Loading...
Ord 60-2022 Carry Forward of Capital and Related Funds from FY 2022 to FY 2023 Budget 12/06/2022 Ordinance No. 60-2022 Ordinance amending the FY 2023 Budget in various funds as part of the FY 2022 closing process WHEREAS, the City is currently in the process of closing its financial records for the fiscal year ended September 30, 2022; and, WHEREAS, as part of that process, it is sometimes necessary to carry-forward funds committed and appropriated through City Council action in the prior year for specific projects which did not reach completion as of the fiscal year close to the new year. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: Budget carry-forward adjustments, as indicated on the attached Worksheet and made a part of this ordinance, are hereby approved for FY 2023. PASSED AND APPROVED this the 6th day of December, 2022. „r4, o2 gevki;z1,4 MAYOR ATTEST: -Yik7ct ; B� City Clerk General Fund Fund/Account Amount Memorial Auditorium Security Cameras 1001327-71390 $ 48,450 Health Dept-Auto Operators replacement 1001327-71400 8,975 West Wing Stabilization 1001327-73190 1,512,530 Firefighter Turnout Gear 1004105-70220 65,148 2022 Asphalt Street Rehab Project 1008220-77220 600,538 2022 Concrete Rehab 1008220-77220 881,287 BSNF 7th Street Crossing 1008220-77220 295,881 Total General Fund: $ 3,412,809 Water and Sewer Fund Evaluation of Jasper High Service Pump 5508140-72170 $ 17,786 Kubota ATV/Replacement 5508143-77330 13,659 Pump Variable Frequency Drive (VFD) 5508143-71040 10,844 Blower Motor Rewind (#1) 5508143-71040 25,350 Operations Building Roof Air Conditioning 5508143-71130 17,783 Lake Ringgold Water Rights 5508145-72170 79,943 Lift Station 25 Odor Control Study 5658170-72170 61,339 9th Street EST Design and Consulting 5658170-72170 500,000 Ninth Street EST Level Control and Yard Piping 5658170-77220 572,372 Ninth Street EST Replacement 5658170-77220 4,543,176 2021 Lift Station Project 5658170-77220 107,328 Lift Station 61 Pumps 5658170-77220 74,041 2022 Sewer BUIP Phase I Project 5658170-77220 121,671 2022 Sewer BUIP Phase 2 Project 5658170-77220 1,192,530 2022 Water BUIP 5658170-77220 1,368,022 Water Purification Equipment/Repairs 5658170-77360 367,296 Total Water and Sewer Fund: $ 9,073,140 Sanitation Routeware Implementation 5308175-72170 $ 10,182 2022 Alley Rehab 5308175-77215 355,198 Landfill Entrance Facility Improvements 5308185-77160 76,500 Total Sanitation Fund: $ 441,880 Stormwater Quail Creek Drainage- Phase 1 5528162-77160 $ 149,408 2022 Drainage Maintenance 5528162-77220 689,532 Transfer Station Basin Improvements 5528162-77220 2,226,887 Total Stormwater Fund: $ 3,065,827 Information Technology PC Replacement 6202522-70350 $ 109,482 PSTC Phone Switch Replacement 6202522-77410 22,110 CAD/Mobile/Records 6202522-77410 277,530 Server Replacement 6202522-77410 161,250 Network Assessment Remediation 6202522-77410 167,066 Total Information Technology Fund: $ 737,438 Fleet Vehicles and Equipment 6007250-77320 1,282,812 Fleet Management Study 6007250-72170 94,491 Total Fleet Fund: 1,377,303 Transit Buses (4) (35-ft Heavy Duty) 5207201-77320 $ 1,906,175 Tractor 5207201-77330 154,564 Transportation Facility 5207209-77170 454,148 Bus Shelter Fabrication Materials 5207201-77220 43,632 Total Transit Fund: $ 2,558,519