Lake Wichita Revitalization Committee Minutes - 12/10/2019Tim Brewer, City Council David Coleman, Chair KendrickSteve Young Stewart Harvey, ED LWFOR Ford Swanson c Blake Jurecek, AssistantCity Manager Russell Schreiber, Public Works Director 0 Staff Terry Points, Parks and Recreationi is rate Vikesh Desai, Engineering Robertr : , o Steve Garner Alyssa ratherDavid stated the construction is underway and that Trinity Hughes has built an earthen driveway to drill the piles, installing stated' completeon schedule to 2020, rdelivered timely. He asked if anyone would like to review the paver samples after the meeting at the site. � ; ;r: ti � �, �� ', � � i �, rt" .. ,✓ , , ; it �; �; '�+', , 15 . , December 10, 201 moneythe TP&W Grant Coordinator. Robin stated that TP&W needs to show progress on the Boat Ramp project, to ensure the Grant schedule will be met. However, since fund raising has not yet started on this project, we have no progress to report. Robin said that if the City gave back the Grant now, that would be OK, since they could use the elsewhere , , o avoid is waiting, then if the Grant schedule is not met, the money would be lost for all purposes. Blake stated that City Council approval will be required to give back the Grant. Stewart then explained the difficulty in getting donations for the Boat Ramp, since we already • + functional Boat Ramp, and donors don't rid for a; + lane boat ramp at Lake Wichita. He believes we will NOT be able to raise sufficient funds to meet the 4.schedule.#i : Plaza . project 4- appeal 4 to donors, t recommends we make this our onproject, d project. David then stated the TP&W position, that if we come back to them in the future, with a new project that is fully designed, with all permits and adequate donations in hand, that the Grant would have a good chance to be reinstated. simply incorporate essential elements of the Boat Ramp project into the Veteran's Plaza reinstatement of the Grant when the project is fully ready. This will likely be on a City Council agenda in January 2020. Vikesh said we will get 60% design drawings in January. He will speak with KHA a ask them to create 2 exhibits: One for the $750,000 phase one project to allow installation of the statue, and a second to show the entire project, including the essential elements from the Boat Ramp project. I f 4 Discussion of Brick Sales and Fundraising Initiatives: None. Other5. , up to $7500 to test the lake bed materials for suitability for making Compressed Earth Blocks. Lakeside City will contract with Aquascapes to get the work done, which will include testing by an independent lab for compressive strength. If that proves successful, we could have Jim Hollock come to WF and conduct a Town Hall to inform the public and media of the possibilities. the City has a Policy for naming City infrastructure, and we should review that Policy ensure compliance. i 13§0 �-- er: —M The meeting adjourned at 9:55 am. David Coleman, Chair 11} "Txv, �' ()Izo Date