Res 082-2026 2025 Water Budgeted Utility Improvement Project Phase 2 08/18/2026 Resolution No. 82-2026 Resolution authorizing the City Manager to approve Change Order No. 2 for the 2025 Water Budgeted Utility Improvement Project Phase 2, to Insituform Technologies, LLC, a deduct in the amount of($117,509.00) WHEREAS, one of the City of Wichita Falls' Strategic Goals is to Provide Quality Infrastructure; and, WHEREAS, the City entered into a unit price contract with Insituform Technologies, LLC for the 2025 Water Budgeted Utility Improvement Project Phase 2; and, WHEREAS, the City desires to formally adjust the contract price to be commensurate with the completed final in-place quantities. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: City Manager is authorized to execute all documents necessary, in a form as approved by the City Attorney, to execute deductive Change Order No. 2 for the 2025 Water Budgeted Utility Improvement Project Phase 2 in the amount of ($117,509.00). PASSED AND APPROVED this the 18th day of August, 2026. MAYOR ATTEST: City Clerk CITY OF WICHITA FALLS, TEXAS CHANGE ORDER NO.: 2 CONTRACT CHANGE ORDER FORM DATE: 8/5/2026 AMOUNT OF CHANGE: $ (117,509.00) PROJECT/CONTRACT: 2025 Water Budgeted Utility Improvement Project Phase 2, CWF25-565-12 TO: Insituform Technologies,LLC,(Contractor)this Change Order,after approval by the Owner,will be your authority to make the following changes in the work under your contract: Decrease Increase Total Change Description of Changes in Contract in Contract in Contract This change order will modify the plan quantities to final in-place quantities. Item 4:4"-12"Pipeburst Setup Charge Per Install Length $ 1,200.00 $ - $ (1,200.00) Decreased 60 LF at$20.00 per LF for a final total of 2515 LF Item 5:Copperhead Tracer Wire System for Mainline Only $ 450.00 $ - $ (450.00) Decreased 60 LF at$7.50 per LF for a final total of 2515 LF Item 6:No Equipment access-Disassemble,carry,reassemble Burst Equip by hand $ 9,600.00 $ - $ (9,600.00) Decreased 8 EA at$1,200.00 per EA for a final total of 3 EA Item 7:Access Pit for Pipe Bursting Installation(0'-8'deep) $ - $ 4,500.00 $ 4,500.00 Increased 1 EA at$4,500.00 per EA for a final total of 15 EA Item 11:6"Gate Valve and Box $ - $ 2,900.00 $ 2,900.00 Increased 1 EA at$2,900.00 per EA for a final total of 9 EA Item 13:6"22 or 45 Degree Bend $ - $ 5,100.00 $ 5,100.00 Increased 3 EA at$1,700.00 per EA for a final total of 6 EA Item 15:Install 6"Tee $ - $ 4,200.00 $ 4,200.00 Increased 1 EA at$4,200.00 per EA for a final total of 4 EA Item 18:1.5"Water Service with Meter Box $ - $ 4,100.00 $ 4,100.00 Increased 1 EA at$4,100.00 per EA for a final total of 4 EA Item 23:Ductile Iron Fittings $ 533.00 $ - $ (533.00) Decreased 41 LB at$13.00 per LB for a final total of 2074 LB Item 24:Granular Backfill $ 1,080.00 $ - $ (1,080.00) Decreased 12 TON at$90.00 per TON for a final total of 88 TON Item 25:Locate&Protect Underground Plumbing for Pool Equip in or near Easement $ 4,200.00 $ - $ (4,200.00) Decreased 3 EA at$1,400.00 per EA for a final total of 3 EA Item 26:Move or Relocate Rain Water Collection Tank $ 6,900.00 $ - $ (6,900.00) Decreased 3 EA at$2,300.00 per EA for a final total of 1 EA Item 27:Move or Relocate Portable Shed from Easement $ 13,500.00 $ - $ (13,500.00) Decreased 5 EA at$2,700.00 per EA for a final total of 0 EA Item 29:Brace&Hold Power Line Pole in Place for Excavation Safety $ 14,400.00 $ - $ (14,400.00) Decreased 3 EA at$4,800.00 per EA for a final total of 0 EA Item 33:Repair/Rehab 2"Asphalt pavement-Type D $ 775.00 $ - $ (775.00) Decreased 5 SY at$155.00 per SY for a final total of 0 SY Item 34:Repair/Rehab 6"Asphalt pavement-Type B Binder with Tack Coat $ 975.00 $ - $ (975.00) Decreased 5 SY at$195.00 per SY for a final total of 0 SY Item 35:Repair/Rehab 8"Flex base $ 400.00 $ - $ (400.00) Decreased 5 SY at$80.00 per SY for a final total of 0 SY Page 1 of 2 Item 36:Repair/Rehab 6"Concrete Paving $ - $ 1,820.00 $ 1,820.00 Increased 52 SF at$35.00 per SF for a final total of 142 SF Item 37:Remove&Put Back Landscaping Pavers $ 3,380.00 $ - $ (3,380.00) Decreased 169 SF at$20.00 per SF for a final total of 16 SF Item 38:Repair/Rehab 4"Concrete sidewalk $ 928.00 $ - $ (928.00) Decreased 32 SF at$29.00 per SF for a final total of 96 SF Item 39:Repair/Rehab 4"Exposed Aggregate sidewalk $ 5,100.00 $ - $ (5,100.00) Decreased 100 SF at$51.00 per SF for a final total of 0 SF Item 40:Repair/Rehab Concrete curb and gutter $ 600.00 $ - $ (600.00) Decreased 8 LF at$75.00 per LF for a final total of 16 LF Item 41:Sod $ - $ 3,150.00 $ 3,150.00 Increased 175 SY at$18.00 per SY for a final total of 850 SY Item 42:Repair/Rehab 8'Tall Decorative wood fence $ 1,608.00 $ - $ (1,608.00) Decreased 24 LF at$67.00 per LF for a final total of 0 LF Item 43:Repair/Rehab 8'or 6'Tall Regular wood fence $ 1,000.00 $ - $ (1,000.00) Decreased 20 LF at$50.00 per LF for a final total of 196 LF Item 44:Temporary Fencing for Pets/After Hours $ 5,040.00 $ - $ (5,040.00) Decreased 168 LF at$30.00 per LF for a final total of 72 LF Item 46:Connection of Each Service from 2"-4"AVWVA Approved Bypass $ - $ 450.00 $ 450.00 Increased 1 EA at$450.00 per EA for a final total of 55 EA Item 48:Traffic control $ 6,400.00 $ - $ (6,400.00) Decreased 32 DAY at$200.00 per DAY for a final total of 68 DAY Item 49:Flagmen $ 2,100.00 $ - $ (2,100.00) Decreased 28 HR at$75.00 per HR for a final total of 32 HR Item 50:Owner Contingency Allowance $ 50,000.00 $ - $ (50,000.00) Decreased 1 Allowance at$50,000.00 per Allowance for a final total of 0 Allowance Item 54:Burst Existing 8"to 8"FPVC DR18 C-900(0'-8'deep) $ 13,560.00 $ - $ (13,560.00) Decreased 60 LF at$226.00 per LF for a final total of 165 LF TOTAL $ 143,729.00 $ 26,220.00 $ (117,509.00) AMOUNT OF ORIGINAL CONTRACT: I $ 1,299,813.00 TOTAL AMOUNT OF THIS CHANGE ORDER: I $ (117,509.00) TOTAL AMOUNT OF PREVIOUS CHANGE ORDERS: I $ 80,134.50 CONTRACT AMOUNT TO DATE: I $ 1,262,438.50 The completion time under your contract will be extended by zero(0)days because of this change order making the revised completion date September 12,2026. Accepted By Contractor: Recommended By Arch/Eng: Approved By Owner: Insituform Technologies, LLC City of Wichita Falls City of Wichita Falls By: By: By: Title: Title: Asst. City Engineer Title: City Manager Date: Date: Date: Page 2 of 2