Loading...
Res 47-2026 Change Order No. 2 for the 2025 Sewer Budget Utility Improvement Project Phase 1 05/19/2026 Resolution No. 47-2026 Resolution authorizing the City Manager to approve Change Order No. 2 for the 2025 Sewer Budget Utility Improvement Project Phase 1, to Insituform Technologies, LLC, a deduct in the amount of($125,805.60) WHEREAS, one of the City of Wichita Falls' Strategic Goals is to Provide Quality Infrastructure; and, WHEREAS, the City entered into a unit price contract with Insituform Technologies, LLC for the 2025 Sewer Budget Utility Improvement Project Phase 1 ; and, WHEREAS, the City desires to formally adjust the contract price to be commensurate with the completed final in-place quantities. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: City Manager is authorized to execute all documents necessary, in a form as approved by the City Attorney, to execute deductive Change Order No. 2 for the 2025 Sewer Budget Utility Improvement Project Phase 1 in the amount of ($125,805.60). PASSED AND APPROVED this the 19th day of May, 2026. MAYOR ATTEST: De uty City Clerk CITY OF WICHITA FALLS, TEXAS CHANGE ORDER NO.: 2 CONTRACT CHANGE ORDER FORM DATE: 4/27/2026 AMOUNT OF CHANGE: $ (125,805.60) PROJECT/CONTRACT: I 2025 Sewer Budget Utility Improvement Project Phase 1, CWF25-565-10 TO: Insituform Technologies,LLC,this Change Order,after approval by the Owner,will be your (Contractor) authority to make the following changes in the work under your contract: Decrease Increase Total Change Description of Changes in Contract in Contract in Contract This change order will modify the plan quantities to final in-place quantities.This change order also includes a point repair that was necessary to expose and repair a sanitary sewer main that runs through the MSU utility tunnel. Item 10:External reconnect (0'-8'deep) $ - $ 2,000.00 $ 2,000.00 Increased 1 EA at$2,000.00 per EA for a final total of 12 EA Item 15:Install New 4'DIA manhole 0'-6'deep $ 10,000.00 $ - $ (10,000.00) Decreased 1 EA at$10,000.00 per EA for a final total of 3 EA Item 16:Extra depth 4'DIA manhole over 6'deep $ 1,800.00 $ - $ (1,800.00) Decreased 3 VF at$600.00 per VF for a final total of 3 VF Item 18:New Manhole Frame and Cover $ 1,500.00 $ - $ (1,500.00) Decreased 1 EA at$1,500.00 per EA for a final total of 3 EA Item 19:Install End-of-Line Cleanout $ 4,000.00 $ - $ (4,000.00) Decreased 1 EA at$4,000.00 per EA for a final total of 2 EA Item 26:Extra hand excavation $ 500.00 $ - $ (500.00) Decreased 5 CY at$100.00 per CY for a final total of 28 CY Item 27:Repair/Rehab 2"Asphalt pavement $ - $ 155.00 $ 155.00 Increased 1 SY at$155.00 per SY for a final total of 20 SY Item 28:Repair/Rehab 8"Flex base $ - $ 80.00 $ 80.00 Increased 1 SY at$80.00 per SY for a final total of 20 SY Item 29:Sod $ 4,950.00 $ - $ (4,950.00) Decreased 275 SY at$18.00 per SY for a final total of 0 SY Item 30:Repair/Rehab chain link fence with new $ 880.00 $ - $ (880.00) Decreased 16 LF at$55.00 per LF for a final total of 32 LF Item 31:Repair/Rehab wooden fence with new $ 2,160.00 $ - $ (2,160.00) Decreased 36 LF at$60.00 per LF for a final total of 0 LF Item 32:Traffic Control-Residential $ - $ 1,000.00 $ 1,000.00 Increased 4 Days at$250.00 per Day for a final total of 19 Days Item 35:Chipping to widen opening in bottom of MH $ 1,450.00 $ - $ (1,450.00) Decreased 1 EA at$1,450.00 per EA for a final total of 5 EA Item 36:Manhole Spray Rehab-Warren 301-14 Epoxy 250 mils $ 17,471.60 $ - $ (17,471.60) Decreased 251.39 SF at$69.50 per SF for a final total of 8,884.61 SF Item 38:Setup for MH grouting or void filling $ 13,600.00 $ - $ (13,600.00) Decreased 17 EA at$800.00 per EA for a final total of 0 EA Item 39:Injection grouting in MH $ 14,000.00 $ - $ (14,000.00) Decreased 40 GAL at$350.00 per GAL for a final total of 0 GAL Page 1 of 2 Item 42:Owner Contingency Allowance $ 50,000.00 $ - $ (50,000.00) Decreased 1 Allowance at$50,000.00 per Allowance for a final total of 0 Allowance Item 45:8"Clean and TV $ 14.00 $ - $ (14.00) Decreased 2 LF at$7.00 per LF for a final total of 473 LF Item 46:Tuberculation Removal $ 3,840.00 $ - $ (3,840.00) Decreased 96 LF at$40.00 per LF for a final total of 4 LF Item 49:8"x 6.0mm $ 3,375.00 $ - $ (3,375.00) Decreased 75 LF at$45.00 per LF for a final total of 400 LF Item 50:6"-12"CIPP Setup Charge Per Install Length $ 1,500.00 $ - $ (1,500.00) Decreased 75 LF at$20.00 per LF for a final total of 400 LF Item 51:Internal Reconnects $ - $ 700.00 $ 700.00 Increased 2 EA at$350.00 per EA for a final total of 4 EA Item 53:6"-18"Post TV Inspection After Rehabilitation $ 300.00 $ - $ (300.00) Decreased 75 LF at$4.00 per LF for a final total of 400 LF Item 54:Traffic Control-Lane Closure $ 3,750.00 $ - $ (3,750.00) Decreased 3 Days at$1,250.00 per Day for a final total of 0 Days Item 55:Lighted Arrow Board(Per Arrow Board) $ 600.00 $ - $ (600.00) Decreased 3 Days at$200.00 per Day for a final total of 0 Days Item 57:8"-12"Point Repair(0'-8'deep)With Temp Surface at ADA Ramp and Sidewalk $ - $ 5,950.00 $ 5,950.00 Increased 1 EA at$5,950.00 per EA for a final total of 1 EA TOTAL $ 135,690.60 $ 9,885.00 $ (125,805.60) AMOUNT OF ORIGINAL CONTRACT: $ 1,144,111.00 TOTAL AMOUNT OF THIS CHANGE ORDER: $ (125,805.60) TOTAL AMOUNT OF PREVIOUS CHANGE ORDERS: $ 74,950.00 CONTRACT AMOUNT TO DATE: $ 1,093,255.40 The completion time under your contract will be extended by zero(0)days because of this change order making the revised completion date March 27,2026. Accepted By Contractor: Recommended By Arch/Eng: Approved By Owner: Insituf Tech . s, C Wichita Falls^ City of Wichita Falls B • CraigOlen By: o�"� By: Ti . Project Manager Title: Asst. City Engineer Title: City Manager Date: 4-28-26 Date: 5-06-26 Date: Page 2 of 2