Res 085-2021 2019 Maplewood Project Change Order Wilson Contracting 08/03/2021 Resolution No. 85-2021 Resolution authorizing the City Manager to approve Change Order No. 1 for the 2019 Maplewood Extension from Lawrence to McNiel Project, for an addition of$102,233.80 WHEREAS, the City of Wichita Falls entered a unit price contract with Wilson Contracting for the 2019 Maplewood Extension from Lawrence to McNiel Project with the estimated total cost of$1 ,857,164.00; and, WHEREAS, the City of Wichita Falls has negotiated Change Order No. 1 for an addition of$102,233.80 for a final contract amount of$1 ,959,397.80. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The City Manager is authorized to execute Change Order No. 1 for the 2019 Maplewood Extension from Lawrence to McNiel Project in the amount of$102,233.80. PASSED AND APPROVED this the 3rd day of August, 2021 MAYOR ATTEST: -Mau.,B( City Clerk CITY OF WICHITA FALLS,TEXAS CHNGE O54ER NQ 1 &Final CONTRACT CHANGE ORDER FORM DATE; r'r 7/8/2021 AM6> NT OF CiA�VOI=r' $ 102,233.80 PROJECT/CONTRACT: I 2019 Maplewood Extension from Lawrence to McNiel Project,CWF19-100-12 TO:Wilson Contracting,this Change Order,after approval by the Owner, (Contractor} will be your authority to make the following changes in the work under your contract Decrease : • 'Increase •Total Change- Description of Changes. in Contract . in Contract in Contract This change order will modify plan quantities to final in-place quantities. Item 107-TS.Trench Safety System $ - $ 11.00 $ 11.00 Increasae 11 LF at$1.00 per LF fora final total of 146 LF. Item 203.3-P,Remove Pavement $ 1,271.70 $ - $ (1,271.70) Decrease 141.3 SY at$9.00 per SY fora final total of 3661.7 SY. Item 203.3-C,Remove Concrete Channel $ - $ 715.00 $ 715,00 Increase 55 SY at$13.00 per SY for a final total of 1433 SY. Item 301,8"Subgrade Stabilization $ - $ 270.00 $ 270.00 Increase 30 SY at$9.00 per SY for a final total of 5190 SY. Item 301.3-RIP,12"Subgrade Recycle-in-Place $ - $ 1,870.00 $ 1,870.00 Imcrease 85 SY at$22.00 per SY for a final total of 4854 SY. Item 302-0,Type B HMAC $ 7,420.00 $ - $ (7,420.00) Decrease 53 TONS at$140.00 per TON for a final total of 0.0 TONS. Item 302-D,Type D HMAC $ 12,368.00 $ - $ (12,368.00) Decrease 77.3 TONS at$160.00 per TON for a final total of 22.7 TONS. Item 303-CC,6"Concrete Channel $ - $ 15,375.00 $ 15,375.00 Increase 205 SY at 575.00 per SY for a final total of 1540 SY. Item 303-CP,8"Concrete Pavement $ - $ 72,148.00 $ 72,148.00 Increase 1061 SY at$68.00 per SY for a final total of 9215 SY, Item 305.1,6"Curb and Gutter $ - $ 14,872.00 $ 14,872.00 Increase 743.6 LF at$20.00 per LF for a final total of 843.6 LF. item 305.1-MC,6"Monolithic Curb $ - $ 2,025.00 $ 2.025.00 Increase 135 LF at$15.00 per LF for a final total of 3158 LF. Item 305.2-DA,6"Concrete Drive Approach $ $ 1,254.50 $ 1,254.50 Increase 19.3 SY at$65.00 per SY for a final total of 640.3 SY. Item 305.2-SW,4 Concrete Sidewalk $ 3,700 00 $ Decrease 74 SY at$50.00 per SY fora final total of 2336 SY. Item 305.2-VG,8"Concrete Valley Gutter $ - $ 4,410.00 $ 4,410.00 Increase 58.8 SY at$75.00 per SY for a final total of 268.8 SY. Item 403-M,Milting $ 1,720.00 $ - $ (1,720.00) Decrease 430 SY at$4.00 per SY for a final total of 170 SY. Item 508.3,Remove and Replace 24"RCP Storm Drain $ - $ 2,310,00 $ 2,310.00 increase 11 LF at$210.00 per LF for a final total of 146 LF. Item 801.4-4,Install 4'Chainlink Fence $ - $ 990.00 $ 990.00 Increase 33 LF at$30.00 per LF for a final total of 1650 LF. Item 801.4-4R,Remove 4'Chainlink Fence $ 330.00 $ - $ (330.00) Decrease 66 LF at$5.00 per LF for a final total of 1256 LE, _ Item 802,Sidewalk Retaining Wall $ - $ 30.00 $ 30.00 Increase 1 LF at$30.00 per LF for a final total of 173 LF. Item 804-12WS,12"White Solid Striping(100 Mil Thick) $ - $ 346.50 $ 346.50 Increase 66 LF at$5.25 per LF for a final total of 254 LF. Rem 804-24WS,24"White Solid Striping(Prefab Type"C") $ - $ 841.50 $ 841.50 Increase 51 LF at$16.50 per LF for a final total of 627 LF. Item 805-SCH40,2"PVC Sch40 Conduit(Trenched) $ - $ 7,470.00 $ 7,470.00 Increase 166 LF at$45.00 per IF for a final total of 2748 LF. Item 805-SCH80,2"PVC Sch80 Conduit(Bored) $ - $ 6,825,00 $ 6,825.00 Increase 195 LF at$35.00 per LF for a final total of 440 LF. ADD item 703,Steel Bus Stop Shelter $ 2,720.00 $ - $ (2,720.00) "Damage to existing shelter Decrease 1 EA at$2720.00 per EA for a final total of 0 EA. TOTAL $ 29,529.70 $ 131,763-50 $ 102,233.80 AMOUNT OF ORIGINAL CONTRACT: $ 1,857,164.00 s TOTAL AMOUNT OF THIS CHANGE ORDER: $ 102,233.80 - TOTAL AMOUNT OF PREVIOUS CHANGE ORDERS` : I$ CONTRACTAMOUNT TO DATE: . ' I$ 1,959,397.80 The completion time under your contract will be extended by(115)days because of this change order making the completion date May 16,2021,with 55 weather days added. Approved By Owner: Accepted By Contractor: Recommended By Arch/Eng: B '' 1 (if applicable) "/C Rf Title:_City Manager Title: ') tl Titie:_City Engineer Date: Date: S- C' 7 I Date: 7"/.f--.7/