Loading...
Res 70-2026 Resolution authorizing the City Manager to award bid and contract for the 2026 Asphalt Rehabilitation Project to Freeman Paving, L.L.C. in the amount of $2,485,818.55 Resolution No. 70-2026 Resolution authorizing the City Manager to award bid and contract for the 2026 Asphalt Rehabilitation Project to Freeman Paving, L.L.C. in the amount of$2,485,818.55 WHEREAS, one of the City of Wichita Falls' Strategic Goals is to Provide Quality Infrastructure; and, WHEREAS, the City of Wichita Falls has advertised for bids for the 2026 Asphalt Rehabilitation Project; and, WHEREAS, it is found that the award of base bid plus additive alternate bid items one (1) and two (2) is in the best interest of the City of Wichita Falls WHEREAS, it is found that the lowest responsible bidder is Freeman Paving, L.L.C., who made a unit price bid with an estimated total of$2,485,818.55. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the 2026 Asphalt Rehabilitation Project is awarded to Freeman Paving, L.L.C., in an estimated total amount of $2,485,818.55, and the City Manager is authorized to execute a contract, in a form approved by the City Attorney. PASSED AND APPROVED this the 21st day of July, 2026. MAYOR ATTEST: City Clerk 2026 ASPHALT REHABILITATION PROJECT CWF26-100-06 3 \ e f LJ, IAfiat". IN O �". L i e �� - l wA� / AIRPORT DR 9a u< �� ��TMWEST FRWY Ft- - 1 ��� i ti II U HI �� i a � � j4o 0 _ r icitm w Rot, _ .4, 1,4 C �� C , e I - a ,, :,,,,:-'..,,,,N.-2, vet ,.. -- -, / .a r it TFn�� —LI 1 : ' IL G S _ cc —I LL II �i� DI- _t 1 t F Est 11 I- �y9 ICI y I„Tho I � � tl ii V �_ 1 UU i� Tri �N,�t `' � AB,.?_l \y q a ,--- ---u� ,„iU i t efy Se' 't 11 ��'f -1� I �I .yam H 11_1 .H____)— ii.), q ry L if rin) —'i __L—4,1, I ' I— it ,7X-„,\J —r[ --//- _I—lid Li y'd .,�'�- ":, �' V.� Nam_— �= !I , n ..4, —�IL� II ` „ --) —ni--- a '.i! �, '`,, ICI -, ,, 1 ,-n,,-,—,11"E 3133 q ,i b� \,.a g 1 I III I� 1 c �a�p e -_ter ' j k M�L�! N I� — --of q A�J i ` THWEST P C IY 1 '— 4 - IL p_ 3 ,4 _tip V �� A% LEGEND LAKE NnCHITA � �� yc� H ASPHALT REHAB �V NO1 1 O S'ALL 2026 ASPHALT REHABILITATION PROJECT CWF26-100-06 e �� MAURINE ST- a0 i 2. Illk y ''S'1/4 d ---- SAXET S'I. BORTON ST. II NORMAN ST. SPEARMAN DR. \\1 HOLLANDALE AVE. cALLDEELD RD. I rc HUSKIE DR iio '. Ji $ TONS . °or 7 � OLD'OwaP ARK RD. SA'rdR, RIDGEWAY DR. sr b V 'YO sT n C, Qj9 7 9, w sP q, ' 0 � 0 G 0 �9P h,� 0 \ � 5 Fg Flg ¢'7 �STON pL°N 4 rOO Bow N RHEA RD. (ADD/ALT) MAURINE ST. NOT TO SCALE SHEET 1 OF 1 2026 Asphalt Rehabilitation Project CWF26.100.06 Bid Date:July 9,2026 BASE BID Freeman Paving,LLC Overland Corporation **ORDER OF BIDS FROM LOWEST TO HIGHEST** Vernon,TX Ardmore,OK i Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 200.1 Site Preparation&Mobilization(Not to Exceed 5%) LS 1 $50,000.00 $50,000.00 $89,000.00 $89,000.00 301.5-8 8"Soil Stabilization SY 330 $25.00 $8,250.00 $150.00 $49,500.00 302-D Type D Hot Mix Asphalt TON 1,405 $110.00 $154,550.00 $150.00 $210,750.00 305.1 Remove&Replace Curb&Gutter LF 360 $75.00 $27,000.00 $110.00 $39,600.00 305.2-PR Pedestrian Ramps EA 8 $2,500.00 $20,000.00 $3,500.00 $28,000.00 305.2-SW Remove&Replace 4"Concrete Sidewalk SY 50 $90.00 $4,500.00 $125.00 $6,250.00 305.2-VG Remove&Replace Valley Gutter SY 330 $115.00 $37,950.00 '$180.00 $59,400.00 305.2-6 Remove&Replace 6"Concrete Pavement SY 20 $300.00 $6,000.00 _ $195.00 $3,900.00 402-6 6"Base Repair SY 8,057 $80.00 $644,560.00 $85.00 $684,845.00 402-10 10"Base Repair SY 5,195 $110.00 $571,450.00 $115.00 $597,425.00 403-M Milling SY 12,730 $2.85 $36,280.50 $5.50 $70,015.00 801 Temporary Traffic Control LS 1 $10,000.00 $10,00 0 $37,500.00 $37,500.00 804-24WS 24"White Solid Striping(Stop Bar&Crosswalk)-100 mil thick LF 155 $10.00 $ $8.50 $1,317.50 Total Base Bid $1, 090.5 Total Base Bid $1,877,502.50 ADDITIVE/ALTERNATE NO.1 Freeman Paving,LLC III' Overland Corporation -rnon,TX Ardmore,OK Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 302-D-ALT 1 Type D Hot Mix Asphalt TON 1,155 $110.00 $127,050.00 $150.00 $173,250.00 403-M-ALT 1 Milling SY 10,490 $2.85 $29,896.50 $5.50 $57,695.00 804-4WD-ALT 1 4"White Dash Striping-100 mil thick LF 900 $2.25 $2,025.00 $1.45 $1,305.00 804-4WS-ALT 1 4"White Solid Striping-100 mil thick LF 80 $3.50 $280.00 $1.46 $116.80 804-4YS-ALT 1 4"Yellow Solid Striping-100 mil thick LF 3,770 $2.50 $9,425.00 $1.35 $5,089.50 804-24WS-ALT 1 24"White Solid Striping(Stop Bar)-100 mil thick LF 25 $10.00 $250.00 $8.50 $212.50 804-LA-ALT 1 Left Turn Only Arrow-Prefab Type C EA 1 1 rt $3trmt''' $300.00 $250.00 $250.00 804-RA-ALT 1 Right Turn Only Arrow-Prefab Type C EA 1 $300.r. $300.00 $250.00 $250.00 Total Add/Alt No.1 $169,526.50 Total Add/Alt No.1 $238,168.80 j• ADDITIVE/ALTERNATE NO.2 Freeman Paving,LLC Overland Corporation LVernon,TX Ardmore,OK Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 200.1-ALT 2 Site Preparation&Mobilization(Not to Exceed 5%) LS 1 $1,000.00 $1,000.00 $32,250.00 $32,250.00 302-D-ALT 2 Type D Hot Mix Asphalt 4 TON 890 $110.00 $97,900.00 $150.00 $133,500.00 305.1-ALT 2 Remove&Replace Curb&Gutter LF 50 $75.00 $3,750.00 $110.00 $5,500.00 305.2-PR-ALT 2 Pedestrian Ramps EA 2 $2,500.00 $5,000.00 $3,500.00 $7,000.00 305.2-SW-ALT 2 Remove&Replace 4"Concrete Sidewalk 10 $250.00 $2,500.00 $125.00 $1,250.00 402-9-ALT 2 9"Base Repair 'lb5,660 $105.00 $594,300.00 $105.00 $594,300.00 403-M-ALT 2 Milling SY 8,083 $2.85 $23,036.55 $5.50 $44,456.50 801-ALT 2 Temporary Traffic Control LS 1 $10,000.00 $10,000.00 $41,000.00 $41,000.00 804-4WD-ALT 2 4"White Dash Striping-100 mil thick LF 300 $2.25 $675.00 $1.45 $435.00 804-4YS-ALT 2 4"Yellow Solid Striping-100 All thick LF 1,500 $2.50 $3,750.00 $1.35 $2,025.00 804-24WS-ALT 2 24"White Solid Striping(Stop Bar)-100 mil thick LF 124 $10.00 $1,240.00 $8.50 $1,054.00 804-LSA-ALT 2 Left Turn&Straight Arrow-Prefab Type C EA 1 $300.00 $300.00 $250.00 $250.00 804-MA-ALT 2 Merge Arrow-Prefab Type C EA 1 $450.00 $450.00 $400.00 $400.00 804-RSA-ALT 2 Right Turn&Straight Arrow-Prefab Type C EA 1 $300.00 $300.00 $310.00 $310.00 Total Add/Alt No.2 $744,201.55 Total Add/Alt No.2 $863,730.50 ADDITIVE/ALTERNATE NO.3 Freeman Paving,LLC Overland Corporation Vernon,TX Ardmore,OK Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 200.1-ALT 3 Site Preparation&Mobilization(Not to Exceed 5%) LS 1 $1,000.00 $1,000.00 $30,000.00 $30,000.00 302-D-ALT 3 Type D Hot Mix Asphat TON 635 $110.00 $69,850.00 $150.00 $95,250.00 305.1-ALT 3 Ihrove&Replace &Gutter LF 50 $75.00 $3,750.00 $110.00 $5,500.00 305.2-PR-ALT 3 d rian Ramps EA 2 $2,500.00 $5,000.00 $3,500.00 $7,000.00 305.2-SW-ALT 3 Rem Replace 4"Concrete Sidewalk SY 10 $250.00 $2,500.00 $125.00 $1,250.00 402-9-ALT 3 9"Base Repair SY 4,040 $105.00 $424,200.00 $105.00 $424,200.00 4 O -ALT 3 Milling n SY 5,767 $2.85 $16,435.95 $5.50 $31,718.50 801-ALT 3 Tempom Tragic Control LS 1 $10,000.00 $10,000.00 $47,000.00 $47,000.00 Total Add/Alt No.3 $532,735.95 Total Add/Alt No.3 $641,918.50 AWARD TOTAL TOTAL (Base Bid+Add/Alt $2,274,352.95 (Base Bid+Add/Alt $2,757,589.80 Nos.1&3) Nos.1&3)