Loading...
Res 130-2023 Emergency Rehabilitation of 436 feet of Sewer Collections Pipeline at Lift Station 14 11/07/2023 Resolution No. 130-2023 Resolution authorizing the emergency rehabilitation of 436 feet of sewer collections pipeline at Lift Station 14, by Insituform Technologies LLC., in the amount of$84,850.00 WHEREAS, one of the City of Wichita Falls' Strategic Goals is to Provide Adequate Infrastructure; and, WHEREAS, the City desires to continue to remain compliant with Federal and State regulations regarding Sanitary Sewer Overflows with a reliable wastewater collections system; and, WHEREAS, the City has recently experienced a failure of said wastewater collections system at Lift Station 14; and, WHEREAS, it is in the best interest of the City of Wichita Falls to sole-source the emergency rehabilitation of the discharge pipeline at Lift Station 14 to Insituform Technologies LLC., NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: City staff is authorized to execute all documents necessary to purchase the pipe and services to rehabilitate the Lift Station 14 discharge pipeline from Insituform Technologies LLC., in the amount of$84,850.00. PASSED AND APPROVED this the 7th day of November, 2023. ge4'‘W° MAYOR ATTEST: 1-q QiL(.c� L J City Clerk .rncl2 semTechr s,LLChasu6sialsyyofAetknCarrc",::..°' insituforn7 1103 err. MarrIE Trn Peterle Fa= 94{1-496-7163 lLt:r...T5.044S. LLC Co-Ir.h.TX 7621: Ptwne:214-317-095D Erna torkcc :cmo An Aegron Company w".Ir6-1°DrT.crrr October 30,21D23 SF=: .1O-DC 2C432 Mr.Russell Schreiber PE City of Wichita Falls 13CID7°i St. Wichita Falls, TX 73001 Buyboard Proposal Frojen Name: City of Wichita Falls,TX-Harlan Ave 10' Ford Main Rehab by Pipe Burst HOPE SUR 13.5 INSRUFOR*t TECHNOLOGIES,LLC herein proposes to furnish a Proposal forall labor, materials,equipment,and services necessary to reconstruct the referenced project(as detailed in the project location maps and other information presented by the City crf Wichita Falls')utilizing the Local Purchasing Cooperative Contract#635-21, administered through the BuyBoard_ ASSUMPTIONS 1IONS AND QUALIFICATIONS We have based this proposal on a nominal wall thickness as shown in the price. This is based on the best available information at the time.of this proposal. Existing pipe deueriaration in excess df the conditions assumed, ground water loads in excess o=those assumed, or other loads or conditions may increase the recommended thickness far all or portions o=the wark. Final recommendations may be submitted to you following the completion of the preliminary TV phase o=the project Stated prices are subject to adjustment if design changes are agreed upon. Water shall be provided at rro cost to I nsituform Techndogies,LLC for all construction phases of this project The Owner shall furnish Insitufarm Technologies,LLC with required water meters and pay all associated fees, deposits,and charges. Insitufomi Technologies,LLC will failure all required backflow prevention and metering procedure I nsituform will supply the City of Wichita Falls a Certificate of Insurance following acceptance of this proposal_The pricing in this proposal assumes that all Technical 5peciflcations set forth by the BuyBoard will be strictly adhered to. Any changes to these specifications must be noted and agreed upon by both parties prior to finalizing the proposal pricing_ Special: 1_ Water shall be provided as noted above. 2_ Insitufonn estimates starting this project the week of November 1311. 3_ Owner will provide access pits,area to off load and fuse pipe,string line for pipe bursting,pre'post-TV if required,traffic control,bypass,restoration,and testing. PROPOSAL P9IC:HG PAY 8TY UIM UNIT ESTIMATED ITEM DESCRIPTION PRICE AMOUNT 1 Travel&Mobil ization-Pipe Burst Crew 1 EA $7,501100 $7,50I1_0O 2 Truckingt/LoadfOFf Load HDPE Pipe 1 LS $7,501100 $7,560_DO 3 Burst Existing 1 fa"or 1IY IPS SDR 19(f3"-8'deep) 436 LF $70.00 $30,521100 4 Change Pipeburst Pipe to Non-Standard Pipe 3DR 4,366 IN-DL41LF $d_75 $29,4313_0O 13_5Add-On(Pressure Rated) 5 Connect la Existing Manhole Of PVC Pipe in Pit 2 EA $1,200.00 $a2,401100 6 Owner's Contingency Allowance 1 AL $7,501100 $7,500_DO TOTAL '$114,060.00 Note:A Tax-Exempt certificate will need to be provided prior to mobilization. October 30_ 2O PaEc PROPOSAL INCLUSIONS The prices stated in this proposal include: 1. Mobilizations and demobilization. 2 HDPE Pipe and fusion or pipe bursting. 3_ Confined space safe entry practice's_ 4. One-year standard construction warranty. 5, Certificate of insurance with a standard coverage. PROPOSAL EXCLUSIONS Not included in the prices stated in this estimate are axis associated with the items listed below. These items, if needed or found to be applicable, would be provided by INSlFIJEORM TECHNOLOGIES,LLC at your additional cost;or would be furnished by others, at your direction,at no cost to INdRUFOR/d TECHNCLOGIES, LLC: a) If preliminary video inspecticn of the pipe interior indicates excessive damage, or other extra-ordinary condition,which will require excavation,or other extraordinary remedy,to prepare the pipe for pipe bursting, then those services will be provided by utilizing the Owner's Contingency Allowance after approval. b) Additional mobilizations and/or setups may apply due to point repairs, obstruction removals,or delays out of our control. c} Traffic control. d) Sod or other surface restoration_ e) Bypass pumping. f) Water from fire hydrants within a convenient distance from each cleaning and inversion site location. g) Iff any hazardous of toxic materials are encountered daring the project, the Owner wiW be responsible far the removal and thsoczar of the materials. h) Projet permits and/or local licenses with be provided by the Owner or Engineer_ i} State and local sales an-dot-use taxes on the value of the project, If you are exempt, please submit the appropriate documentation. j) Additional premiums for special insurance coverage(s)demanded by you or other parties particular to this Project PROPOSAL TERMS Ala CONDITIONS a) Limits of Liability_ In consideration of INSFUFOIRM TECFNOLOGIES,LLC's agreement to maintain no less than $5,000,0130 of ccrr prehensive general liability insurance in the form required by the Contract, INSITUFORM TECHNOLOGIES, LLC's liability to the Owner for any matter covered by such insurance will be limi:ed:a the extent of such insurance. Neither party shall be liable to he other'or consequential damages relating to the contract. In case o conflict between his provision and any other provision in the Contract as ultimately executed,this provision shall govern and prevail_ b) LIMITED WARRANTY. IN LIEU OF ALL OTHER EXPRESSED, IMPLIED ANDOR STATUTORY. WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR L RPOSE, CCtlTIRACTOR AGREES TO CORRECT ANY DEFECTS IN THE MATERIALS OR SERVICES ROVI' ED BY CONTRACTOR WHICH ARE BROUGHT TO THE ATTENTION OF CONTRACTOR WITHIN ONE YEAR FOLLOWING COMPLETION OF CONTRACTOR'S WOFJ<, PROVIDED OWNER AFFORDS CONTRACTOR SL•ITABLE ACCESS AND WORKING CONDITIONS TO ACCOMPLISH SUCH CORRECTION_ c} JTUAL RELEASE OF CONSEQUENTIAL DAMAGES. Neither party shall be liable to the other for consequential damages relating to or arising out of the Contract. d) PROPOSAL SUBJECT TO NEGOTIATION OF OTHER STANDARD TERMS OF AGREEMENT. This proposal is subject to agreement of the parties on other terms and conditions as are customary in contracts of this nature. e) Quantities are estimated_ Unit prices apply for actual invoice and payment_ fl Payments are due at net within thirty days of invoice. Final payment is due within thirty days of completion of Project October 30. 2023 Paine 3 g) Monthly progress payments may be requested for the value of work in progress or completed, including materials secured and on site. h) Prices stated are in effect far thirty days from the date of this proposal_ The acceptance period may be extended at the sole option of IINSRUFORM TECHNOLOGIES,LLC_ i) Conflicts. In case of conflict between the provision df the aforesaid paragraphs and any other provision in the Contract as ultimately executed the provisions as set forth above shall govern and prevail. OFFERED BY: ACCEPTED BY: INSIUFOI11 TECHNOLOGIES, LLC 7e:miklaret , , Pileffie SIGNATURE DATE TIMOTHY R_PETERIE NAME BUSINESS DEIELOPMENTMAPIAGER RE49EV1'EL BY: TILE ANDY O041EHT AREG VP ORGANIZATION cc: Teresa Rose, PE(CO'WF) Daniel Nix (CO ) Alan Penegrino(CO'WF) Cordon Smith (CCXWF) Ben Hawkins