Res 020-2022 Asphalt Rehab Project to Freeman Paving, LLC 02/15/2022 Resolution No. 20-2021
Resolution authorizing the City Manager to award bid and contract for
the 2022 Asphalt Rehabilitation Project to Freeman Paving, L.L.C. in
the amount of$1,334,392.50
WHEREAS, the City of Wichita Falls has advertised for bids for the 2022 Asphalt
Rehabilitation Project; and,
WHEREAS, it is found that the lowest responsible bidder is Freeman Paving, LLC
who made a unit price bid with an estimated total of $1,334,392.50.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
The unit price bid for the 2022 Asphalt Rehabilitation Project is awarded to
Freeman Paving, L.L.C. in an estimated total amount of $1 ,334,392.50, and the City
Manager is authorized to execute a contract for the City with said Contractor for the
construction of such project.
PASSED AND APPROVED this the 15th day of February, 2022.
14°—
MAYOR
ATTEST:
City Clerk
2D22 Asphalt Rehabilitation Project
C W F22.100.04
Bid Date:February 1,2022
BASE BID Freeman Paving,LLC SPI Asphalt,LLC Blacksmith Ventures,LLC
-ORDER OF BIDS FROM LOWEST TO HIGHEST- Vernon.TX Argyle.TX Jacksboro.TX
Pay Item Description Unit Project Totals Unit Price Total Unit Price Total Unit Price Total
3.010 SITE PREP&MOBILIZATION(NOT TO EXCEED 5%) LS 1 $10,O0O.00 $10.000 DO $30,OD0.00 $30,000.DO $72,574,41 $72,574.41
302-0 TYPE D HOT MIX ASPHALT TON 2.645 5110.00 5790.95D OC 5160.00 5423.20000 513820 5365 539.00
305-1 REMOVE&REPLACE CURB&GUTTER LF 769 $50 00 $38.450.00 588 00 957.672 00 575.50 $58.059.50
3052 REMOVE&REPLACE VALLEY GUTTER SY 1,410 575 CO 5106.753,GC 5110.30 5156.10C.00 5180 DO 5255.6030C
305.2-PR PEDESTRIAN RAMPS EA 10 51400.00 514.00000 54.000.00 040.000.00 51.750.00 $17.500.00
3052-SW REMOVE&REPLACE 4"CONCRETE SIDEWALK SY 35 5150.30 $5250.00 5140.30 $4s00.00 5121 D0 $4.235.0D
402 BASE REPAIR SY 11,986 555.00 5659.250.00 550 00 5599.300.00 552.60 5630.46360
403-M MILLING 53 17.420 57 75 547.905 00 5355 561.841 OC 54.5.5 575.951 23
502.1-R ADJUST MANHOLE EA _ $ 5750.00 56.000.00 5500.00 $4.000.00 $2.500.00 $20.000O0
801 TEMPORARY TRAFFIC CONTROL LS 1 510.002.00 5'0.00002 58.000.0D $8 CO.00 $20.00D.DC 520.000O0
804-4WSP 4"WHITE SOLID PARKING STRIPING LF ' 60 51.75 5105.00 S15 00 5900.00 $2.00 $120.03
804-4Y0 4"YELLOW DASH STRIPING LF 910 51.75 5'592.50 57.37 $6.370.00 $6.00 $5.460.00
804-4Y5 4"YELLOW SOLID STRIPING LF 480 51.75 5840.00 57.30 53.360.00 $7.00 $3.360.00
Total Base Bid $1,190,072.50 Total Base Bid $1.404,643.00 Total Base Bid $1.527,062.71
ADDITIVEIALTERNATE NO.1-RIVERCREST DR Freeman Paving,LLC SPI Asphalt,LLC Blacksmith Ventures,LLC
Vernon.TX Argyle.TX Jacksboro.TX
Pay Item Description Unit Project Urr5 Price Total Unit Price Total Unit Price Total
302-D-ALT TYPED HOT MIX ASPHALT TON 200 5110 00 .$22.000 00 $160 00 $32,000.00 $212.67 $42.534.00
305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 65 550 CO $3.250.00 S°5 0.0 $5.720.00 575 50 $4.907.50
305.2-ALT REMOVE&IREPLACE VALLEY GUTTER SY , 68 575.00 1 $5,1110.00 515500 $10,54000 $180 00 $12,240.00
402-ALT BASE REPAIR SY 554 555 23 035,970.00 550-00 532.70C.00 571 25 $46.597.60
403-M-ALT MILLING SY 050 S2.75 $2.337.50 $3.55 $3.017.50 57.88 $6698.00
502.1-R-ALT ADJUST MANHOLE EA 1 5750.00 5750 30 540050 5400 DO $2.500.00 $2.500.00
Total AddfAlt No.1 569,407.50 Total Add+Alt No.1 584,377.50 Total Add/Alt No.1 S115,477.00
ADDITIVEfALTERNATE NO.2-ROYAL OAK ST!DARWIN DR Freeman Paving.LLC SPI Asphalt,LLC Blacksmith Ventures.LLC
Vernon,TX Argyle.TX Jacksboro.TX
Pay Item Description Unit Project Unit Price Total Unit Price Total Unit Price Total
302-0-ALT TYPED HOT MIX ASPHALT TON 215 $110-00 $23,550-00 $160.03 $34.400.00 $203.67 $43.789.05
305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 55 S50,00 $2 750.00 588 00 54 040.00 $75 50 $4 152.50
3052-ALT REMOVE&REPLACE VALLEY GUTTER SY 80 $7500 $6,000.OD $155.03 512.400.00 5180A0 $1440000
402-ALT BASE REPAIR SY 674 555.00 537.07500 550.00 533.702.O0 57042 047463.08
403-M-ALT MILLING SY 1,912 52.75 55258.00 53.55 $6.787.60 55.49 $10.496.88
804-4Y5-ALT 4"YELLOW SOLID STRIPING LF 400 5175 5730 DO 52.00 53.200.00 52.00 5800.00
804-I8YA-ALT 18'WHITE YIELD ARROW EA 7 $55000 $3.850.00 5200.00 51.400.00 5100.00 $700.00
Total AddIAlt No.2 579,278.00 Total Add/Alt No.2 596,727.60 Total Add/Alt No.2 5121,801.51
ADDITIVE/ALTERNATE NO-3-HOLLAWDALE AVE Freeman Paving,LLC SPI Asphalt,LLC Blacksmith Ventures.LLC
Vernon.TX Argyle.TX Jacksboro,TX
Pay Item Description Unit Project Totals Unit Price Total Unit Price Total Unit Price Total
302.0-ALT TYPED HOT MIX ASPHALT TON 1,160 $11000 3127,600 00 $160.00 3185,600.00 $120.79 5140,116.40
305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 121 550 00 56 350.00 588 00 5'0.64e 00 S75 50 $9 135.50
•
305 2-ALT REMOVE&REPLACE VALLEY GUTTER SY 165 575.00 $12.375.00 5155.00 525.575.00 5180.00 $29.70000
305.2-PR-ALT PEDESTRIAN RAMPS EA 10 51.400.00 5"4.00D.00 54900.00 540.002.00 5'.750.00 S'7SOC.00
305.2SW-ALT REMOVE&REPLACE 4''CONCRETE SIDEWALK SY 35 S150.00 55.250.00 5120.00 54.200.00 $121 00 $4.235.00
402-ALT BASE REPAIR SY 4.655 555.00 5256.025.0C 542.00 5195.510.O0 546.65 5217.155.75
403-M-ALT MILLING SY 8,345 32.75 522.948.75 53.55 $29.624.75 $4.75 $39,638.75
Total AddlAlt No.3 S444.248.75 Total Add7Alt No.3 $491.157.75 Total AddlAlt No,3 5457.481.40
ADDITIVEIALTERNATE NO.4-BONNY DR IAI Freeman Paving,LLC SPI Asphalt.LLC Blacksmith Ventures.LLC
Vernon.TX Argyle.TX Jacksboro,TX
Pay Item Description Unit Project Unit Price Total Unit Price Total Unit Price Total
302.0-ALT TYPE D HOT MIX ASPHALT TON 2,035 $110.00 3223,850.00 $100.00 5203.500.00 $125.75 5255,901.25
305.1-ALT REMOVE&REPLACE CURB&GUTTER LF 103 550.00 55.150.00 S88.00 59.C64.00 575 50 $7 776.50
305.2-ALT REMOVE&REPLACE VALLEY GUTTER SY 110 575.00 58.250.00 $155.00 517.050.00 5180.00 $19.80000
402-ALT BASE REPAIR SY 9.660 555.00 5531.300.00 542 50 54'0.552.02 548 52 5465.703.2C
403-144-ALT MILLING SY 11.300 52.75 031.075.00 53.55 540.115.00 $2.50 $25.250.00
Total AddlAlt No.4 5799,625.00 Total Add/Alt No.4 5580,279.00 Total AddIAlt No.4 5780,430.95
ADDITIVE/ALTERNATE NO.5-BONNY DR(B) Freeman Paving.LLC SPI Asphalt.LLC Blacksmith Ventures,LLC
Vernon,TX Argyle,TX Jacksboro,TX
Pay Item Description Unit Project Unit Price Total Unit Price Total Unit Price Total
402-ALT BASE REPAIR SY 2,524 555.00 5144,320.00 550.00 5131,200.00 546.06 5120,861_44
Total AddlAlt No.5 5144,320.00 Total Add/Alt No.5 5131,200.00 Total Add/Alt No.5 5120,861.44
2022 Asphalt Rehabilitation Project
CWF22- 100-04
Liu=\
r
z
w
7
Q
S
❑
„
N
O
Z
Rc1
�O
0
z
O
z
w
J
ALAMO DR
CASTON LN LEBANON RD
DEHAVEN DR
2022 Asphalt Rehabilitation Project
CWF22- 100-04
ZiNF
POLICE DEPARTMENT PARKING LOT
I
��
L-
ROSEMONT
CEMETERY
ROSEMONT CEMETERY
0
}
Z
z
O
BONNY DR (ADD/ALT)