Loading...
Res 061-2025 Application of TxDOT 2025 Transportation Alternatives Project - Circle Trail 06/03/2025 Resolution No. 61-2025 Resolution supporting the City of Wichita Falls' application to the Texas Department of Transportation's 2025 Transportation Alternatives Set-Aside (TA) call for projects WHEREAS, the City of Wichita Falls owns and operates a hike and bike trail system known as the Circle Trail that is openly used by the public for transportation and recreation; and, WHEREAS, the City of Wichita Falls periodically designs and constructs new sections of the Circle Trail as funding is available, and this section, known as the Hike and Bike Trail Along Lake Wichita, is the last remaining section of trail before closing the loop of the Circle Trail; and, WHEREAS, the Texas Department of Transportation issued a call for projects in January 2025 for communities to apply for funding assistance through the Transportation Alternatives Set-Aside (TA) Program; and, WHEREAS, the TA funds may be used for the development of preliminary engineering (plans, specifications, and estimates, and environmental documentation) and the construction of pedestrian and bicycle infrastructure. The TA funds require a local match, comprised of cash or Transportation Development Credits (TDCs), if eligible. The City of Wichita Falls would be responsible for all nonreimbursable costs and 100% of overruns, if any, for TA funds. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The City of Wichita Falls supports funding this project as described in the 2025 TA Detailed Application and is willing to commit to the project's development, implementation, construction, maintenance, management, and financing. The City of Wichita Falls is willing and able to enter into an agreement with the department by resolution or ordinance, should the project be selected for funding. PASSED AND APPROVED this the 3rd day of June, 2025. C MAYOR ATTEST: c , B� City Clerk WICHITA FALLS CIRCLE TRAIL MAY 2025 WICHITA FALLS, TEXAS I u � TOTAL: 24.0 MILES OF TRAIL AROUND THE CITY ____ r N _L__1 � ii EXISTING TRAIL-22.7 MILES W ` E UNDER CONSTRUCTION-0.4 MILES S li PROPOSED TRAIL-0.9 MILES ®.♦ ��y,._ i a✓ , 1_ wrtri-.vts UNDER 1_m= I. PARK r Iue�Par ��A�mm� �� .� CONSTRUCTION �� 367 �� ,0„0. rr. i ,� a •� .144 �IU(( 1 SEYMOUR HWY-I.+� • ' I . I A7CHITA BLUFF_ L1 _ A� �� . _�r � r �� _ I .. i:G.. Erg -- `.■ . NATURE AREA 1_i� „ •O -11\ ,Imo r , ♦j �4. ,1L�a� �'�-�- It: aa SDI 1�1 9� �� � him®���®�®�°„�_�"'` aloAegi ce z01 v LIio■I•� � , :=111 , ..._ -- 41- k. ....,..,..".. -Ire Mill w _tea �, ff!IPI-b_ 117 KELL - " CALL FIELD RDII trig ra irg i..'il1.IILL...... _, 1 -.„ ,mu,iEC ' a g� ill 1� iir# - 1i. v ,.. . ;_v, , m, ...m... MIrIt, r J , {SOUTHWEST - 6 s- �= _. el 00- 1 —,/Wiz' ikIP I _. .. _ _ilia ._.. " _i ; —1 1 j' — .:_ ` foPosEDTRfL i sourr�vsTPKwy_ 1. � . o �F L_ O -A .- Kg , r (-7_,,,, A \ O ""'I 74 ""r ..RK I / \ a ii a Lake Wichita ---- �'1 4.-4,, T E%A 9 Cost Estimate Wichita Falls Circle Trail _ Hike and Bike Trail Along Lake Wichita Item Description Unit I Quantity I Unit Price I Total 1 Mobilization& Insurance LS 1 $185,200.00 $185,200.00 2 Site Preparation STA 46 $2,500.00 $115,000.00 3 Excavation_ CY 3,000 $20.00 $60,000.00 t 4 Embankment CY 12,000 $25.00 $300,000.00 5 Concrete Pavement SY 5,250 $85.00 $446,250.00 6 Concrete Retaining Wall SF 3,750 $130.00 _ $487,500.00 7 Concrete Footing LF 500 $50.00 $25,000.00 8 Handrail LF 1,750 $175.00 $306,250.00 9 Park Bench w/Pad EA 3 $6,000.00 $18,000.00 10 Concrete Culvert(cast-in-place) EA 5 $4,000.00 $20,000.00 11 Stormwater Pipe(24"dia.) LF 350 — $250.00 $87,500.00 12 Stormwater Pipe(36"dia.) LF 50 $300.00 $15,000.00 13 Stormwater Pipe(48"dia.) LF 50 $400.00 $20,000.00 14 Stormwater Pipe(60"dia.) L LF 150 $500.00 $75,000.00 15 Stormwater Headwall(24"dia.) EA 8 $3,500.00 $28,000.00 -16 Stormwater Headwall(36"dia.) EA 2 $4,500.00 $9,000.00 17 Stormwater Headwall(48"dia.) EA 1 $5,500.00 $5,500.00 18 Stormwater Headwall (60"dia.) EA 1 $7,500.00 $7,500.00 19 Stormwater Concrete Area Inlet EA 3 $7,500.00 $22,500.00 20 Stormwater Junction Box EA 2 $6,000.00 $12,000.00 21 Rock Rip Rap CY 500 $150.00 $75,000.00 22 Concrete Rip Rap SY 1,000 $70.00 $70,000.00 23 _Concrete and Final Grading SY 12,000 $10.00 ' $120,000.00 24 Revegetation SY 12,000 $1.50 $18,000.00 25 Erosion Control Mat SY 12,000 $3.00 $36,000.00 26 Steel Bridge LF 350 $2,500.00 $875,000.00 27 Bridge Abutments/Bents EA 6 $60,000.00 $360,000.00 28 Stormwater Pollution Prevention LS 1 $75,000.00 $75,000.00 29 Trench Safety LS 1 $15,000.00 $15,000.00 Construction Subtotal $3.889,200.00 Construction Contingency 20% $777,840.00 Environmental Permitting/Mitigation $275,000.00 Design, Bidding,&Construction Management $466,704.00 Right-Of-Way Acquisition 65k SF @ $2.5/SF $162,500.00 Total per _1i^2s S5,571,244.00 ia,lrirZkt% ar *I� fi :to - T. Traw $ U.: is 7 ‘11 OF r