Res 040-2021 Jasper Water Plant CO2 Tank Replacement 04/20/2021 Resolution No. 40-2021
Resolution authorizing the replacement of a 60,000 pound,
pressurized, Carbon Dioxide tank at the Jasper Water Treatment Plant,
by Green and Sustainable Services, LLC, in the amount of$274,240.00
WHEREAS, one of the City of Wichita Falls' Strategic Goals is to Provide Adequate
Infrastructure; and,
WHEREAS, the City desires to continue to have a reliable treatment system to
produce drinking water; and,
WHEREAS, the City desires to produce a stable form of drinking water for its
citizens and industry; and,
WHEREAS, it is in the best interest of the City of Wichita Falls to sole-source the
purchase of the tank replacement from Green and Sustainable Service LLC.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF WICHITA FALLS, TEXAS, THAT:
City staff is authorized to execute all documents necessary to purchase the tank
replacement at Jasper Water Treatment Plant from Green and Sustainable Services,
LLC., in the amount of$274,240.00.
PASSED AND APPROVED this the 20th day of April, 2021.
MAYOR
ATTEST:
��ilcci&Gni/ll;
City Clerk
Sri'■. Green and Sustainable Services,LLB'..6
Quote
2421 Amyx Ranch Drive
'f 1 Ponder,Texas 762594032 Date Qucite=
GSS
Phone= (W4)597-3723 info:f�ors-conr 31d2021 ELF-101
Fax= (9 0)479-20D9 w grose:-v.conr
Name 1 Address
City.of Wichita Falls
Mark Southard
(940)691-1153
mark-souLard4onrwrbit5tx.gov
Rep Project
Description Qty 11st Total
Bu5'Board motion for City of Wichita Falls-Water Treatment I 0.00
Equipment Project Name.HSi-30 Ion CO2 Skid System
Design Basis:CO2 Service.7501bs lir MAX.24 hour duration MAX,180
psi send-out pressure.Stainless Plumbing(on tank).Stainless Plumbing(on
pressure manifold):480V.AC 3ph 60hz
Chart Industries HSi-30.Ton.CO2 Skid System 239,240.0D
Freight(Shipping and Hamming Cost) 8;125.00
Chart Industries Installation 22,500.00
Chart Industries Professional Services-PE Stamped Anchorage 4,375.00
Calculations
Please note the Bu Board Fee is included in the Total HSi-30 Ion C 02
Skid System Quotation Price. Not included:Applicable Sales Tax or
Duties.Permitting,Civil Engineering or Construction.Mechanical or
Electrical Installation.
Please note that Chart Industries is responsible to insure that the HSi-30
Ton CO2 Skid System meets and or er:c ids all required government and
i-irh,ctry certifications:specification sal pero_it requirements(Green and
Sustainable Services assumes no liabili�v for sv:ern.all Liability falls upon
Me manufacturer Chart Industries).
Should the City of Wichita Falls initaLv lac:de to scot:a forward with the
project and Later far any reason decide to c 3hca1.Than:he City of Wichita
Fans is responsible to pay:1,da=:ore bsufdrel perceci:fcr::ehrs that are
not allowed io be returned io the uua'inf3cturrer sad 3 fa a(f percent)
administrative fee and any associated resteckin5_fee on rears allowed to be
resumed to the manufacturer.
Please coact Thomas Smith at(940)597-3723 or tsmithfa.,gnrserc.com if you have any
questions- Total $.7 74.240.00