Loading...
Res 059-2024 Award Contract to 2024 Sanitation Dumpster Maintenance to Gloria Villarreal Welding 06/04/2024 Resolution No. 59-2024 Resolution authorizing the City Manager to award contract for the 2024 Sanitation Dumpster Maintenance to Gloria Villarreal Welding WHEREAS, the City of Wichita Falls has advertised for proposals for the 2024 Sanitation Dumpster Maintenance; and WHEREAS, it is found that the most responsible bidder is Gloria Villarreal Welding, who made a unit price proposal for services in an estimated amount of $250,000.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price proposal for the 2024 Sanitation Dumpster Maintenance is awarded to Gloria Villarreal Welding, in an estimated total amount of $250,000.00, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 4th day of June 2024. MAYOR ATTEST: Zu , City Clerk 2024 Sanitation Dumpster Maintenance GLORIA LINDEMAN ITEM DESCRIPTION UNIT VILLARREAL WELDING WELDING 1-3 Preparation, Primer and Painting of Frontload 3-yd Dumpster EA $ 195 $ 700 1-4 Preparation, Primer and Painting of Frontload 4-yd Dumpster EA $ 197 $ 700 1-6 Preparation, Primer and Painting of Frontload 6-yd Dumpster EA $ 290 $ 750 1-8 Preparation, Primer and Painting of Frontload 8-yd Dumpster EA $ 315 $ 800 1-A Preparation, Primer and Painting of an Alley 3-yd Dumpster EA $ 265 $ 700 2-3 Major Lid Repair of Frontload 3-yd Dumpster EA $ 83 $ 475 2-4 Major Lid Repair of Frontload 4-yd Dumpster EA $ 140 $ 475 2-6 Major Lid Repair of Frontload 6-yd Dumpster EA $ 182 $ 500 2-8 Major Lid Repair of Frontload 8-yd Dumpster EA $ 182 $ 600 2-A Major Lid Repair of an Alley 3-yd Dumpster EA $ 165 $ 475 3-3 Minor Lid Repair of a Frontload 3-yd Dumpster EA $ 50 $ 475 3-4 Minor Lid Repair of a Frontload 4-yd Dumpster EA $ 55 $ 475 3-6 Minor Lid Repair of a Frontload 6-yd Dumpster EA $ 55 $ 500 3-8 Minor Lid Repair of a Frontload 8-yd Dumpster EA $ 55 $ 600 3-A Minor Lid Repair of an Alley 3-yd Dumpster EA $ 80 $ 300 4-3 Top Frame&Sides Repair/Replace of a Frontload 3-yd Dumpster EA $ 410 $ 400 4-4 Top Frame&Sides Repair/Replace of a Frontload 4-yd Dumpster EA $ 517 $ 400 4-6 Top Frame&Sides Repair/Replace of a Frontload 6-yd Dumpster EA $ 658 $ 450 4-8 Top Frame&Sides Repair/Replace of a Frontload 8-yd Dumpster EA $ 658 $ 600 4-A Top Frame&Sides Repair/Replace of an Alley 3-yd Dumpster EA $ 370 $ 400 5-6 Sliding Doors for a Frontload 6-yd Dumpster EA $ 88 $ 450 5-8 Sliding Doors for a Frontload 8-yd Dumpster EA $ 88 $ 500 6-3 Fork Sleeves and Scuff pads for a Frontload 3-yd Dumpster EA $ 370 $ 300 6-4 Fork Sleeves and Scuff pads for a Frontload 4-yd Dumpster EA $ 370 $ 300 6-6 Fork Sleeves and Scuff pads for a Frontload 6-yd Dumpster EA $ 370 $ 300 6-8 Fork Sleeves and Scuff pads for a Frontload 8-yd Dumpster EA $ 370 $ 300 7-3 Bottom Plate&Skid Repair/Replace for a Frontload 3-yd Dumpster EA $ 570 $ 600 7-4 Bottom Plate&Skid Repair/Replace for a Frontload 4-yd Dumpster EA $ 687 $ 600 7-6 Bottom Plate&Skid Repair/Replace for a Frontload 6-yd Dumpster EA $ 763 $ 600 7-8 Bottom Plate&Skid Repair/Replace for a Frontload 8-yd Dumpster EA $ 763 $ 700 7-A Bottom Plate&Skid Repair/Replace for an Alley 3-yd Dumpster EA $ 456 $ 600 8-A Lift Pin for an Alley 3-yd Dumpster EA $ 275 $ 600 9 Miscellaneous Shop Repairs for Dumpster EA $ 75 $ 150 9-6 Top Lid(non-slant) Repair on 6-yd Dumpster EA $ 200 $ 475 9-8 Top Lid(non-slant) Repair on 8-yd Dumpster EA $ 200 $ 500 10 Miscellaneous Field Repairs for Dumpster EA $ 75 $ 150 10-6 Bottom Repair of 6-yd dumpster(new type) EA $ 930 $ 500 10-8 Bottom Repair of 8-yd dumpster(new type) EA $ 930 $ 600 SUBTOTAL $ 12,502 I $ 19,000