Loading...
46.3 - Flood Plain VarianceI FL OD PLAIN VARIANCE e �0 9 20 124.5' (60') - ° 300 165J2L BLOCK 5A ER SOUTH PARK ADDITION 211 301 303 1374'0 90 3 60' le LOSED BY. )RD. NQ 1306 5G 28' 2 - SED ORD. 9 OSED BY D. NO. 366 3 R 3 2 N h O ° O 07 Y Q � 5 7 WIO is W O O ' 31' p S0� � z o _ 50' M 5 ID C' CSEC B1 ORD. NO 1451 8 1457 EXIa TINS l DiLDING n - A)_a1Z_7__- PROPOSED TEXAS. ELECTRIC bkRVICE :O 50' EASEMENT 308 5, 158.5' ORD. NO. 1451 d 1457 ------------- ------------ -CLOSED— N 4-C '� 50' 50� m �i A 1457 F— z W 12 M Y � 50' 50 150 7 5 )9 2-A r" 4UU SWART2 401 407 50' Ln 7 0 50 100 200, t SCALE : I "= 100' I • � o, I I I I 400 FOUNTAIN g 4UU SWART2 401 407 50' Ln 7 0 50 100 200, t SCALE : I "= 100' I • � o, I I I I 400 FOUNTAIN g ED City of Wichita Falls Planning Board P.O. Box 1440 Wichita Falls, Texas 76307 Attn: Gordon Beck Gentlemen: DARR EOUIPMENT CO. P. O. Box 1151 Wichita Falls, Texas 763ui 817 767 4384 November 21, 1980 We are requesting a variation from the Floor Damage Preventive Ordinance in accordance with Section 15z - 36 for the proposed addition to our facility, 1909 Old Jacksboro Hwy „ Wichita Falls,Texas. The Flood Plain Development Permit application was taken out November 11, 1980, a Benchmark established, and the following data then deter- mined: One Hundred Year Floor elevation equals ------ 946.20 Finished Floor elevation for existing building --------- 945.32 We are requesting that a Building Permit be issued permitting the proposed addition to meet the existing finished floor grade of 945.32 instead of 946.20,a variation of 0.88 feet. The request is based on the following: 1. This addition is required to meet the expanded demands on our Service Facility for the maintenance of the equipment being used by the many construction projects in the area, the expand- ed demand from the oil drilling operators, and the land fill operations. (The closest facility for handling this maintenance would be in the Fort Worth - Dallas metroplex.) 2. The split level floor operation would create a Safety Hazard and hamper activities between stalls, use of craneways, shuttling parts, supervision and final inspection. 3. The split level floor would be more costly. It would require additional concrete foundation beams, longer concrete ramps at the overhead door entries and parking curbs. The building structure would have a higher roof height than the existing building to accomodate the clearances required for the operation of our craneways. ®® Dallas • Longview • Texarkana • Waco • Wichita Falls e Pa--e 2 Wichita of Wichita Palls Planning Board A higher roof at the connection between the existing facility and the new addition would then present a " Snow Load" condition requiring additional structural amendments to the existing facility. We would appreciate your favoring our request for deviating 0.88 feet from the Required Building Elevation of 946.20 feet. Cordially yours, DARR EQUIPMENT CO. 9 zt� JIM DUTTON Branch Manager Attached: Plot Plan indicating the existing finished floor grade.