Res 044-2020 Change Order 1 2019 Sewer BUIP Phase 1 5/5/2020Resolution No. 44-2020 Resolution authorizing the City Manager to approve change order No. 1 for the 2019 Sewer Budget Utility Project, Phase 1, an increase of $58,445.50 WHEREAS, the City of Wichita Falls entered into a contract with Insituform Technologies, LLC, with the estimated total of $253,949.50-1 and WHEREAS, the City of Wichita Falls has tabulated the final quantities for Change Order No. 1 for an increase of $58,445.50 for a final contract amount of $312,395.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The City Manager is authorized to execute Change Order No. 1 for the 2019 Sewer Budget Utility Project Phase 1 in the amount of an increase of $58,445.50, PASSED AND APPROVED this the 5tn day of May, 2020. MAYO R ATTEST: ity Clerk CITY OF WICHITA FALLS, TEXAS 1 ' .. -. . 1 CONTRACT CHANGE ORDER FORM I k 4/13/2020 . 58,445.50 00. 2019 Sewer Bud et Utility Improvements Project Phase 1, CWF19-550-08 TO: Insituform Technologizes, LLC, this Change Order, after approval by the Owner, will be your (Contractor) authority to make the fallamring changes fn the work under your cordra&.. Q s 1. Bid Item Loop 11, 1.2, 8" Clean and TV Sonflary Sewer $ 860.00 $ - $ (860.00) Decrease 172 LF @ $6.0D1LF for a revised total of 0 LF 2. Bid Item Loop 11, 1.3, 10" Clean and TV Sanitary Sewer $ - $ 860.00 $ 860.00 Increase 172 LF @ $5.00/1.1' for a revised total of 1043 LF 3. Bid Item Loop 11,1,5, 8" x s,omm CIPP $ 5,160,00 $ - $ (5,160.00) Decrease 172 LF @ $30.001LF for a revised total of 0 LF 4. Bid Item Loop 11, 1.8, 10" x 6.Omm CIPP $ - $ 5,848.00 $ 5,848.00 Increase 172 LF @ $34.0011-F for a revised total of 1043 LF 5. Bid Item Loop 11, 1.0, Setup 4" Pump $ 150.00 $ - $ (150.00) Decrease 1 FA @ $160.00/EA for a revised total of 2 EA 6. Bid Item Loop 11, 1.11, Operate 4" Pumping System $ 150.00 $ - $ (150.00) Decrease 1 DAY @ $150.OWDAY for a revised total of 2 DAYS 7. Increasso Bid Item Loop 11, 1.12, 6"-1D" Point Repair ((y-V Deep) $ - $ 21,750.00 $ 21,750.00 Increase 7.5 FA @ $2,900.00/EA for a total of 8.6 EA S. Bid Item Loop 11. 1.14. Trench Safety $ - $ 375.00 $ 375.00 Increase 75 LF @ $5.OD&F for a. total of 85 LF 9, Bid Item Loop 11, 1.16 Manhole Rehabilitation - Modified Polymer $ 779.00 $ - $ (779.00) Decrease 41 SF @ $19.00/SF for a revised total of 389.36 SF 10. ADD New Bid Item Loop 11, 1.18, Inlemal Re=nects $ - $ 400.00 $ 400.00 Add 2 EA @ 5200.001FA for a total of 2 FA 11, ADD New Bid Item Loop 11, 1.19, Tuberculat on Removal $ - $ 2,962.50 $ 2,962.50 Add 790 INIDIA/LF @ $3.7511141DIAILF for a total of 790 INIDUVLF 12. ADD Now Bid Item Loop 11, 1.20, Remove and Reinstall Rip Rap $ $ 3,460.00 $ 3,450-00 Add i LS @ $3460.00lLS for a total of 1 LS 13, ADD New BId Item Loop 11, 1.21, Light Clearing, Grubbing, Haul Off $ - $ 2,325.00 $ 2,325.00 Add 1 LS @ S2325.00/LS for a total of 1 LS 14. ADD New Bid Item Loop 11, 1.22, Sidewalk Repair $ - $ 1,600.00 $ 1,500-00 Add 50 SF @ $30.001SF for a total of 50 SF 15, ADD New Bid Item Loop 11, 1.23, Repair/Rehuitd Manhole Cone Sec. $ $ 1.575.00 $ 1,575.00 Add 1 EA @ $1575.00fEA fora total of 1 EA 16. Bid item E Ingham, 2.2. S Clean and TV Sanitary Sewer $ $ 3.140.00 $ 3.140.00 Increase 628 LF @ $5.0011.1' for a revised total of 754 LF 17. Bid Item Ellingham, 2.3, 8' Clean and TV Sanitary Sewer $ 3.140.00 $ - $ (3,140,00) Decrease 628 LF @ $5.00/LF for a revised total of 0 LF 16. Bid Item Ellingham, 2.4, Other Remote Obstruction Removal $ - $ 350.00 $ 350.00 Increase 1 EA @ $350.00/EA for a revised total of 3 FA 19. Bid item Ellingham, 2.6, 6' x 4.5mm CIPP $ - $ 21,980.00 $ 21.980.00 Increase 628 LF @ $35,00/1.1' for a revised total of 754 LF 20. Bid Item Ellingham, 2.7, 8' x Gmm CIPP $ 18,840,00 $ - $ - (18,840.00) Decrease 628 LF @ $W.001LF for a revised total of 0 LF 21, Bid Item Ellingham, 2.10, Internal Reconnects $ - $ 1,600.00 $ 1,600.00 Increase 8 EA Q $200.00/FA for a revised total of 26 EA 22. Bid Item Ellingham, 2.17, 4" Open Cut Replacement (W-V deep) $ - $ 3,200.00 $ 3,200.00 Increase 16 LF @ $200.001LF for a revised total of 96 LF 23. Bid Item Ellingham, 2.20, Traffic Control $ 300.00 $ - $ (300,00) Decrease 2 Days @ $1501Day for a revised total of 6 Days 24, Bid Item Ellingham. 2.2f, Trench Safely $ - $ 380.00 $ 380.00 Increase 76 LF @ $5.0011F for a revised total of 106 LF 25. Bid Item Ellingham, 2.22, Repair/Rehab Wooden Fens $ - $ 1,600.00 $ 1,600.00 Increase 40 LF @ $40.00/1-F for a revised total of 60 LF 28. Bid Item Ellingham, 2.24, Manhole Rehabifitatioa - Modified Polymer $ - $ 114.00 $ - 114.00 Increase 6 SF @ $19.00/SF for a revised total of 264 SF 27. Bid Item Sikes Lake, 3.12. Manhole Rehabilitation - Modified Polymer $ 209M $ - $ - (209.00) Decrease 11 SF @ $19.001SF for a revised total of 276 SF 28. Bid Item Broad, 4.2, 8" Clean and TV Sanitary Sewer $ 1,145.00 $ - $ - (1,145.00) Decrease 229 LF @ $5.OWLF for a revised total of 200 LF 29. Bid Item Broad, 4.4. 6" x 4.6mm Cl PP $ 35.00 $ - $ - (36.00) Decrease 1 LF @ $35.001LF for a revised total of 428 LF 30. Bid Item Broad, 4.5. 8"-10" CIPP Setup Charge Per Install Length $ 10,50 $ - $ (10.50) Decrease 1 LF @ $10.6011F for a revised total of 428 LF 31. Bid Item Broad, 4.6, 6"-10' Post TV Inspection $ 0.50 $ - $ (0.50) Decrease 1 LF @ $0.60/LF for a revised total of 428 LF 32. Bid Item Broad, 4.7. Internal Reconnects $ - $ 1,400.00 $ 1,400.00 Increase 7 EA @ $200.00/EA for a revised total of 11 EA 38. Bid item Broad, 4.9. 6"-10' Point Repair (d-5' Deep) $ - $ 23,200.00 $ - 23,200.00 Increase SEA Q $2,900.001F..A for a revised total of 9 EA 34. Bid Item Broad, 4.10, Repair1Rehab 2" Asphalt Pavement $ 1,800.00 - $ - $ - (1,800.00) Decrease 12 SY @ $150.001SY fora revised total of 0 SY 35. Bid Item Broad, 4.11, RepairfRehab 8" Flex Base $ 420.00 $ - $ (420.00) Decrease 12 BY @ $35.001SY for a revised total of 0 BY 36. Bid Itam Broad, 4.12, Traffic Control $ 150.00 $ - $ (150.00) Decrease 1 Day @ $160.00fDay for a revised total of 3 Days 37. Bid Item Broad, 4.13, RepalrfRehab 8" Concrete Pavement $ - $ 2,200.00 $ 2,200.00 Increase 8 BY @ $275.O0/SY for a revised total of 20 BY 36. Bid Item Broad, 4.14, RepaldRehab6" Concrete Pavement, under asphalt $ 2,940.00 $ - $ (2,940.00) Decrease 12 SY 0 $245.001SY for a revised total of 0 BY 39, Bid Item Broad, 4.15, FlowaNe Backfll Decrease 6 GY @ 5125.00/CY for a fevlsed total of 0 CY $ 750.00 $ - $ (750.00) 40. Bid Item Broad, 4.16, Trench Safety Increase 80 LF 1gy $5.00/117 for a revised total of 90 LF $ - $ 400.00 $ 400.00 41. Bid Item Broad, 4.17, Mol izatidn MH Rehab Crew Decrease 1 EA @ $500.001EA for a revised total of 0 EA $ 500.00 $ - $ (500.00) 42, Bid Item Broad, 4,18, Manhole Rehabilitation - Modified Polymer Decease 5 SF @ $19.00/SF for a revised total of 138 SF $ 95.00 $ - $ (05.00) 43. ADD New Bid Item Broad, 4,19, Sidewalk Repair Add 50 SF @ $30.001SF fora revised total of 50 SF $ - $ 1,500.00 $ 1,500.00 44. ADD New Bid Item Broad, 4.20, W Flex Base Add 20 SY @ $33.5D1SY for a revised total of 20 SY $ - $ 670,00 $ 570.00 45, ADD New Bid Item Broad, 4.21. Hourly Clean and TV Rate Add 18 HR @ $450.00/HR for a revised total of 18 HR $ - $ 8,100.00 $ 8,100.00 46, Use of OwnerConffngencyAllawance Decrease 1 EA @ $15000.00/EA bra revised total of 0 EA $ 15,000.00 $ - $ r (16,000.00) TOTAL $ 52,434.00 $ 110,879.50 $ 58,445.50 AMAUIfITQF.,Q'EGINYILL�C1'-AdTrRACT" :;; Y "AW is 253,949.50 TOTALAMQUf OF 7fN1S CMANGB QftE]ER: '' $ 58,445.60 TOTAL 'AMQU10-0C rPE 13-0'0 %0HARG.PORDERS $ CONTRAGTeAM.OUNTWTO?DAT,F, $ 312,395.00 Approved By Owner: Accepted By Contractor: By: By: C_ fi Lags Title: City Manager Title: r e Date: Date: A-/3-20Z0 Recommended By AmhlEng: (if applicable) By,/�l'E. Title: —City Engineer Date: 4 al�au