Loading...
Res 021-2024 GMP of $16,389,745 for CMAR Memorial Auditorium Renovation 02/20/2024 Resolution No. 21-2024 Resolution authorizing a guaranteed maximum price (GMP) of $16,389,745 in the Construction Manager at Risk contract with Anthony Inman Construction, Inc. for package #2 associated with services related to the Memorial Auditorium Building Renovation project WHEREAS, The American Rescue Plan Act (ARPA) allocated approximately $29.1 M to the City of Wichita Falls to provide economic relief in areas that were negatively impacted by the COVID-19 Pandemic; and, WHEREAS, the installation of a new HVAC system to improve indoor air quality, and reduce transmission of airborne disease in the public assembly building, falls under the ARPA-eligible categories 1 .4 Prevention and 1 .14 Other / Capital Alteration in Response; and, WHEREAS, improving the commercial-use portions of the building, including the performance space and adjacent support spaces, in order to stimulate the post-pandemic recovery of local restaurants, bars, and hotels. This falls under the ARPA eligibility categories 1 .4 Prevention, 2.29 Small Businesses, 2.35 Tourism, and 2.34 NPOs; and, WHEREAS, renovating the public offices within the facility, including increasing the number of restroom facilities to accommodate large events, replacing 100-year-old electrical and plumbing services, and performing necessary asbestos abatement and ADA compliance measures. This falls under the ARPA eligibility category 6.1 General Government Services. This will result in a safer, healthier, and more accessible environment for the public; and, WHEREAS, City Council passed a non-binding resolution on June 14, 2022, creating a general plan for the use of ARPA funds; and, WHEREAS, Memorial Auditorium was constructed in 1927, renovated once in 1964, and in need of renovation of the public spaces and office areas to boost the economic impact and improve the ability to provide safe social distancing; and, WHEREAS, the City Council awarded an American Institute of Architects contract to Bundy, Young, Sims, and Potter Architects to provide professional services to prepare the necessary documents for the Memorial Auditorium Building renovation; and, WHEREAS, a Request of Qualification was published in November 2022, where three submissions were received, and Anthony Inman Construction, Inc. received the highest rating; and, WHEREAS, on October 17, 2023 City Council approved an early bid package with Anthony Inman Construction, Inc. for demolition and asbestos abatement services, as well as the purchase and installation of the replacement building HVAC system and electrical switch gear for Memorial Auditorium with an estimated cost of $1 ,984,293 and delegating evaluation authority to the City Manager to the maximum extent authorized by Texas Gov't Code § 2269.053; and, WHEREAS, the guidance from the American Rescue Plan Act allows for the appropriation of these funds for this purpose. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: Resolution authorizing the City Manager to enter into an agreement, in a form approved by the City Attorney, for an addendum to the original contract for the guaranteed maximum price (GMP) for package #2 of $14,405,452 in the Construction Manager at Risk contract with Anthony Inman Construction, Inc. for a total GMP of$16,389,745 which includes Packages #1 and #2 for services related to the Memorial Auditorium Building Renovation project. PASSED AND APPROVED this the 20th day of February 2024. MAYOR ATTEST: .17q City Clerk