Loading...
Res 31-2026 support of the forthcoming issuance of certificates of obligation by the City 03/17/2026 Resolution No. 31-2026 Resolution approving the programs and expenditures of the Wichita Falls Type B Sales Tax Corporation (4B) by approving funding to the City of Wichita Falls in support of the forthcoming issuance of certificates of obligation by the City, for a term not to exceed twenty (20) years and an annual amount not to exceed $1,400,000, to assist with several planned capital improvement projects including, but not limited to, renovation of the former Kirby Middle School into the new Police Department Headquarters, The Falls renovation, and the Lake Wichita Section of the Circle Trail. WHEREAS, Texas Local Gov't. Code § 501.073(a) provides "The corporation's authorizing unit will approve all programs and expenditures of a corporation and annually review any financial statements of the corporation;" and, WHEREAS, on March 5, 2026, the Wichita Falls Type B Sales Tax Corporation approved the project listed below and as stated in its agenda. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: 1 . The Wichita Falls Type B Sales Tax Corporation's approval and funding of the following programs and expenditures, in a total amount not to exceed $1,400,000 per fiscal year beginning in fiscal year 2027 for a period not to exceed 20 years as described below and in said corporation's agenda, is approved: funding to the City of Wichita Falls in support of the forthcoming issuance of certificates of obligation, for a term not to exceed twenty (20) years and an annual amount not to exceed $1,400,000, to assist with several of the City's planned capital improvement projects 2. The current fiscal year budget of the Type B Sales Tax Corporation is amended to provide for the aforementioned expenditures and changes thereto. PASSED AND APPROVED this the 17th day of March, 2026. MAYOR ATTEST: Oak.i_<,_ floc City Clerk ATTACHMENT A SCOPE OF SERVICES Owner: City of Wichita Falls, Texas Design Professional: Black& Veatch Corporation Project Title: Plant 61 Filter Rehabilitation Improvements PROJECT DESCRIPTION The goal of the project is to rehabilitate the filters at the 1961 WTP. This scope of services includes Final Design, Bid Services and Construction Phase Services. The Project includes the following major components: • Replace filter surface wash system at the existing 4 filters. • Replace filter media with anthracite and sand without raising existing filter troughs. • Paint/repair pipe gallery filtered water piping. • Replace and upgrade existing two (2)filter control consoles with local controls. • Replace filter effluent and drain valves. 29 valves are estimated to be replaced (13 large valves and 16 small drain valves). • Replace valve actuators for all valves (new and existing) at the filter gallery. • Reinforce existing filter backwash troughs at wall connection points. • Replace light fixtures in the filter gallery as needed. • Repair guiderail in the filter gallery as needed. TASK SERIES 100: PLANT 61 FILTER REHABILITATION IMPROVEMENTS— FINAL DESIGN AND BID SERVICES Task 100: Conduct Project Administration Services. Design Professional will provide project management functions required to successfully complete the task series indicated above, including all project correspondence with the City; consultation with the City's staff; supervision and coordination of services; implementation of a project specific work plan, procedures, and a quality control/quality assurance plan; scheduling and assignment of personnel resources, administration and coordination of subconsultants, continuous monitoring of work progress; and invoicing for the work performed. Based on 8-month design. Task 101: Monthly Project Status Reports. Design Professional will prepare a monthly project status report to identify work that has been performed in the reporting period, the work activities anticipated to be performed the next month, action items required of City for an efficient and effective delivery of the Design Professional's services, potential project scope variances with corrective actions suggested by the Design Professional. Task 102: Conduct Progress Meetings. Design Professional will schedule and facilitate three (3)progress meetings to review and obtain feedback on interim deliverables, review the project schedule, discuss key design issues, review budget status, and discuss deviations from the scope City of Wichita Falls Attachment A 1 of services. Design Professional shall prepare and distribute minutes of each progress meeting and identify action items. Task 103: Contract Documents. Design Professional will produce 60-, 90-, and 100-percent complete contract documents (drawings and specifications) and submit to the City for review. Following each submittal, a progress meeting will be scheduled within 14 working days to receive comments from the City. The drawings will be prepared in 22x34 sheet format in the latest version of AutoCAD utilizing the City's standard drawing border and Design Professional's drawing standards. The technical specifications will include the City standard "front-end" contract documents (North Central Texas Council of Government—NCTCOG) and be developed in Microsoft Word using the Engineer's standard specification guides and format. Documents will be provided to City for review in pdf format. Design Professional will develop an opinion of probable construction cost(OPCC)for each design submittal. All opinions of probable construction costs developed will follow the recommendations of the Association for the Advancement of Cost Engineering (AACE) International Recommended Practice No. 18R with regard to methodology and accuracy. Since Engineer has no control over the cost of labor, material, or equipment furnished by others not under contract to Engineer, Engineer's opinion of probable cost for construction of the work will be made on the basis of experience and qualifications as an Engineer. Engineer does not guarantee or warranty that proposals, bids, or actual project costs will not vary from Engineer's opinions of probable cost. The cost opinion level of accuracy presented by Engineer will be in accordance with accepted industry guidelines and as defined by AACE. Owner will provide all existing site plans and building plans in electronic format to be used for drawing backgrounds • Drawings and specifications for the 60-percent submittal will have the major process designs completed, and the design of ancillary/support processes will be initiated/developed. Drawing plans and secondary P&IDs will be finalized, sections/details will be started, equipment vendor comments will be incorporated, and commodity specifications will be started. • Drawings and specifications for the 90-percent submittal will have all ancillary processes completed. All remaining drawings (including details, project-specific notes, and annotations) and specifications (including Front Ends, sequencing plans, and discipline- specific/ commodity specifications will be completed. The deliverable will be documents which are complete with the exception of the internal quality control review. • Drawings and specifications for the 100-percent submittal will have all internal quality control and City comments incorporated. The deliverable will be final sealed and signed construction documents suitable for bidding. Task 104: Bidding Services. Design Professional will perform the following bidding services: - Prepare Advertisement Information. Design Professional will assist the City in establishing a bid opening date, coordinate reproduction and distribution of the bid documents (using the city's website for distribution) and maintain a list of plan holders. City of Wichita Falls Attachment A 2 Potential bidders will purchase their own sets of project drawings and contract specifications. - Pre-Bid Assistance. Design Professional will schedule and conduct a pre-bid conference, respond to questions from bidders, advise the City of any inquiries prior to the bid opening from contractors/subcontractors/suppliers, and prepare addendum as required to respond to questions and provide clarification. - Bid Opening. Design Professional will attend the bid opening and assist the City in reviewing the bids for completeness and accuracy. - Review Bidder Qualifications. Design Professional will review the bids for completeness and conformance with the bidding requirements, provide a credit history review of the apparent low bidder, review subcontractors, and prepare a bid tabulation and letter with recommendation of award. TASK SERIES 200: PLANT 61 FILTER REHABILITATION IMPROVEMENTS— CONSTRUCTION MANAGEMENT SERVICES Design Professional will perform Construction Services during the construction phase of the project for a 16-month duration. By performing these services, Engineer shall not have authority or responsibility to supervise, direct, or control the Contractor's work or the Contractor's means, methods, techniques, sequences, or procedures of construction. Engineer shall not have authority or responsibility for safety precautions and programs incident to the Contractor's work or for any failure of the Contractor to comply with laws, regulations, rules, ordinances, codes, or orders applicable to the Contractor furnishing and performing the work. Engineer will perform the following construction services: Task 200: Conduct Project Administration Services. Design Professional will provide project management functions required to successfully complete the task series indicated above, including all project correspondence with the City; consultation with the City's staff; supervision and coordination of services; implementation of a project specific work plan, procedures, and a quality control/quality assurance plan; scheduling and assignment of personnel resources, administration and coordination of subconsultants, continuous monitoring of work progress; and invoicing for the work performed. Task 201: Monthly Project Status Reports. Design Professional will prepare a monthly project status report to identify work that has been performed in the reporting period, the work activities anticipated to be performed the next month, action items required of City for an efficient and effective delivery of the Design Professional's services, potential project scope variances with corrective actions suggested by the Design Professional. Task 202. Conformed Contract Documents. Prepare conformed contract documents and distribute copies to the City and Contractor. It is anticipated that a total of 3 sets (number of sets may be less) of the conformed drawings and specifications will be reproduced. Task 203. Preconstruction Conference. Attend a preconstruction conference at a date and time selected by the City and at a facility provided by the City. Elements of the conference include: City of Wichita Falls Attachment A 3 • Agenda and minutes • Discussion of Contractor's tentative schedules • Procedures for transmittal and review of Contractor's submittals • Processing applications for payment • Critical work sequencing • Change orders • Record documents • Contractor's responsibilities for safety and first aid Task 204. Construction Progress Review Meetings. Visit the construction site to observe progress of the work and consult with the City and the Contractor. A total of 10 construction progress meetings are anticipated. A total of one of Engineer's staff person for a 1-day site visit and progress meeting is included. Task 205. Shop Drawing Review. Review drawings and other data submitted by the Contractor as required by the construction contract documents. Engineer's review shall be for general conformity to the construction contract documents and shall not relieve the Contractor of any of his contractual responsibilities. Such reviews shall not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions and programs incident thereto. 200 hours are allotted for this task. Task 206. Requests for Information. Interpret construction contract documents when requested by the City or the Contractor. Requests for clarification or information shall be in writing and copies of Engineer's response shall be distributed to the City and Contractor. A maximum of twenty RFIs are allotted for this task. Task 207. Change Orders. Assist the City with the review of Contractor requests for project changes. Two change orders are allotted for this task. • Review documentation. • Assist with the preparation of the design change description and required drawings. • Prepare an independent estimate of the change order cost. • Submit recommendations to the City. Task 208. Punch List. Upon substantial completion, inspect the construction work and preparing a punch list of those items to be completed or corrected before final completion of the project. A total of one Engineer's staff person for a 1-day inspection is included. Task 209. Final Inspection. Upon completion or correction of the items of work on the punch list, participate in a final inspection to determine if the work is completed. A total of one Engineer's staff person for a 1-day inspection is included. City of Wichita Falls Attachment A 4 Task 210. Drawings Conformed to Construction Records. Upon completion of the project; revise the construction contract drawings to conform to the construction records. Submit to Owner in AutoCAD format. TASK SERIES 300: ADDITIONAL SERVICES Any work requested by the City that is not specifically stated in the Basic Scope of Services listed above will be classified as Additional Services. Additional Services shall be authorized in writing by the City. Additional Services will be performed based on the following Rate Schedule and mutually agreed upon number of hours. CATEGORY BILLING RATE RANGES Clerical $ 50.00 - $100.00 Engineering Technician $ 65.00 - $125.00 Project Accountant $ 65.00 - $150.00 Engineer $ 80.00 - $225.00 Sr. Engineer $125.00 - $250.00 Project Manager $150.00 - $250.00 Senior Technical Advisor $200.00 - $250.00 Principal $225.00 - $300.00 (End of Attachment A) City of Wichita Falls Attachment A 5 0 0 CO - o \ o o \ 00 o 0 \ jmC \ \ \ \ r 0 0 ® o $ / § § 5 0 - i- E � SD \ o 2 S D o 0 0 0 0 0 j +cn tel / \ @ \ \ 0 0 0 ° 2 22 % fig / / oo ƒ ? � a O. � z ® ® 2 ] k z 0 c I— / k 0 CI 0 E CO us 0 CC ) 2 0 f } \ \ \ \ 0 0 0 0 0 0 0 0 0 0 — § § � \ \ R kkk \ m ee � J oo / o _ G § / k R � Z 0 0 0 0 0 8 0 8 \ 0 •0 o . o 0 I-CL 0 \ \ \ } \ \ ƒ / � h. ■ 00 ox-i ox-i ® o (/) -I k k k k c u u u u Lu } 1- § c §§I / $ ' $u . 000 § 0 I W a , U. k • LU / 0 0 § _ / E \ 0 v § / \ c o I 0 \ ƒ - 0. _c ° u > \ \ 0 o0 \ ( \ \ _ m \ \ 2 ) ) - z j \ \ k - __ - § C / \ co § / / 7 \ \ ƒ 0 \ \ \ > ) w \ \ _c ® 0 \ \ / \ / \ I I / I CO } $ J \ » / * * * * 2 cc § LI 2 - Lu