Res 085-2021 2019 Maplewood Project Change Order Wilson Contracting 08/03/2021 Resolution No. 85-2021
Resolution authorizing the City Manager to approve Change Order No.
1 for the 2019 Maplewood Extension from Lawrence to McNiel Project,
for an addition of$102,233.80
WHEREAS, the City of Wichita Falls entered a unit price contract with Wilson
Contracting for the 2019 Maplewood Extension from Lawrence to McNiel Project with the
estimated total cost of$1 ,857,164.00; and,
WHEREAS, the City of Wichita Falls has negotiated Change Order No. 1 for an
addition of$102,233.80 for a final contract amount of$1 ,959,397.80.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
The City Manager is authorized to execute Change Order No. 1 for the 2019
Maplewood Extension from Lawrence to McNiel Project in the amount of$102,233.80.
PASSED AND APPROVED this the 3rd day of August, 2021
MAYOR
ATTEST:
-Mau.,B(
City Clerk
CITY OF WICHITA FALLS,TEXAS CHNGE O54ER NQ 1 &Final
CONTRACT CHANGE ORDER FORM DATE; r'r 7/8/2021
AM6> NT OF CiA�VOI=r' $ 102,233.80
PROJECT/CONTRACT: I 2019 Maplewood Extension from Lawrence to McNiel Project,CWF19-100-12
TO:Wilson Contracting,this Change Order,after approval by the Owner,
(Contractor}
will be your authority to make the following changes in the work under your contract
Decrease : • 'Increase •Total Change-
Description of Changes. in Contract . in Contract in Contract
This change order will modify plan quantities to final in-place quantities.
Item 107-TS.Trench Safety System $ - $ 11.00 $ 11.00
Increasae 11 LF at$1.00 per LF fora final total of 146 LF.
Item 203.3-P,Remove Pavement $ 1,271.70 $ - $ (1,271.70)
Decrease 141.3 SY at$9.00 per SY fora final total of 3661.7 SY.
Item 203.3-C,Remove Concrete Channel $ - $ 715.00 $ 715,00
Increase 55 SY at$13.00 per SY for a final total of 1433 SY.
Item 301,8"Subgrade Stabilization $ - $ 270.00 $ 270.00
Increase 30 SY at$9.00 per SY for a final total of 5190 SY.
Item 301.3-RIP,12"Subgrade Recycle-in-Place $ - $ 1,870.00 $ 1,870.00
Imcrease 85 SY at$22.00 per SY for a final total of 4854 SY.
Item 302-0,Type B HMAC $ 7,420.00 $ - $ (7,420.00)
Decrease 53 TONS at$140.00 per TON for a final total of 0.0 TONS.
Item 302-D,Type D HMAC $ 12,368.00 $ - $ (12,368.00)
Decrease 77.3 TONS at$160.00 per TON for a final total of 22.7 TONS.
Item 303-CC,6"Concrete Channel $ - $ 15,375.00 $ 15,375.00
Increase 205 SY at 575.00 per SY for a final total of 1540 SY.
Item 303-CP,8"Concrete Pavement $ - $ 72,148.00 $ 72,148.00
Increase 1061 SY at$68.00 per SY for a final total of 9215 SY,
Item 305.1,6"Curb and Gutter $ - $ 14,872.00 $ 14,872.00
Increase 743.6 LF at$20.00 per LF for a final total of 843.6 LF.
item 305.1-MC,6"Monolithic Curb $ - $ 2,025.00 $ 2.025.00
Increase 135 LF at$15.00 per LF for a final total of 3158 LF.
Item 305.2-DA,6"Concrete Drive Approach $
$ 1,254.50 $ 1,254.50
Increase 19.3 SY at$65.00 per SY for a final total of 640.3 SY.
Item 305.2-SW,4 Concrete Sidewalk $ 3,700 00 $
Decrease 74 SY at$50.00 per SY fora final total of 2336 SY.
Item 305.2-VG,8"Concrete Valley Gutter $ - $ 4,410.00 $ 4,410.00
Increase 58.8 SY at$75.00 per SY for a final total of 268.8 SY.
Item 403-M,Milting $ 1,720.00 $ - $ (1,720.00)
Decrease 430 SY at$4.00 per SY for a final total of 170 SY.
Item 508.3,Remove and Replace 24"RCP Storm Drain $ - $ 2,310,00 $ 2,310.00
increase 11 LF at$210.00 per LF for a final total of 146 LF.
Item 801.4-4,Install 4'Chainlink Fence $ - $ 990.00 $ 990.00
Increase 33 LF at$30.00 per LF for a final total of 1650 LF.
Item 801.4-4R,Remove 4'Chainlink Fence $ 330.00 $ - $ (330.00)
Decrease 66 LF at$5.00 per LF for a final total of 1256 LE, _
Item 802,Sidewalk Retaining Wall $ - $ 30.00 $ 30.00
Increase 1 LF at$30.00 per LF for a final total of 173 LF.
Item 804-12WS,12"White Solid Striping(100 Mil Thick) $ - $ 346.50 $ 346.50
Increase 66 LF at$5.25 per LF for a final total of 254 LF.
Rem 804-24WS,24"White Solid Striping(Prefab Type"C") $ - $ 841.50 $ 841.50
Increase 51 LF at$16.50 per LF for a final total of 627 LF.
Item 805-SCH40,2"PVC Sch40 Conduit(Trenched) $ - $ 7,470.00 $ 7,470.00
Increase 166 LF at$45.00 per IF for a final total of 2748 LF.
Item 805-SCH80,2"PVC Sch80 Conduit(Bored) $ - $ 6,825,00 $ 6,825.00
Increase 195 LF at$35.00 per LF for a final total of 440 LF.
ADD item 703,Steel Bus Stop Shelter $ 2,720.00 $ - $ (2,720.00)
"Damage to existing shelter
Decrease 1 EA at$2720.00 per EA for a final total of 0 EA.
TOTAL $ 29,529.70 $ 131,763-50 $ 102,233.80
AMOUNT OF ORIGINAL CONTRACT:
$ 1,857,164.00 s
TOTAL AMOUNT OF THIS CHANGE ORDER:
$ 102,233.80 -
TOTAL AMOUNT OF PREVIOUS CHANGE ORDERS` : I$
CONTRACTAMOUNT TO DATE: . '
I$ 1,959,397.80
The completion time under your contract will be extended by(115)days because of this change
order making the completion date May 16,2021,with 55 weather days added.
Approved By Owner: Accepted By Contractor: Recommended By Arch/Eng:
B '' 1 (if applicable)
"/C
Rf
Title:_City Manager Title: ') tl
Titie:_City Engineer
Date: Date: S- C'
7 I Date: 7"/.f--.7/