Loading...
Res 078-2024 Authorize Emergency Repair Lift Station Number 5 07/16/2024 Resolution No. 78-2024 Resolution authorizing the expenditure for an emergency repair at Lift Station Number 5 to Bowles Construction Company, in the amount of $62,583.82 WHEREAS, the City of Wichita Falls has an extensive wastewater collections system that conveys an extremely hazardous and aggressive waste away from residences and businesses; and WHEREAS, the City of Wichita Falls requires the use of numerous lift stations within the collections system to properly convey that aggressive waste to the treatment plant; and WHEREAS, it is necessary to repair lift station piping to prevent raw, untreated sewage from backing up into homes or being spilled on the ground and/or waterways creating a regulatory violation for the City of Wichita Falls; and WHEREAS, TEX. LOC. GOV'T CODE § 252.022(a)(3) allows a City to make purchases and repairs, without bidding, when necessary to preserve or protect the public health or safety of the municipality's residents WHEREAS, the City of Wichita Falls has received an invoice from Bowles Construction Company for the emergency repairs of Lift Station 5. NOW, THEREFORE, BE IT BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: City Staff is authorized to expend funds for an emergency repair at Lift Station Number 5 to Bowles Construction Company, in the amount of $62,583.82. PASSED AND APPROVED this the 16th day of July, 2024. MAYOR ATTEST: Natu, City Clerk BOWLES CONSTRUCTION COMPANY0 o�E a P.O.BOX 1764 p s WICHITA FALLS,TEXAS 76307 z' ��R.E."POTTER"BOWLES 9FSpFgMEa�";t, OWNER/PRESIDENT Voice 940-766-3518•Fax 940-766-3564 To: City of Wichita Falls 1004 River Road Wichita Falls,TX 76305 Attention: Harold Burris (940)397-2595 harold.burris(o�wichitafal lstx.gov From: Douglas Berend Date: June 19,2024 General Manager Re: LS-Sewer Line Repair Invoice#: 1379-21 Sunset Drive&Riverside Drive Wichita Falls,Texas INVOICE SANITARY SEWER SYSTEMS PROPOSAL: Repair existing Lift Station-Sewer Line per direction of City of Wichita Falls. ITEM#is Labor/Equipment 73 HR $ 500.00 $ 36,500.00 ITEM#2: Materials/Supplies 1 LS $ 1,327.29 $ 1,327.29 ITEM#3: Equipment Rental(Bypass) 1 LS $ 8,998.00 $ 8,998.00 ITEM#a: Subcontractor(Electrical) 1 LS $ 15,758.53 $ 15,758.53 $ 62,583.82 CONTRACT INFORMATION: Original Contract Amount: $ 62,583.82 Change Order#1: $ - Change Order#2: $ - Revised Contract Amount $ 62,583.82 CURRENT PORTION OF WORK COMPLETED: Work Performed to Date: $ 62,583.82 Materials on Hand: $ - Less:Amount Retainage: $ - 0.0% $ 62,583.82 WORK COMPLETED TO DATE: Work Performed to Date: $ 62,583.82 Materials on Hand: $ - Less:Amount Retainage: $ - 0.0% $ 62,583.82 Less:Previous Payments: Amount Due this Estimate: $ 62,583.82 WEBSITE: www.bowles-constcom