Loading...
Res 015-2020 MOU Red River Authority of Texas new Potable Water Main 2/4/2020 Resolution No. 15-2020 Resolution authorizing the City Manager to execute a Memorandum of Understanding with the Red River Authority of Texas for the Construction of a new Potable Water Main WHEREAS, the Red River Authority of Texas (RRA) has been a wholesale water customer of the City of Wichita Falls since 1979; and, WHEREAS, the RRA desires to convert from a raw water customer to a potable water customer and install infrastructure required for this conversion; and, WHEREAS, a portion of this new infrastructure will lie within the city limits of the City of Wichita Falls and benefit to the overall water distribution system of the City of Wichita Falls; and, WHEREAS, the City of Wichita Falls desires to upsize a portion of this infrastructure in order to improve the reliability and operational functionality of its own water distribution system; and, WHEREAS, the City of Wichita Falls and the RRA desire to commemorate an related to the above considerations. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The City Manager is authorized to execute a Memorandum of Understanding with the Red River Authority of Texas for the Construction of a new Potable Water Main. PASSED AND APPROVED this the 4th day of February, 2020. ______________________________ M A Y O R ATTEST: ____________________ City Clerk