Landmark Commission Minutes - 08/25/2020MINUTES
LANDMARK COMMISSION
August 25, 2020
MEMBERS PRESENT:
Michele Derr
■ Chairperson
John Dickinson
■ Member
Christy Graham
■ Vice -Chairperson
Joel Hartmangruber
■ Member
Andy Lee
A Member
Nadine McKown
■ Member
Janel Ponder Smith
■ Member
Tim Brewer
■ Council Liaison
Terry Floyd, Development Services Director
■ City Staff
Amy Gardner, Legal
■ City staff
Karen Gagne, Planning Administrator
■ City Staff
Christal Ashcraft, Development Services Asst.
■ City staff
MEMBERS ABSENT:
Blake Haney
■ P&Z Liaison
Marcela Trice
■ Member
Guests:
Devin & Lindsey Taber, Applicants
1600 Tilden Street
Michael Llndhurst, Insurance Adjuster Consultant, Via Telephone
1600 Tilden Street
Jerald & Rowena Jackson, Wichita Theatre
919 Indiana Avenue
Steve Dietrichs, Downtown Property Owner
927 Indiana Avenue
Jared Canter, Pella Windows & Doors
Grapevine, Texas
Shana Bjorg, Pella Windows & Doors
Grapevine, Texas
Matt English, Architect, Harper Perkins Architects
909 10" Street
Call to Order, Welcome and Introductions
Chairperson Michele Derr called the meeting to order at 12-03 p.m. Ms. Derr had
Commission members, staff and guests introduce themselves. Chairperson Derr had a
procedural item and stated Open Meetings Act and Public Information Act courses needed
to be completed by Labor Day. Ms. Amy Gardner stated agenda item VII1, New Business
would be removed.
II. Review & Approval of Minutes from June 23, 2020 & Special Meeting August 5,2020
Chairperson Michele Derr called for review and approval of the June 23, 2020 and August
5, 2020 Landmark Commission meeting minutes. Vice -Chair, Ms. Christy Graham made a
motion to approve the minutes, Ms. Janel Ponder -Smith seconded the motion. Minutes
were unanimously approved.
Landmark Commission 2 August 25, 2020
III. Action Item: Design Review - 1600 Tilden (West Floral Heights Historic District)
• Roofing Repair and/or Replacement: Seeking determination regarding most
appropriate treatment to address damage to original ludowici clay tile roof, circa 1922.
Ms. Karen Gagne presented the case and stated staff received an application from Mr. &
Mrs. Taber with concerns about the tile roof of their home at 1600 Tilden. The residential
home is a large contributing structure with a tile roof constructed in 1922. The structure
has a complex roof, which is believed to be the original the that had been previously painted
at an unknown time. The home is unchanged since 2005, when the district was created.
One of the key features of the home is the large, tiled roof that sustained storm damage in
late 2018. Previous owners in years past, had attempted to repair sections of the roof,
however, the patch work and smaller size tiles have only added to the degradation. Ms.
Ms. Gagne stated the roof was not damaged in just a few sections, but the entire roof had
sustained damage and broken tiles from storms, lack of proper maintenance, water damage
and what would be expected from a roof that was constructed 98 years ago.
The current home owners contacted their home insurance provider in early 2019 regarding
damage from a storm in December 2018 and have maintained communication. Mr. and
Mrs. Taber are requesting to replace the entire roof in an effort to ensure the retention and
preservation of historic style, architecture and character of the structure.
Staff introduced Mr. Taber to the Commission for his statement and any comments. Mr.
Taber stated there was significant damage sustained from a broken tree branch landing on
the roof in December 2018. Mr. Taber is in negotiations with his insurance company to
have the roof replaced in its entirety. The insurance company has agreed to repair the roof
in sections, however, being that this roof was constructed in 1922, the tiles were handmade.
The tile company is still in business today and provides a 75-year material guarantee on
their product. However, tiles that are mass produced today are smaller and would not
interlock with the existing tiles on the roof, which would only allow for water and other
elements to damage the structure further. The tiles could be replaced with handmade tiles,
at an exorbitant cost to the homeowners. Mr. Taber advised he has contacted Mr. Michael
Lindhurst, an Insurance Adjuster Consultant, to mediate between the insurance company
and himself.
Chairperson Derr asked what Mr. Taber's insurance consultant had suggested. Mr.
Lindhurst spoke to the Commission via teleconference and stated he agreed with Mr. Taber
and staff that the best course of action would be to replace the entire roof with new, mass
produced tile that would all match and retain form, fit and color of original tile. Mr. Lindhurst
stated he is requesting on Mr. Taber's behalf that the Commission recommend replacing
the existing roof in its entirety. Ms. Janel Ponder -Smith asked Mr. Lindhurst if it was normal
for insurance companies to not replace an entire roof when damaged on a historical home,
that it did not seem feasible. Mr. Lindhurst stated it really depended on the grey areas of
the individual's insurance policy, however, Mr. Taber's policy did state repairs could be
made but that it would not be cost efficient or practical. Mr. Lindhurst stated the contractor
would not issue any kind of warranty for any repairs on this roof, only for a replacement.
Ms. Graham asked Mr. Taber if his request was to replace the roof with handmade tiles or
the smaller reproductions that are mass produced. Mr. Taber advised the mass produced
Landmark Commission 3 August 25, 2020
tiles were the most economical choice. Ms. Graham made a motion to approve the design
review application with the Ludowici clay tiles for the replacement of the entire roof with
new, unpainted the at 1600 Tilden Avenue. Ms. Janel Ponder -Smith seconded the motion.
Motion passed unanimously.
IV. Action Item: Design Review — 909 10th Street, First United Methodist Church (FUMC)
Wichita Falls Landmark #4 (Recorded Texas Historic Landmark - 1983)
"Texas Historical Commission Approval on 08/12/2020
• Phase I — Reroofing Project
• Phase II Restoration Project
o Cleaning Exterior Masonry Facades
o Remove/Replace Deteriorated Window Sealants on Masonry Openings — All Facades
& Bell Tower
o Repaint All Bell Tower Windows — Matching Existing Color
o Clean/Prep All Joints At Copings; Install New Coping Sealant on Flat Horizontal Joints;
All Others Repointed with Cementitious Mortar
a RakinglRepointing Mortar Joints (Select Locations)
o Repair Damaged Coping Stones with Edison Coatings System 45
o Limestone Repair Material
o Remove/Replace Joint Sealants at Entrance Granite Steps Matching Masonry Color
Ms. Karen Gagne stated the subject property is a Wichita Falls landmark as well as a
Recorded Texas Historic Landmark (RTHL), located at the intersection of 10th Street and
Travis. The church is a very important landmark to the city, a model of gothic revival
architecture built in 1928 and has remained essentially unchanged since its designation in
1984. The church came before the Landmark Commission a few years ago to incorporate
updates to the west courtyard area.
Ms. Gagne stated the deterioration was visible in person and in the photos from the east
fapade on brick and stonework from environmental elements and aging. It is noticeable that
the copper downspouts stop around the stonework detail midway up the wall. This is partly
due to previous theft of copper. To avoid the costly replacement cycle they stopped about
8-10 ft. above ground, therefore, resulting in water damage to the exterior masonry over
many years. Ms. Gagne stated this request is a long term maintenance and restoration
project versus replacement. The caulking is where the replacements will be made.
Matt English, architect at Harper Perkins Architects, on behalf of FUMC contacted staff
during the "shelter in place" time, which allowed staff to go onsite to record and photograph
the areas of concern. During this time staff reached out to the Texas Historical Commission
for approval and received an official approval from THC on August 12t', 2020. Ms. Gagne
stated there is damage to the limestone fagade as well as the roof, which is approximately
20 years old.
Staff introduced Mr. Matt English, architect for the project, for any additional information or
questions from the Commission. There were no questions from the Commission. Mr. Andy
Lee made a motion to approve the design review application which included all items
previously approved by THC. Ms, Nadine McKown seconded. The motion passed
unanimously.
Landmark Commission 4 August 25, 2020
V. Action Item: Design Review — Request Letter of Support — Research & Potential
Investigation for an Indiana Avenue National Register District & Historic Sites inventory
Overview & Proposal
Ms. Gagne stated the best person to present the proposal was Landmark Commission
member, Mr. Andy Lee, owner, Andy Lee Company. Mr. Lee stated he was seeking
support for a letter to consider research & potential investigation to pursue the formation of
an Indiana Avenue Historic District and National Register application with THC and the
National Park Service. Mr. Lee advised he would be submitting a proposal to the TIF #4
board in the future to assist with matching both private funding sources combined with a
THC - CLG grant application. THC requires a 50% match. Funds would be required and
utilized for the cost of researching and creating the historic district to support Post Oak
Preservation consultant's proposal for $18,500 to complete the survey and the National
Register/Texas Historical Commission (THC) application requirements.
The City of Wichita Falls is recognized by THC as a Certified Local Government (CLG)
based on its historic preservation program and therefore eligible to apply for annual CLG
grants. The City's received CLG grants in the past for various preservation projects. Mr.
Lee outlined the proposed historic district would be consistent with the City of Wichita Falls
Strategic Goals and Policies adopted March 25, 2019: redevelop downtown — create a
Downtown Plan; establish and leverage public private partnerships; and promote downtown
as a destination. The formation of a National Register Historic District on Indiana Avenue
will help achieve these goals.
Mr. Lee stated the Texas Historical Commission has recommended the Indiana historic
district and requires the historical resource survey of the area and future survey of the
downtown area. Mr. Lee continued to outline initial research details to the Commission,
including the proposed area which would focus on the 900 block of Ohio and 900 block of
Indiana with some key properties in the 1000 block of Indiana.
The development team has already begun working with numerous property owners along
Indiana, including work in 2019 with owners of the Bailey-Moline-Filgo Building which
applied and received National Register designation which would be a property within the
proposed district boundary. In addition, Ardent Urban Development Inc., owner, Steve
Dietrichs paid $7,500 to Post Oak Preservation for the historical surveys and National
Register applications for 3 buildings on Indiana which included The Wichita Theatre, recent
National Register recipient with renovation plans in the next few years. Creation of the
national register district can assist in the process for owners to obtain historic tax credits
during a building renovation/rehabilitation project.
Chairperson Derr asked if the Commission had any questions or comments. Vice -
Chairperson, Christy Graham stated she agreed with Mr. Lee's proposal and believed the
Indiana Historic District was needed. Ms. Graham made the motion to write a letter of
support from the Landmark Commission. Ms. Janel Ponder -Smith asked Mr. Lee if all
property owners were in agreement. Mr. Lee indicated most were in agreement; only a
couple remained undecided. Ms. Ponder -Smith stated she did not know if the Commission
should support this if the property owners did not. Mr. Lee stated 90% did agree. Motion
reiterated: Ms. Graham motioned to have staff write a letter of support from the Landmark
Landmark Commission 5 August 25, 2020
Commission for investigating potential development of an Indiana Ave Historic District. Mr.
John Dickinson seconded motion. The motion passed unanimously.
VI. Presentation from Pella Windows & Doors: Window Options for Historic Renovations
A presentation was given by Ms. Shana Bjorg, Contractor Development Manager, and
Jared Canter, Trade Sales Manager, with Pella Windows and Doors. Samples were
displayed and product information distributed to the Commission. Many options were
provided as replacements on historic homes/structures that had previously been approved
by preservation districts in other cities.
VII. Other Business:
a) Monthly Reports
Depot Square:
Ms. Derr gave updates:
• Farmers Market - Open Tuesdays, Thursdays & Saturdays
• Sept. 121h - Indiana Block Party, 1 p.m. - Midnight, corner of 811, & Indiana
• Sept. 1911 - 91h St Studio, Juried Art Exhibit, Memento: Art That Reminds Us, 7-10 p.m.
• Sept. 3111 - Kemp Center - Late Thursdays, 5-8 p.m.
• Circle Trail - Has app for download on smart devices
West Floral Heights:
Ms. Ponder -Smith stated there were no updates.
Ms. Gagne stated there was a contact change for the West Floral Heights
Neighborhood Association President - Mr. Nick Delgadillo.
b) Updates:
612 7t' Street - Underground BBQ
Ms. Gagne advised this property previously had rotating tenants and the new tenant
had installed a sign on the front fapade of the property without a permit. The owner
met with staff for Landmark requirements and stated the sign company made a
mistake on the current sign and it would be replaced by a larger version. Staff asked
the owner to notify them once the sign was received so that a review could be
requested from the Landmark Commission to determine method of attachment to the
masonry, etc.
713 Indiana Avenue
Ms. Gagne stated there had been sidewalk repairs made to the property where the
structure has been slated for demolition, however, those repairs did not meet
standards. Further reviews in the future.
1512 Tilden
Staff advised the Commission that the property owner had stated last month he was
installing a temporary electric pole and would need to have it inspected. As of the
time of the meeting, no calls had been received for an inspection at the property.
c) Sec. 106: Invitation to Consult: HUD Development of Statewide Programmatic
Agreement
Ms. Gagne stated HUD would like to remove routine activities from the federal Sec.
106 review process and indicated staff would provide a response to the POC at HUD.
Landmark Commission 6 August 25, 2020
d) CLG 2021 Grants: Letter of Intent Due September 301h 2020
Staff advised the current budget year had no matching or above current funds to
offset the required match for a CLG grant application. In addition, in order to inform
THC of interest in a FY2021 grant, the city manager would have to approve and
council authorize applying for such funds with match funds already pre -determined.
Related to Mr. Lee's item regarding a potential Indiana Ave. National Register of
Historic Places district, funding assistance to defray application/research costs would
need to be from private funds, foundations or other matching fund programs,
potentially from the downtown TIF zone. However, the TIF #4 increment funds may
be dedicated to other downtown improvement initiatives outlined in the Downtown
Strategic Plan. Staff suggested with limited financial resources utilizing 2021 as a
development year to put together a detailed plan for a FY2022 CLG grant.
e) Window Rehabilitation Workshop — Hull Millworks:
Due to COVID and inability to have groups over 10 persons this has been canceled
with a reschedule date to be determined.
f) Design Review — Staff Authorized — Minor Alteration/Repairs
• 3010 1011 Street (West Floral Heights) — replacement roofing
• 1409 Grant (West Floral Heights) — plumbing permit/foundation inspection & replacement
roofing
• 1415 Buchanan (West Floral Heights) — replacement roofing
• 1404 Hayes (West Floral Heights) — replacement roofing
• 1405 Hayes (West Floral Heights) — replacement roofing
• 1305 Grant (West Floral Heights) — replacement roofing
• 1500 Hayes (West Floral Heights) — replacement roofing
• 1 Crestway (Morningside) — sewer line repair — CWF Landmark
• 2812 9'h Street (Morningside) — new HVAC system — information only
• 108 Pembroke (Morningside) — mechanical permit — information only
• 109 Pembroke (Morningside) — replacement roofing — information only
g) Articles & Periodicals/THC Items:
• Preservation News (National Trust)
Vlll. Adjourn
Next regularly scheduled meeting September 22, 2020 at 12 p.m.
Meeting adjourned at 2:05 p.m.
L�b
�i C �.
Michele Derr, Chairperson
Date