Res 013-2023 Asphalt Rehab Project Contract to Freeman Paving, LLC 02/07/2023 Resolution No. 13-2023 Resolution authorizing the City Manager to award bid and contract for the 2023 Asphalt Rehabilitation Project to Freeman Paving, LLC in the amount of $2,396,285.00 WHEREAS, the City of Wichita Falls has advertised for bids for the 2023 Asphalt Rehabilitation Project; and, WHEREAS, it is found that the lowest responsible bidder is Freeman Paving, LLC, who made a unit price bid with an estimated total of$2,396,285.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the 2023 Asphalt Rehabilitation Project is awarded to Freeman Paving, LLC in an estimated total amount of $2,396,285.00, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 7th day of February 2023. /rz _0 MAYOR ATTEST: _.11V 41 City Clerk 2023 Asphalt Rehabilitation Project C W F23-100-02 Bid Date:January 24,2023 BASE BID Freeman Paving,LLC Blacksmith Ventures,LLC **ORDER OF BIDS FROM LOWEST TO HIGHEST** Vernon,TX Jacksboro,TX Pay Item Description Unit Protect Unit Price Total Unit Price Total Totals 200.1 SITE PREP&MOBILIZATION(NOT TO EXCEED 5%) LS 1 $15,000.00 $15,000.00 $65,000.00 $65,000.00 302-D TYPED HOT MIX ASPHALT TON 2,075 $125.00 $259,375.00 $139.00 $288,425.00 305.1 REMOVE&REPLACE CURB&GUTTER LF 510 $65.00 $33,150.00 $50.00 $25,500.00 305.2 REMOVE&REPLACE VALLEY GUTTER SY 380 $85.00 $32,300.00 $180.00 $68,400.00 402 BASE REPAIR SY 11,900 $60.00 $714,000.00 $73.10 $869,890.00 403-M MILLING SY 11,400 $3.00 $34,200.00 $5.25 $59,850.00 702 REMOVE&REPLACE CURB INLET EA 2 $7,500.00 $15,000.00 $5,000.00 $10,000.00 801 TEMPORARY TRAFFIC CONTROL LS 1 $8,500.00 $8,500.00 $5,000.00 $5,000.00 Total Base Bid $1,111,525.00 Total Base Bid $1,392,065.00 ADDITIVE I ALTERNATE NO.1-ROYAL OAK ST I DARWIN DR Freeman Paving,LLC Blacksmith Ventures,LLC Vernon,TX Jacksboro,TX Pay Item Description Unit Protect Unit Price Total Unit Price Total Totals 302-D-ALT TYPED HOT MIX ASPHALT TON 215 $125.00 $26,875.00 $200.00 $43,000.00 305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 55 $65.00 $3,575.00 $100.00 $5,500.00 305.2-ALT REMOVE&REPLACE VALLEY GUTTER SY 80 $85.00 $6,800.00 $200.00 $16,000.00 402-ALT BASE REPAIR SY 975 $60.00 $58,500.00 $85.00 $82,875.00 403-M-ALT MILLING SY 1,920 $3.00 $5,760.00 $5.25 $10,080.00 804-4YS-ALT 4"YELLOW SOLID STRIPING LF 400 $3.50 $1,400.00 $10.00 $4,000.00 804-18YA-ALT 18"WHITE YIELD ARROW EA 7 $750.00 $5,250.00 $300.00 $2,100.00 Total Add/Alt No.1 $108,160.00 Total Add/Alt No.1 $163,555.00 ADDITIVE/ALTERNATE NO.2-RIVERCREST DR Freeman Paving,LLC Blacksmith Ventures,LLC Vernon,TX Jacksboro,TX Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 302-D-ALT TYPED HOT MIX ASPHALT TON 200 $125.00 $25,000.00 $200.00 $40,000.00 305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 95 $65.00 $6,175.00 $100.00 $9,500.00 305.2-ALT REMOVE&REPLACE VALLEY GUTTER SY 75 $85.00 $6,375.00 $200.00 $15,000.00 402-ALT BASE REPAIR SY 3,260 $60.00 $195,600.00 $85.00 $277,100.00 403-M-ALT MILLING SY 1.800 $3.00 $5.400.00 $6.00 $10,800.00 502.1-R-ALT ADJUST MANHOLE EA 1 $1,500.00 $1,500.00 $1,500.00 $1,500.00 Total Add/Alt No.2 $240,050.00 Total Add I Alt No.2 $353,900.00 ADDITIVE I ALTERNATE NO.3-ALAMO DR Freeman Paving,LLC Blacksmith Ventures,LLC Vernon.TX Jacksboro,TX Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 302-D-ALT TYPED HOT MIX ASPHALT TON 830 $125.00 $103,750.00 $175.00 $145,250.00 305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 35 $65.00 $2,275.00 $100.00 $3,500.00 402-ALT BASE REPAIR SY 2,700 $60.00 $162,000.00 $85.00 $229,500.00 403-M-ALT MILLING SY 4,400 $3.00 $13,200.00 $6.00 $26,400.00 Total Add I Alt No.3 $281,225.00 Total Add/Alt No.3 $404,650.00 ADDITIVE I ALTERNATE NO.4-HOLLANDALE AVE Freeman Paving,LLC Blacksmith Ventures,LLC Vernon,TX Jacksboro,TX Pay Item Description Unit Protect Unit Price Total Unit Price Total Totals 302-D-ALT TYPED HOT MIX ASPHALT TON 1,160 $125.00 $145,000.00 $165.00 $191,400.00 305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 200 $65.00 $13,000.00 $90.00 $18,000.00 305.2-ALT REMOVE&REPLACE VALLEY GUTTER SY 165 $85.00 $14,025.00 $200.00 $33,000.00 305.2-PR-ALT PEDESTRIAN RAMPS EA 10 $1,800.00 $18,000.00 $3,500.0C $35,000.00 305.2-SW-ALT REMOVE&REPLACE 4"CONCRETE SIDEWALK SY 100 $125.00 $12,500.00 $135.00 $13,500.00 402-ALT BASE REPAIR SY 6,200 $60.00 $372,000.00 $80.00 $496,000.00 403-M-ALT MILLING SY 8,600 $3.00 $25,800.00 $5.50 $47,300.00 Total Add/Alt No.4 $600,325.00 Total Add I Alt No.4 $834,200.00 Freeman Paving,LLC Blacksmith Ventures,LLC ADDITIVE/ALTERNATE NO.5-BONNY DR(DRAINAGE IMPROVEMENTS) Vernon,TX Jacksboro,TX Pay Item Description Unit Project Unit Price Total Unit Price Total Totals 305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 100 $65.00 $6,500.00 $50.00 $5,000.00 305.2-ALT REMOVE&REPLACE VALLEY GUTTER SY 100 $85.00 $8,500.00 $200.00 $20,000.00 402-ALT BASE REPAIR SY 500 $60.00 $30,000.00 $180.00 $90,000.00 702-F-ALT REMOVE EXISTING CURB INLETS&INSTALL CONCRETE FLUME LS 1 $10,000.00 $10,000.00 $15,000.00 $15,000.00 Total Add I Alt No.5 $55,000.00 Total Add I Alt No.5 $130,000.00 Base Bld+Add/Ales $2,396,285.00 Base Bid+AddlAlts $3,278,370.00 No.1-5 No.1-5 202 + phhalt Rehabilitation 'r je t A/F23- 100- • WEEKS HxT�I Rd) gE HAM*I* JL� w.....E"_._"_"_ ��p_J warrr�u III �.......� fId ii --1 ,,,,...,.,,,. ;1,, , , , 1146w)SE UM 7 LI 4:J, . ..; . DIMECR - a h9P1A4V ST hj sr., I En ° nIll aP. i I E L''S q n Jk E A Fr Nl1Y L ���a i u p�+, ..WY II �- --" [�, p1 �, I yf 46, NJ) ,. r ,,,-„ ,, .,... ,,, i . _....,, \\,,, 71 ILli,„7: ,..„, i�P HEARD1 ,SOUTHWEST PARK WAY H I LL CH EST n ----7: Z CEWETERY r i ROSEMONT %. CEMETERY 2023 Asphalt Rehabilitation Pr j t CWF23- 100-02 (ADD/ALT) X „ C;T � �_. 'tYTl�,r- .L., I % __ ILLDA' ' , r T p / S.^.l•Ti!WEST P1[YYY i.` 4 c M ^T CANYON Q :} EW I xx yi/ .,..,"2:45' 0,`i'• is I ; /� ,-..g4 ,, -.-- ..-.,. r / , �ti\, �LIC La `" f� ti,L � I r� +; =` .t .4e 1, �, �•:'.•` 2 O _EC \t t� ;.y, f '`' F�i c '`• -0Ga r -et 1 ...1\ ; IBC, RD I I :/'HEn 0L { C%?'..,-."" 91iy _�' ,,,,,_) FHA I ; _ � ' C LJ :, `,ti' FailL ..�. . GLEN0,4L.E DR j •,�„•,•,,,•-• • } ,,_ ,[ •\ i �` ,F11 I I I,i `'NEE �.1 R_ ST V (MELODYLN �i I", h� NI ; '—®' c P,Rimg0S= Wi _ FAIN ELEM �.,•f,�AAAN ST i r — SPARLfS $T • I LENf1ALL I fy' .. .. BURI Ivr '( I ST D MLOOY Ir FIN ELEM�ST Ic iS , up s (1[i 4., ›- W :.'} r �4. EDLEHEHE , ti,, CHR5TU5N zo_i 1-: 122 PFRK S:#ica_ LL Il 4,1E=QUITE ST '.-......N6.7 ""�"ti'FE : .. NCRRtS k,Q SI NOLETOf ,..,,. i---) z .1/ ':, t� DARK ,...11 iI