Res 061-2025 Application of TxDOT 2025 Transportation Alternatives Project - Circle Trail 06/03/2025 Resolution No. 61-2025
Resolution supporting the City of Wichita Falls' application to the
Texas Department of Transportation's 2025 Transportation
Alternatives Set-Aside (TA) call for projects
WHEREAS, the City of Wichita Falls owns and operates a hike and bike trail
system known as the Circle Trail that is openly used by the public for transportation and
recreation; and,
WHEREAS, the City of Wichita Falls periodically designs and constructs new
sections of the Circle Trail as funding is available, and this section, known as the Hike
and Bike Trail Along Lake Wichita, is the last remaining section of trail before closing the
loop of the Circle Trail; and,
WHEREAS, the Texas Department of Transportation issued a call for projects in
January 2025 for communities to apply for funding assistance through the Transportation
Alternatives Set-Aside (TA) Program; and,
WHEREAS, the TA funds may be used for the development of preliminary
engineering (plans, specifications, and estimates, and environmental documentation) and
the construction of pedestrian and bicycle infrastructure. The TA funds require a local
match, comprised of cash or Transportation Development Credits (TDCs), if eligible. The
City of Wichita Falls would be responsible for all nonreimbursable costs and 100% of
overruns, if any, for TA funds.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
The City of Wichita Falls supports funding this project as described in the 2025 TA
Detailed Application and is willing to commit to the project's development,
implementation, construction, maintenance, management, and financing. The City of
Wichita Falls is willing and able to enter into an agreement with the department by
resolution or ordinance, should the project be selected for funding.
PASSED AND APPROVED this the 3rd day of June, 2025.
C MAYOR
ATTEST:
c , B�
City Clerk
WICHITA FALLS CIRCLE TRAIL
MAY 2025
WICHITA FALLS, TEXAS
I
u �
TOTAL: 24.0 MILES OF TRAIL AROUND THE CITY ____ r N
_L__1
�
ii EXISTING TRAIL-22.7 MILES
W ` E
UNDER CONSTRUCTION-0.4 MILES S
li PROPOSED TRAIL-0.9 MILES ®.♦ ��y,._
i a✓
, 1_ wrtri-.vts
UNDER 1_m= I. PARK
r Iue�Par ��A�mm� �� .�
CONSTRUCTION
�� 367 �� ,0„0. rr. i
,� a •� .144
�IU(( 1 SEYMOUR HWY-I.+� • ' I .
I A7CHITA BLUFF_ L1 _ A� �� .
_�r � r �� _ I
.. i:G.. Erg -- `.■ .
NATURE AREA 1_i� „ •O
-11\ ,Imo r , ♦j �4. ,1L�a�
�'�-�- It: aa SDI 1�1 9� ��
� him®���®�®�°„�_�"'`
aloAegi
ce
z01 v LIio■I•� � , :=111 ,
..._ -- 41- k. ....,..,..".. -Ire Mill w
_tea
�, ff!IPI-b_
117 KELL - " CALL FIELD RDII trig ra irg i..'il1.IILL...... _, 1 -.„ ,mu,iEC '
a g� ill 1�
iir#
- 1i. v ,.. . ;_v, , m, ...m...
MIrIt, r
J ,
{SOUTHWEST - 6 s- �= _. el 00- 1 —,/Wiz' ikIP I
_. .. _ _ilia ._.. " _i
; —1 1 j' —
.:_ ` foPosEDTRfL i sourr�vsTPKwy_ 1. � .
o �F
L_
O -A .- Kg , r (-7_,,,, A \
O ""'I 74 ""r ..RK I / \ a ii a
Lake Wichita
----
�'1 4.-4,, T E%A 9
Cost Estimate
Wichita Falls Circle Trail
_ Hike and Bike Trail Along Lake Wichita
Item Description Unit I Quantity I Unit Price I Total
1 Mobilization& Insurance LS 1 $185,200.00 $185,200.00
2 Site Preparation STA 46 $2,500.00 $115,000.00
3 Excavation_ CY 3,000 $20.00 $60,000.00 t
4 Embankment CY 12,000 $25.00 $300,000.00
5 Concrete Pavement SY 5,250 $85.00 $446,250.00
6 Concrete Retaining Wall SF 3,750 $130.00 _ $487,500.00
7 Concrete Footing LF 500 $50.00 $25,000.00
8 Handrail LF 1,750 $175.00 $306,250.00
9 Park Bench w/Pad EA 3 $6,000.00 $18,000.00
10 Concrete Culvert(cast-in-place) EA 5 $4,000.00 $20,000.00
11 Stormwater Pipe(24"dia.) LF 350 — $250.00 $87,500.00
12 Stormwater Pipe(36"dia.) LF 50 $300.00 $15,000.00
13 Stormwater Pipe(48"dia.) LF 50 $400.00 $20,000.00
14 Stormwater Pipe(60"dia.) L LF 150 $500.00 $75,000.00
15 Stormwater Headwall(24"dia.) EA 8 $3,500.00 $28,000.00
-16 Stormwater Headwall(36"dia.) EA 2 $4,500.00 $9,000.00
17 Stormwater Headwall(48"dia.) EA 1 $5,500.00 $5,500.00
18 Stormwater Headwall (60"dia.) EA 1 $7,500.00 $7,500.00
19 Stormwater Concrete Area Inlet EA 3 $7,500.00 $22,500.00
20 Stormwater Junction Box EA 2 $6,000.00 $12,000.00
21 Rock Rip Rap CY 500 $150.00 $75,000.00
22 Concrete Rip Rap SY 1,000 $70.00 $70,000.00
23 _Concrete
and Final Grading SY 12,000 $10.00 ' $120,000.00
24 Revegetation SY 12,000 $1.50 $18,000.00
25 Erosion Control Mat SY 12,000 $3.00 $36,000.00
26 Steel Bridge LF 350 $2,500.00 $875,000.00
27 Bridge Abutments/Bents EA 6 $60,000.00 $360,000.00
28 Stormwater Pollution Prevention LS 1 $75,000.00 $75,000.00
29 Trench Safety LS 1 $15,000.00 $15,000.00
Construction Subtotal $3.889,200.00
Construction Contingency 20% $777,840.00
Environmental Permitting/Mitigation $275,000.00
Design, Bidding,&Construction Management $466,704.00
Right-Of-Way Acquisition 65k SF @ $2.5/SF $162,500.00
Total per _1i^2s S5,571,244.00