Res 065-2020 2020 Alley Rehabilitation Project to Freeman Paving, LLC 7/7/2020Resolution No. 65-2020 Resolution authorizing the City Manager to award bid and contract for the 2020 Alley Rehabilitation Project to Freeman Paving, L.L.C. in the amount of $ 274,455.00 WHEREAS, the City of Wichita Falls has advertised for bids for the 2020 Alley Rehabilitation Project; and, WHEREAS, it is found that the lowest responsible bidder is Freeman Paving, LLC who made a unit price bid with an estimated total of $274,455.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the 2020 Alley Rehabilitation Project is awarded to Freeman Paving, L.L.C., in an estimated total amount of $274,455.00, and the City Manager is authorized to execute a contract, in a form approved by the City Attorney, for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 7t" day of July, 2020. ATTEST: �B City Clerk 2 0.2 0 AlleY Rehabilitation Project, CRtF'20-530-05 Bid Tab Freeman Paring LLC: Estimated Quantities Pay Item DesrAption unit ProjectTotals Unit Price Total Cost 107-TS Trench Safety System LF 832 $ 2.00 $ 1,664.00 200.1 Site Preparation & Mobilization LS 1 $ 10.000.00 $ 10.0410.00 203.3-P Remove Existing- Pavement SY 2.907 $ 12.00 $ 33.61S,.00 301.2 6" Soil Stabilization SY 2.421 $ 15.00 $ 36.3 _ �.00 303.6 Install 6" Reinforced Concrete Alley SY 1.764 $ 52.00 $ 91.71'°.00 305.2-AP Install 6" Reinforced Concrete Alley Approach SY 480 $ 52.04 $ 24.: 61'.C1O 305.2-PED Install Pedestrian Ramp EA 3 $ 1.800.00 $ 5.400.00 402 Pavement Repair SY 16 $ 100.00 $ 1.,i0i].00 541.17-6 Install 6" SDR'6?_VC Sanitary Sewer Pipe LF 4%? $ 52.00 $ '=.SO=.00 501.17-8 Install 8" SDR'6PVC Sanitan Sewer Pipe LT is5 $ 60.00 $ '1.3-0?.00 5011-NI H-RR Remove & Replace 4' Dia Sanitary Sewer -Manhole EA 2 $ 650,11.00 $ 13,000.00 801 Temporary Barricading And Traffic Control LS 1 $ 10.000.00 $ 10.000.00 Base Bid Total $ 2'4,455.00 2020 Alley Rehabilitation Project, CT'L'F20-530-05 Bid Talc Freeman Faring LLC: Estimated Quantities - Acl&Alt Pay Item Description Unit ProjectTotals Unit Price Total Cost 203.3-P-ALT' Remove Existing Pavement SY 324 $ 12.00 $ 3,888.00 301.2-ALT 6" Soil Stabilization SY 378 $ 15.00 $ 5.670.00 303.6-ALT Install 6" Reinforced Concrete Alley SY 2711 $ 52.00 $ 14,092.00 305.2-AP-ALT Install 6" Reinforced C oncrete Alley Approach SY 80 $ 52.D0 $ 4,.160.00 305.2-PED-ALT lInstall Pedestrian Ramp EA I 2 $ 1,800.04 $ 3,600.00 402-ALT IPavement Repair I SY I 18 $ 100-001 $ 1,8010.00 Add/Alt Bid Total $ 33,210.00 Total Base + Add/Alt Bid $ 307,665.00 ELffmini Alllk. T I L I _F _F _F T —1 1 -7-1 r 7 J­s F —L. -L. J ._L___L _j L COLLINE L 2T I I � I I I I T___r__7,1 I I I I I 6 I r— --- I I I imao-. � ti4QY �I iax� Iao-':I I I I II J L 1 L �L.J_-J I I I I I I I I I I I I I L-1 L- 1 ..-L l _j i I I I y L_ 1- 7- --r ',n F laaFI I jWl pal M F! F LOCATION MAPS d 1i 49u: < 4W0 1 ........ L _2L.- I. 4�4:: NC 2RISS RD MD9 L 1!12 Ad Z.i I _j 17) EDGEMERE PARK 4K%3 t2 1,975 4-04 4 Yo DtAl nn.? 4606 HANOVER I�R Ttk j 48" 1-5513 In,1556 MESQUITE Si. 1 EFa7 1913 2002 1914- 2_ CC 2CC6 2005 ly f 2002 2C(Ai 2013' 2CC8 2012 21:111 2014 2 2C1 2015