Res 140-2024 Pipe Rehab Services for Cypress 61 Plant Pipe Gallery 11/05/2024 Resolution No. 140-2024
Resolution authorizing the purchase of pipe rehabilitation services for
the improvements to the CYPRESS 61 Plant Pipe Gallery from
Insituform Technologies, LLC, in the amount of $848,000.00
WHEREAS, the City of Wichita Falls has multiple water treatment plants that add
resiliency to the water treatment system, and,
WHEREAS, the 61 Plant pipes in the pipe gallery are in need of rehabilitation in
order to continue to the operation of the 61 Plant to treat drinking water; and,
WHEREAS, the City of Wichita Falls has received an estimate from Insituform for
pipe rehabilitation services; and,
WHEREAS, Insituform is a member of the BuyBoard Purchasing Cooperative.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
City Staff is authorized to execute all documents necessary for the rehabilitation of
the piping in the 61 Plant at the Cypress Water Treatment Facility, from Insituform
Technologies, LLC, in the amount of$848,000.00
PASSED AND APPROVED this the 5th day of November 2024.
MAYOR
ATTEST:
City Clerk
Tim Peterie
Phone:214-317-0950
Cansituform- Email:tpeteriedazuria.com
1103 Postwood Dr.
An azuria'Woter Solutions Company Corinth,TX 76210
September 12,2024 SF#:SO-00196422
Mr. Mark Southard
City of Wichita Falls
4801 Big Ed Neal Dr
Springdale,AR 76310
Buyboard Proposal
Project Name: City of Wichita Falls,TX-61 Plant High Service Pump Station Rehab
30"Steel Rehabilitation by GFRP
INSITUFORM TECHNOLOGIES,LLC herein proposes to furnish all labor, materials, equipment, and services necessary
to reconstruct the referenced project(as detailed in the record drawings and other information presented by the
City of Wichita Falls)utilizing the Local Government Purchasing Cooperative Contract#730-24 administered
through the BuyBoard.
ASSUMPTIONS AND QUALIFICATIONS
Insituform plans to provide and install advanced composite materials and components meeting all applicable
industry standards, installed by our Fibrwrap crews,and manufactured by FyfeRFP, LLC.
The TYFO® system utilized within our rehabilitation and strengthening processes have been developed over
nearly 30-years of R&D, resulting in our patented installation process (US Patent 5,931,198). Our unique
process utilizes a wet-layup methodology which ensures that all carbon and glass fiber materials are 100%
saturated with epoxy, resulting in maximum strength of the cured system(s). Our epoxies produce zero (0)
VOC's and are NSF-61 certified.
Insituform will supply the City of Wichita Falls with 1-year Performance, Payment, and Maintenance Bonds and
Certificate of Insurance following acceptance of this proposal.
The pricing in this proposal assumes that all Technical Specifications set forth by the BuyBoard will be strictly
adhered to. Any changes to these specifications must be noted and agreed upon by both parties prior to finalizing
the proposal pricing.
Special: 1. Quantities are estimated based on the information provided and survey data. Actual
quantities utilized will be billed.
2. The City of Wichita Falls will provide access to the plant Mon-Sat for 24-hours and two
shifts per day. We expect the work to take about 2-3 weeks to complete.
3. The City of Wichita Falls will provide flow isolation to the lines in question in order to
stop active leaks until the those areas can be addressed.
PROPOSAL TERMS AND CONDITIONS
Terms and Conditions from the Local Government Purchasing Contract are available upon request from the
BuyBoard. Insituform will utilize the Wichita Falls Standard General Conditions and Instructions to Bidders
where applicable. Any changes to these conditions must be noted and agreed upon by both parties.
An award letter dated January 24, 2024 from the BuyBoard is being provided as an attachment.
September 12,2024
Page 3
Owner to Provide/Exclusions:
1. Access to work area,flow isolation as needed to include lockout/tagout of all incoming flows, isolation of work
area from rest of plant.
2. Abatement and disposal of any hazardous materials(if applicable).
3. Potable/process water.
4. Secured lay down areas large enough to store all Insituform materials and equipment required to complete the
scope of work.
5. State and local sales and/or use taxes on the value of the project. If you are exempt, please submit the
appropriate documentation.
6. Project Permits and/or local licenses.
OFFERED BY: ACCEPTED BY:
INSITUFORM TECHNOLOGIES,LLC
SIGNATURE DATE
76j4g0r4 Perm&
TIMOTHY R.PETERIE NAME
BUSINESS DEVELOPMENT MANAGER
REVIEWED BY: TITLE
ANDY OZMENT
AREA VICE PRESIDENT
ORGANIZATION
cc: Russell Schreiber, PE(COWF)
Ben Hawkins
Craig Nolen
This accepted proposal constitutes a formal agreement. If you initiate a purchase order or other
document,it will not be acknowledged without this proposal being referenced or as an attachment.