Loading...
Res 067-2021 2021 Sewer BUIP Phase I Insituform 06/15/2021 Resolution No. 67-2021 Resolution authorizing the City Manager to award bid and contract for the 2021 Sewer Budget Utility Improvements Project Phase I to Insituform Technologies, LLC in the amount of $188,254.00 WHEREAS, the City of Wichita Falls has requested a Buy Board proposal from Insituform Technologies, Inc. for the 2021 Sewer Budget Utility Improvements Project Phase I; and WHEREAS, it is found that the quote is reasonable and competitive and Insituform Technologies, Inc. is a responsible contractor who made a unit price proposal with an estimated total of$188,254.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price proposal for the 2021 Sewer Budget Utility Improvements Project Phase I is awarded to Insituform Technologies, LLC, in an estimated total amount of $188,254.00, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 15th day of June, 2021 . MAYOR ATTEST: _jriAt/L' B� - City Clerk Insituform emi Tectxieda fes,tic a asuhsltrdasy orAegrco C"-0rooia7an 1103 Postwood dr. Name:Tim Peterie Fax: 940495-0265 Teshnotagies LLC Corinth,TX 7621D Phone:214-317-099d Email:tpeteieeiinsiraferm.ctm An Aegion Company wxw.insitaiform.aurri May 20,2021 ACES#:AAJA-ZGOOCT Mr.Alan Peregrino City of Wichita Falls 1300 7"'St. Wichita Falls,TX 73601 Bubord Proposal Project Name: City of Wichita Falls.TX—2021 BUIP Sewer Rehab Project Location A—D INSITUFORM TECH40LOG1Es,LLC herein proposes to furnish a Proposal for all labor,materials.ecuicrnent,and services necessary to reconstruct the referenced project(as detailed in the project location naps ar.t other information presented by the City of Wichita Falls)utilizing the Local Purchasing Cooperative Contract#635-21, administered through the B_r;Board. ASSUTAPT1ONS AND QUALIFICATIONS We have based this proposal on a nominal wall thickness for the Insitutube as shown in the price. This is based on the best available information at the time of this proposal. Existing pipe deterioration in excess of the conditions assumed,ground water loads in excess of those assumed,or other loads or conditions may increase the recommended thickness for all or portions of the work. Final recommendations may be submitted to you following the completion of the preliminary TV phase of the project. Stated paces are subject to adjustment if design changes are agreed upon_ Laterals. During T:'inspection all side sewers _: = rerifted.using best practical efforts,to determine if each is an active hook up. Normal practice only reinstates-'_we that are active. You may direct us to reinstate all,or specific laterals,as you desire. This proposal, unless ct-e':.,,rse stated,assumes that all laterals will l be reconnected,and all will be internally reconnected using the Insit_i_.::sr"for CIPP and externally for Pipe Bursting. Specific service connections'will not be reconnected only when r. --en directions are received from the Owner_ Water shall be provided at no cost to Insituform Technologies,LLC for all construction phases of this project. The Owner shall furnish Insituform Technologies,LLC with required water meters and pay all associated fees, deposits. and charges. Insituform Technologies.LLC will follow all required backflow prevention and metering procedures. Insituform will supply the City of Wichita Falls 1-year Maintenance. Payment,and Perfomiance Bonds,and Certificate of Insurance following acceptance of this proposal. The pricing in this proposal assumes that all Technical Specifications set forth by the BuyBoard will be strictly adhered to. Any changes to these specifications must be noted and agreed upon by both parties prior to finalizing the proposal pricing. Special: 1, Water shall be provided as noted above. 2. Sod and Post-TV for pipe bursting will be provided by the City of Wichita Falls where necessary. 3, For Location A,a new manhole will not be installed,and the entire line will be rehabilitated with CIPP. 4, For Location C,the franchise utility must be contacted for possible re-route of the bore through the sanitary sewer line during the point repair to be completed. 5. For Location D.a new manhole will not be installed,and the entire line will be rehabilitated with CIPP, 6, Insituform estimates completing this project within 120 days. May 20_2021 Paget PROPOSAL PRICING PAY QTY WM UNIT ESTIMATED ITEM DESCRIPTION PRICE AMOUNT NO. Location A-D(Breakdown provided in attachment) 1 Mobilization-Clean/T)Crew 1 EA $4,500.0D S4,500.00 2 , 3'Clean+TV Sanitary Sewer 965 ', LF $5.0D ', S4,825.00 3 1D'Clean)TV Sanitary Sewer 395 LF $6.00 $2,370.00 4 Root/Grease Removal 6"-12" 397 LF $2.0D $794.00 5 Other Remote Obstruction Removal(max.3 LF) 1 EA $400.0D S400.00 6 Tuberculatian Removal 640 IN-DIALF $2.50 $1:600.00 7 Mobilization-CIPP Crew 1 EA $7,500.0D 37,500.00 8 ' 8'x 6.0mm CIPP 812 LF $35.0D $28,420.00 9 11:1'x 6.0mm CIPP 395 LF $40.00 $15,800.00 10 3'-10"CIPP Setup Charge Per Install Length 1,207 LF $15.00 S18,105.00 11 Intemal Reconnects 1 , EA $275.00 , S275.00 12 3'-10"Post TV Inspection After RehabiIltation 1,207 LF $2.00 S2,414.00 13 Set Up 4"Pump(Per Pump) 7 EA $450.0D 53,150.00 14 , Set Up 4"Piping , 1,360 LF $2.50 , S3,400.00 15 Operate 4"Pumping System(fuel&maint) 7 DAY $150.00 S1.050.00 16 Mobilization-Excavation/PB Crew 1 EA $7,500.00S7.500.00 17 Burst Existing 6'or 8"to 8"IPS SCR 19 r0'-8' 153 LF $65.00 S9.945.00 deep) 16 , 6'-12"Pipeburst Setup Charge Per Install Length , 153 , LF $10.00 , $1,530.00 19 Pipeburst Short Length Add-On(<300 LF) 1.==4 IN-DIA1LF $3.00 $3,672.00 20 8'-12"Point Repair(0'-8'deep) = EA $4,250.00 $8.500.00 21 , External Reconnect(0'-8'deep) _ , Ems. , $1,300.00 , S2,600.00 22 Access Pit(0'-8'deep) = E $2,650.00 $7,850.00 23 Potholing for Nearby Utility Location(0'-8'deep) _ _- $1,000.0D S3.000.00 24 , Trench Safety _. , _F $10.09 , S560.00 25 Granular Backfill :_• TON $62.0D 5744.00 26 Extra I-land Excavation 6 CY $75.0D Se00.00 27 ' Manhole Bench Rebuild 2 , EA $750.00 , S1.500.00 28 Repair/Rehab 2'Asphalt Pavement 14 SY $150.0D S2.100.00 29 Repair/Rehab 8"Flex Base 52 SY $60.00 $3,120.00 30 , Repair/Rehab 8"Concrete Pavement 36 , SY $130.00 , S4,940.00 31 Traffic Control 16 DAY $150.90 S2,400.00 32 Mobilization-MH Rehab Crew 1 EA $3,000.00 S3,000.00 33 , Manhole Rehabilitation-modified polymer 433 SF $30.00 S12,990.00 34 RemovefRepair Wood Fence 40 LF $50.00 S2.000.00 35 Owner's Contingency Allowance 1 AL $15,000.00 S15.000.00 TOTAL ' $1 88,254.00 Note:A Tax-Exempt certificate will need to be provided prior to mobilization. The above pricing is based on award of the full scope of work, Price adjustments may be necessary for a significant scope change. May 20_2021 PaEe 3 PROPOSAL INCLUSIONS The prices stated in this proposal include: 1_ Mobilizations and demobilization. 2. Initial pipeline cleaning to include mechanical cleaning of CI pipe where noted on plans. 3_ Bypass pumping as needed_ 4_ Internal and external service reconnects_ 5_ Pre-Video inspections and documentation of existing pipe prior to reconstruction with the Insituform process for pipe rehabilitated by CIPP. 8_ Final video inspection following completion of the installation to document your new pipe rehabilitated by CIPP_ 7. Insitutube wetout using 400,000 Flexural Modulus Polyester resin, inversion, curing,and finishing. 8_ HOPE Pipe for pipe bursting. 9_ Confined space safe entry practices_ 10_ Manhole rehabilitation with Spectrashield to include surface preparation. 11_ Traffic control_ 12. One-year standard construct on warranty_ 13. One-year Bonds. 14. Certificate of insurance with a standard coverage. PROPOSAL EXCLUSIONS Not included in the prices stated in this estimate are costs associated wi:h the i:en-s Iis:ed below. These items,if needed or found to be applicable,would be provided by INSrnJFORM TECHNOLOGIES.LLC at our additional cost;or would be furnished by others,at your direction. at no cost to INSmJFORM TECHNOLOGIES,LLC: a) If preliminary video inspection of the pipe interior indicates excessive damage, or other extra-ordinary condition.which will require excavation.or other extraordinary remedy,to prepare the pipe for installation of the Insitutube,then those services will be provided by utilizing the optional pricing as approved by the Owner. b) Additional mobilizations and/or setups may apply due to point repairs,obstruction removals,or delays out of our control. c) Manual operation of any pumping and/or metering stations_ d) Sod. e) Post-TV for pipe burst segment only. fj Water from fire hydrants within a convenient distance from each cleaning and inversion site location. g) Legal dumpsite for debris resulting from pipes cleaning. h} if any hazardous or toxic materials are encountered during the project,the Owner will be responsible for the removal and disposal of the materials_ i) Project permits and/or local licenses with be provided by the Owner or Engineer. j: State and local sales and/or use taxes on the value of the project. If you are exempt,please submit the appropriate documentation_ 10 Additional premiums for special insurance coverage's)demanded by you or other parties particular to this project. PROPOSAL TERMS AND CoM molls a) Limits of Liability_ In consideration of INSmIFORM TECHNOLOGIES,LLCs agreement to maintain no less than 55,000.000 of comprehensive general liability insurance in the form required by the Contract, INSrrUFORJ1 TECHNOLOGIES,LLC's liability to the Owner for any matter covered by such insurance will be limited to the extent of such insurance. Neither party shall be liable to the other for consequential damages relating to the contract. In case of conflict between this provision and any other provision in the Contract as ultimately executed.this provision shall govern and prevail_ May 20_2021 Page 4 b) LIMITED WARRANTY. IN LIEU OF ALL OTHER EXPRESSED. IMPLIED AND/OR STATUTORY_ WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE,CONTRACTOR AGREES TO CORRECT ANY DEFECTS IN THE MATERIALS OR SERVICES PROVIDED BY CONTRACTOR WHICH ARE BROUGHT TO THE ATTENTION OF CONTRACTOR WITHIN ONE YEAR FOLLOWING COMPLETION OF CONTRACTOR'S WORK, PROVIDED OWNER AFFORDS CONTRACTOR SUITABLE ACCESS AND WORKING CONDITIONS TO ACCOMPLISH SUCH CORRECTION_ c) MUTUAL RELEASE OF CONSEQUENTIAL DAMAGES. Neither party shall be liable to the other for consequential damages relating to or arising out of the Contract d) PROPOSAL SUBJECT TO NEGOTIATION OF OTHER STANDARD TERMS OF AGREEMENT_ This proposal is subject to agreement of the parties on other terms and conditions as are customary in contracts of this nature. e) Quantities are estimated. Unit prices apply for actual invoice and payment. f I Payments are due at net within thirty days of invoice. Final payment is due within thirty days of completion of protect. g) Monthly progress payments may be requested for the value of work in progress or completed, including materials secured and on site. h) Prices stated are in effect for thirty days from the date of this proposal. The acceptance period, may be extended at the sole option of INSfUFORl41 TECHNOLOGIES,LLC. i) Conflicts. In case of conflict between the provision of the aforesaid paragraphs and any other provision in the Contract as ultimately executed the provisions as set forth above shall govern and prevail. OFFERED BY: ACCEPTED BY: I NSMJFORM TECHNOLOGIES,LLC } Okra t R. Petezee SENATURE DATE TIMOTHY R.PETERIE MANE BUSINESS DEVELOPMENT MANAGER REVIEWED BY: TITLE ANDY OZMENT AREA MANAGER ORGAIMZATIDN cr.. Ella 7e Boswell,PR(COWF) 3er F,u.r�l.ins 2021 SEWER BUDGET UTILITY IMPROVEMENT PROJECT - PHASE I • E E I� SCALE 1'-50 SOLE 1--50EV AVENUE I [o) GEORGE STREET w J E E -LTE -11 E • E TE '[ SCALE 1 =_u. SCALE 1 =5tlt+ LAWRENCE ROAD SEYMOUR HIGHWAY MEET, OF