,286.95 2019-027