Loading...
Ord 38-2023 Modifying Water-Sewer Fund Budget for 7200 Bulk Storage Tank 07/18/2023 Ordinance No. 38-2023 Ordinance modifying the appropriations in the Water/Sewer Fund budget for the 2022-23 fiscal year for the sole-source replacement of a 7,200 gallon, fiberglass, Sodium Hydroxide bulk storage tank and associated attachments at the Microfiltration/Reverse Osmosis Plant within the Cypress Water Treatment Facility, by Fiber Glass Systems, L.P., in the amount of $89,653.00, and declaring an emergency WHEREAS, the City is currently operating in the 2022-23 fiscal year; and, WHEREAS, the current Sodium Hydroxide bulk chemical storage tank has developed a leak at its base and presents an extremely dangerous scenario of catastrophic failure that puts the Water Purification employees at risk and would render the MF/RO Plant inoperable while repairs were made; and, WHEREAS, due to this unforeseen emergency, the City of Wichita Falls, FY 2022-23 Budget needs modification; and, WHEREAS, in order to protect the health and safety of the City's residents, it is necessary for the City of Wichita Falls to immediately purchase the tank replacement from Fiber Glass Systems, L.P. as authorized by Texas Local Government Code 252.022(a)(2) and (a)(3). NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: $89,653.00 of unrestricted fund balance will be used to increase the FY 2022-23 Operating Budget to allow for the purchase of the Sodium Hydroxide Bulk Chemical Storage Tank replacement at the Microfiltration/Reverse Osmosis Plant within the Cypress Water Treatment Facility and that this ordinance is effective immediately. PASSED AND APPROVED this the 18th day of July 2023. /*,-, 02, ge41441---- MAYOR ATTEST: Qil c.v BC City Clerk Fiber Glass Systems I NY 0UOTATI'.ONI_ASTM Designed FRP Tanks To: Luke Baker FGS Proposal No: 220520 Rev 2 Of: City of Wichita Falls date: 61312f123 Wichita Fels,TX FCA 202d: Manufacturing Face y, Giddings, 1 Prices Firm Foc 30 days Submittal:,: tt-tt %wisARD Cell: ( )92340/1 Delivery: Q142 2024 after approved drawings =ax: Customer Ref. E-mail: Luke.Ba kerOwich itafallstx.Qom T-M-1-110 5 Fl3ER GLASS SYSTEMS L_P.IS ASIIE RTP-1 ACCREDITED In accordance with your subject inquiry, Fiber Glass Systems L.P.is pleased to offer our proposal to manufacture Fiberglass Tanks and Accessories. Acknowledged specification has been used as a reference only. Please refer to our scope letter for items to be supplied and exceptions to be taken,as some items n the specifications may not be included in our scope of supply.Revision 2 reflects an updated price. This quote is subject to the"General Terms and Condition of Sale'set forth by Firer Glass Syrsbems L.P ano s.our ttec with t^s quote. Limitations of use and defied warranties are set forth it product literature. Equipment solo=or specific env•0"me^1s must not be used for other environments before determining suitabiity with Fiber Glass Systems LP. Terms:Net 30.Ter is subject to craft approval with approved drawing. In the event Buyer Cancels an cider art&pnod.ldiel has begun,Buyer rill to subject to a 7516 Marge on NI made to order(WO).products.and 20%charge on al standard STD)pro:nets. ceivene ctwges are not subject to a cash dlscexrnt Net prtoes excknie tax. .If apell®tler taxes are the resperlstsaty cr p1..thaser. All Terms and Conditions are to be Mutually Agreed Upon Prior to Order Acceptance Products covered on this quotation are limited to Fiberglass Reinforced Plastic(FRP)Tanks and Fittngs_Al other materials of construction are not part of this quotation unless specif ca y stated in the scope of supply This quottion includes a^y the equipmerrt listed below and does not include any additional items referred to,inferred,a•assumed to be included by any speci lcatitcn correspondence or conversation. Manufacturing S000e ano Pricing are based on information and documents provided at time of request for quotaton a together with the utiiza ion of Firer Glass Syrsbe'ns L.P standard components.Components are manufactured following standarc FRP I^c..stry..ractices The prices and leas t'nes i^t^s quotation are based on current working rates and supplier prices.In the event of a^y changes we reserve the rig-1 lc withdraw cr amend this quote_ PROJECT!REFERENCE: Replacement 50%Sodium Hydroxide-Alkaline FRP Tank PROJECT LOCATION: Wichita Falls,TX SPECIFICATION: Referenced Belco drawing 02206307 notes DRAWINGS: Referenced Belco drawing 02206307 Our Local Representative for your area is: Steve Manchester The Manchester Group sieve }manchester-rouo corn (2f4)850-9479. Our Representative is there to assist you with any questions you may have as weft as any options we might offer. Scope of Supply T 75215 39900 Ftyr5IggS 5.61pml,1P Drknrr'frcam BMTmlar5v.lk.l Rood Mahon,TX T5513 F-5.1-07f-0 Peg**.i odd FGS Ts.c Pno xs.4a 220527 Rrr2 &3eV2025 item Qty_ Description f _- 1 Ea 12'-0"1.D.x 8'-6"SSW, Vertical, Domed Top,Flat Bottom,7,190-Gallon, Single Waif,insulated, Fiberglass 50% Sodium Hydroxide-Alkaline Storage rankis TA GiNo. Ti{-1 Each tank includes: IGrit- I Sire I Description I Service 3 Ea 3" Nozzle/s FiV,Drain,Overflow 1 Ea 6" Nozzlefs Outlet I Ea 8" Nozzle's Level Sensor 1 Ea 4" Nozzlefs Recycle 1 Ea 1" Nozzlefs Heat Tracing Temp.Cut-Off Sensor 1 Ea 6" Gooseneck Assembly Vent 1 Ea 30" Manway IN/Cover, 1/8"thk.EPDM Gasket&SS Hardware Top Access 1 Ea 30" Manway ye'Cover, 1/8"thk.EPDM Gasket&SS Hardware Side Access 4 Ea SS Lilting Lugs 4 Ea SS Anchor Lugs I Ea Lot Non Slip Top Coating 1 Ea Lot 2"Polyisocyamirate Insulation wi 3116 thick FRP Skin I Ea Heat Tracing System installed under instab'on 1 Ea Lot FRP External Pipe Support clips 1 Ea 3" FRP Filt internal Pipe w/Support clips 1 Ea FRP Encapsulated,Paper Data Name Plate 1 Ea 12 Month Warranty TANK Ni .n TK-1 DESIGNI MANUFACTURING PARAMETERS GENERAL: FLANGES: DL4ItTER: 17- C' HEIGHT: 8'- 6' TYPE: Flat Faced1FF) 6,7 D Operating <VOLUME CAP.pal'n 719D Nominal CONSTRUCTION: Hand Lay Up ESTUATE}%EIGHT: 391X1 LBS DRILMG: 15Q3ANSIB15.5 SHPPING DMIEllSIONS: 13.25 W x 13.25'H x 11.5 Long appcolimate PRES_RATMG: 5D P51 PRCJECTON: 6'(8'Co isssulated tanks) CHEMICAL SERVICE: 5D:6 5mdium Hycimakle-Alkaline GUSSETS: Conk.]on4'and under SPECIFIC GRM TV: 1.53 INSPECTIONS 8 TESTING: SEISMIC DESIGN: JCCsite Ground Moiion Acceleration Inspection&Terlingper Fiber Glass Sins PRat0L0.1 MID LOAD: 120 MPH DIM VERIFICATION: Inckatled CORROSION BARRIER STRUCTURE VISUAL INSPECTION(el: Level II ASTIJ 32562 Tab e 1 THICKNESS: 1DDnil Ueetcesigacriteria VISUAL INSPECTION'Structure!: Level III ASTIJ32562 Tat.e1 VEILS: 11)-Veils BARCOLHARDNESS: Inckaled LAMINATE: 12)1-1.2'ozChcgRan. Filaenentxnund ACEfONESENSTTWTIY: Ineka1ed RESPI: Prem.V NO Es1Ef Prem.Vinyl ESler LOI TESTING: NOT INCLUDED CLNE SYSTEM: CVNIEXP CC.1AEXP LAMINATE.PEW..TEST: NOT INCLUDED ELT.FINISH: Gel coal lONV hh6itor IND.INSPECTOR: WA COLOR: THD POST CURE Per resin mfg.'recmmnendetimn DESIGN CONDTIIONS I OPERATING COMEfTIOMS 44IR.HYDROSTATIC: Inckaded 1151F tt TEMPERATURE>> No1 tle-rkc-e1 ACOUSTIC EMISSION: NOT INCLUDED Aammspherk. «PRESSURE>> Nolclisc creel PRESSURE TEST: WA Allnaspherk '<VACUUM Nolclisc creel VACULUTEST: N:A Physical pro perks Based an 5tanda'c Laminate-es:Call FMMer GLxs 5yslem5 ARE RTP-1 3,6:CC Prot col n he asec TK-1's ENGINEERING l DESIGN STANDARD'S): AS NE RTP-1 DESIGN: NO PE STAMPE3. 'y.: USTI-0 MP: YES AP 123: 40 RTP-I CODESTAIPED: NO I FEA DESIGN: '1,A I ASTR-D'E : YES I AP 123 NOLICGR.UI: NO Unit Price Extension Estimated S d H Tankis No. TK-I Price: '$ 85,187.00 $ 85,187.00 $ 4,466.00 Shipping Terms are FCA 2020_Giddings TX Prepaid d Added at cost plus 1595.Pricing does not include taxes. /1J rill!T,Cckfaad+s Estimated too}mbsiEe T 7519r33 9UO Fnwr 61a,5 9eka.ME ram 21'11 1,n1;:r aladW Fs's-22052077e0 14Tdida FARs,TX--Tarok Q26111:L21157 9cten,TO 76i'-j F-5.1-00-4 Page No.2 of 4 FGS Tenk PrapassfNo.22i75 tRrr2 CaOr20.V3 EXCLUSIONS Taxes RTP-1 Visuadlevell RTP-1 Stamp,Documentation or Testing Offloading at final destination Performance or Warranty Bonds lnstaltabbn Instrumentation Spare Pads or tools Piping,Pumps or Valves Anchor bolts or Tank Pad Design(See Note f 2) Bolts or Gaskets(See Note 6) Anchor Lug Template Titanium hardware unless heed on scope Reid-Testing Ind-Lab Testing Start-up service Field Services Series#4000 Liquid Gauge Board In addition to listed exclusions,the following items are neither required or included herein this quotation: Declaration of Critical Service,Proof Testing, PEA Design,A ccust c Emissions Testing,Sloped Bottom,Mixer,Mixer Bridge, Ladders,Safety cages,Perimeter handrail, Platorms.Saf-T-Climb or felt arrest devices. The following NOTES are a very important part of this document PLEASE READ COMPLETELY Technical Details & Clarifications 1} Fiber Glass Systems L.P.will supply full submittals,fabrication drawings and design calculations. 2} Wind design is per 2010 version of the ASCE-7 unless otherwise stated 3} Seismic Design is based on Ground Motion Acceleration per ASCE-7 f IBC using project site's Zip code or Global Coordinates 4} All domed and dished heads will be ASM E F&D. 15} Insulation,if applicable,includes 2'Polyisocyanurate foam,factory installed,with exterior fiberglass skin- 6 Unless stated differently in scope of supply,and If applicable,nuts,boles&gaskets are included only with Manway access ports andlor blind flanges.All gaskets are EPDM.Hardware is SS T} Exterior Gel Coat is colored gray,white or tan. Gel coat contains UV stabilizer. If alternate color is required,submit color Ichip and request quotation. 0} Inspector shall be Fiber Glass Systems L.P.'s Quaky Control Principal. B} All tanks shall be hydro-tested prior to shipping. (10} Tanks must be vented. (11 ) Flat bottom,vertical tanks must be fully supported.All tanks shall sit on tank pads with a minimum concrete compressive strength of 4000 psi- (12} Hold Down Lugs are included.Fiber Glass Systems will not be responsible for tank anchor bolts to tank pad or anchorage connection design analysis- Estimated shipping&handling fee is based on today's fuel cost Freight is subject to change due to prevailing fuel (13) surcharges at the time of shipment;a ndlor changes to the number of required loads resulting from customers'delivery schedule. 1d} Delivery schedules are based upon current backlogs and subject to prior commitments.Please verify schedule at time Iof order placement. 115} As part of our design package, Fiber Glass Systems LP.will: .1. Determine the number of discrete anchorage points required per vessel. 2. Tensile and shear load per anchor point will be supplied to the Contractor's Civil Engineer to aid in the design of supporting concrete pads. 116} As it is outside the scope of the FRP Tank manufacturer,Fiber Glass Systems L.P.will not engage in the manufacture or design of supports,hangers andlor anchors including,but not limited to: 1. Concrete pads or reinforcing steel for concrete supports pads. 2. 'J'or'L'cast-in-place anchor bolts andlor any additional structural component of the concrete support pad others than those listed above. T 5.4 5t33 9UO Ftu,(5im'4ir4IPiiii,I ileka.ME ram TerrdaTS Vaikp Razkl c Maids FmYr22a52U Fie 241E6de Fair,TX-Teri 04otiot. Bohan,TX 76513 F-57-1-0 Peer M'c.:afd FCS Ter.cPmF•xs.4a 220520Rre2 &3[V2025 Attachments: Fiber Gass Systems LP Standard Terms and Conditions We trust we have interpreted your requirements correctly_and look Forward to being of further service to you in the future. Best regards; al/May al/May Aaratley 12E4r 933,9COD EXt 1 12 Ashley-Burnleyanov.com T 754 5 39999 Roo 64n SOW LP D kn+*4X cam Tmlorb walk.Rood arW FsYr22052V Rev 21Igalda Fats,TX-Tevak 0acir_ss Mahon,TX T65713 F-5.Y-00 1-0 Page Na.4aFd