255.61 - Faith Village, Unit I, Lot 1, Block 6FINAL PLAT
FAITH VILLAGE, UNIT I
LOT 1, BLOCK 6
(A REPLAT OF BLOCK 6, FAITH OLLAGE, UNIT I)
OWNER/DEVELOPER
TIMOTHY D. LEE
4 SANDRA LEE COURT
WICHITA FALLS, TEXAS 76308
(940) 689-2041
DECEMBER 2013
ring m
BEGINNING
SURVEYOR/EAGWEER
CORNERSTONE
ENGINEERING
2406 KELL BOULEVARD
WICHITA FALLS, TEXAS 76309
(940)322-6450
B
LOTS
o:bn� �,�"watiEwT
q
BLOCK
S
y
y
Plat # _17_ Plat Lo
CERTIFICATE OF IMPROVEMENTS Donna
Rick
Addition or Subdivision: Faith Village Unit 1, Lot 1 Block 6 Davis
Russ
x This is a Minor Plat.
This is a Minor Amended Plat.
This Final plat conforms to the preliminary plat approved by P&Z.
This is a Final plat approved by the P&Z on:
Date: 01 /10/2014
aPl nner'
PUBLIC WORKS/ENGINEERING
No street improvements are necessary.
Street improvements are required.
The improvements are complete and accepted and a maintenance bond
for $ has been posted and will expire
A surety bond for $ has been received.
No drainage improvements are necessary.
Drainage improvements are required.
The improvements are complete and accepted and a maintenance bond
for $ has been posted and will expire
A surety bond for $ has been received.
✓ Served by existing public sewer.
Public sewer lines to be constructed.
The lines are installed and accepted and a maintenance bond for
$ has been posted and will expire
A surety bond for $ has been received.
y Served by existing public water.
Public water lines to be constructed.
The lines are installed and accepted and a maintenance bond for
$ has been posted and will expire
A surety bond for $ has been received.
Septic tanks will be constructed.
Approved by Health Dept. on
sq. ft. lots are required.
Date: / / 7/ / 7�
Date:
erector of Public Works
H:IPlamng/FORMSICERTIFICATE OF IMPROVEMENTS_2013
Ab .1ZU/LU1J1PXl M:Uy M UNUUK R LIM NAi, C10. y4U i-1 'y44
t. UUl/UU1
PROVEN
CO.RNERSTONE
ENGINEERIN G,PLLC
2406 Kell Boulevard
Wichita Falls, Texas 76309
Phone: (940) 322-6450 Fax: (940) 723-6006
mlitteken@cornerstoneplic.com
December 20, 2013
Oncor Electric Delivery
AT & T Communications
ATMOS Energy
Time Warner Cable
Subdivision Name: Faith Village, Unit 1
Lot 1, Block 6
Owner/Developer: Timothy D. Lee
The enclosed"plat has been prepared to conform to the subdivision requirements of the
City of Wichita Falls Subdivision Ordinance and will be submitted for approval to the
City Department of Community Development for its approval. The purpose of this letter
provided. If this plat meets with your approval, please sign and date the appropriate
blank below and fax the signed letter to our office. Should you have any questions
about the plat, please do not hesitate to call. Thanks for your cooperation in this matter!
CORNERSTONE ENGINEERING
0
Martin Litteken Jr., R.P.L.S., President
ONCOR LECTRIC DELIVERY
gna e/Date
ATMOS Energy
Signature/Date
WO# 130331-0
r_Vf:3111
Signature/Date
Time Warner Cable
Signature/Date
V1-V2-14;'IV:V4AM;
P
NPROVEN
NERSTONE
G N E E R I N G, P L L C
2406 Kell Boulevard
Wichita Falls, Texas 76309
Phone: (940) 322-6450 Fax� (940) 723-6006
mlitteken@corner.5tonepllc.com
December 20, 2013
Oncor Electric Delivery
AT & T Communications
ATMOS Energy
Time Warner Cable
Subdivision Name: Faith Village Unit 1
Lot 1, Block 6
Owner/Developer: Timothy D. Lee
The enclosed plat has been prepared to conform to the subdivision requirements of the
City of Wichita Falls Subdivision Ordinance and will be submitted for approval to the
City Department of Community Development for its approval. The purpose of this letter
is to request your review to determine if appropriate utility easements have been
provided. If this plat meets with your approval, please sign and date the appropriate
blank below and fax the signed letter to our office. Should you have any questions
about the plat, please do not hesitate to call. Thanks for your cooperation in this matter!
CORNERSTONE ENGINEERING
2
Litteken Jr.. R.P.L.S.. President
ONCOR ELECTRIC DELIVERY
Signature/Date
ATMOS Energy
Signature/Date
WO# 130331-0
AT&T
Signature/Date
Time Warner Cable
Signature/Date
Jan. 1. 1U14 V:14AM Rtmos tnergy Vo.1dol V. L
,PROVEN
CORNERSTONE
ENGINEERING,P�LC
2406 Kell Boulevard
Wichita Falls, Texas 76309
Phone: (940) 322-6450 Fax: (940) 723-6006
mlitieken@comerstonepllc.com
December 20, 2013
Oncor Electric Delivery
AT & T Communications
ATMOS Energy
Time Warner Cable
Subdivision Name: Faith Village, Unit 1
Lot 1, Block 6
Owner/Developer: Timothy D. Lee
The enclosed plat has been prepared to conform to the subdivision requirements of the
City of Wichita Falls Subdivision Ordinance and will be submitted for approval to the
City Department of Community Development for its approval. The purpose of this letter
is to request your review to determine if appropriate utility easements have been
provided. If this plat meets with your approval, please sign and date the appropriate
blank below and fax the signed letter to our office. Should you have any questions
about the plat, please do not hesitate to call. Thanks for your cooperation in this matted
CORNERSTONE ENGINEERING
By:
Martin Litteken Jr., R.P.L.S., President
ONCOR ELECTRIC DELIVERY
Signature/Date
ATMOS Energy
it
gnature/Date
WO# 130331-0
AT&T
Signature/Date
Time Warner Cable
Signature/Date
I2/23/2013 08:24 y408550465 TIME WARNER CABLE
PAGE 01/02
PROVEN
`CORNERSTONE
ENGINEERING
2406 Kell Boulevard
Wichita Falls, Texas 76309
Phone: (940) 322-6450 Fax: (940) 723-6006
mlitteken@cornerstonepllc.com
December 20, 2013
Oncor Electric Delivery
AT & T Communications
ATMOS Energy
Time Warner Cable
Subdivision Name: Faith Village Unit 1
Lot 1, Block 6
Owner/Developer: Timothy D. Lee
The enclosed plat has been prepared to conform to the subdivision requirements of the
City of Wichita Falls Subdivision Ordinance and will be submitted for approval to the
City Department of Community Development for its approval. The purpose of this letter
is to request your review to determine if appropriate utility easements have been
provided. If this plat meets with your approval, please sign and date the appropriate
blank below and fax the signed letter to our office. Should you have any questions
about the plat, please do not hesitate to call. Thanks for your cooperation in this matter
CORNERSTONE ENGINEERING
By:
Martin Litteken Jr., R.P.L.S., President
ONCOR ELECTRIC DELIVERY
Signature/Date
ATMOS Energy
Signature/Date
WO# 130331-0
AT&T
Signature/Date
Time Warner Cable
" I /01-1.2j1L3