Res 002-2012 1/3/2012RESOLUTION NO. 02 -2012 Resolution To Approve Change Order #2 to the Phase II Reconstruction of Runway 17 -35 Project, Which Will Provide For The Installation Of Runway Edge Lighting And Increase The Amount of the Contract By $34,063 WHEREAS, on June 21, 2011, the City entered into an agreement with Duininck Brothers, Inc. for work associated with Phase II Reconstruction of Runway 17 -35; and, WHEREAS, the City desires to replace the runway edge lights that will be removed as a result of this project; and, WHEREAS, Duininck Brothers, Inc. has submitted a proposal to install the runway edge lights for a price of $34,063.46; and WHEREAS, the FAA will pay for 95% of the proposed work ($32,360.29) and the City of Wichita Falls will pay for the remaining 5% ($1,703.17). NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The City Manager is authorized to execute the attached Change Order #2 to the Phase II Reconstruction of Runway 17 -35 Project, with such changes to form as are approved by the City Attorney. PASSED AND APPROVED this the 3rd day of January, 2012. MAYOR ATTEST: City Clerk CITY OF WICHITA FALLS, TEXAS CHANGE ORDER NO.: 2 CONTRACT CHANGE ORDER FORM DATE: 1 12/22/2011 AMOUNT OF CHANGE: $0.00 PROJECT /CONTRACT: Municipal Airport 17/35 Runway Phase II: AIP Grant # 3 -48- 0227 -12 TO: Duininck. Inc., this Change Order, after approval by the Owner, will be your (Contractor) authority to make the following changes in the work under your contract: Decrease Increase Total Change Descripfion of Changes in Contract in Contract in Contract 1. Added excavation of cement treated base encountered during $ $0.00 $0.00 demolition; Removal of bituminous surface course to offset excavation costs. 2. Runway edge lights $ $ 34,063.46 $ 34,063.46 3. $ $ $ - 4. $ $ $ - 5. $ $ $ 6. $ $ $ TOTAL $ $ 34,063.46 $ 34,063.46 AMOUNT OF ORIGINAL CONTRACT: $4,751,567.90 TOTAL AMOUNT OF THIS CHANGE ORDER: $34,063.46 TOTAL AMOUNT OF PREVIOUS CHANGE ORDERS: $0.00 CONTRACT AMOUNT TO DATE: $4,785,631.36 The completion time under your contract will be extended by 7 days because of this change order making the revised completion date April 29, 2012. Approved By Owner: Accepted By Contractor: Recommended By Arch /Eng: (if applicable) By: By: By: Title: City Manager Title: Title: Date: November 16, 2011 Date: Date: CHANGE ORDER AIP NO: 3 -48 -0227 -0122 CHANGE ORDER NO: 2 DATE OF ISSUANCE: 12 -22 -2011 AIRPORT: Wichita Falls Municipal Airport PROJECT: Runway 17 -35 Rehabilitation Phase 2 SPONSOR: City of Wichita Falls ADDRESS: 4000 Armstrong Drive, Suite 8 Wichita Falls TX 76305 CONTRACTOR: Duini.nck Inc. ADDRESS: 4701 North Highway 377 Roanoke, TX 79262 The following changes are hereby made to the Contract Documents: The following items were added to the contract: runway edge lights, concrete encased duct bank extension to existing manhole E4, removal of a concrete encased duct bank. the removal of abandoned conduit the removal of 2' x 2' x 2' light boxes Justification / Reason: The addition of runway lights was per the owner's request_ The duct bank extension will be done instead of providing temporary above ground cable runs The abandoned conduit is in conflict with the new conduit_ The Iieht boxes were not known to exist prior to the cornmencemeat of construction. Attachments: (List documents supporting change): Attachment A Page 1 of 4 CHANGE IN CONTRACT PRICE: Original Contract Price: $4,751,567.90 Previous Change Orders: $0.00 Contract Price prior to this Change Order: $4,751,567.90 Net increase / (decrease) of this Change Order: $34,063.46 New Contract Price with all approved Change Orders: $4,785,631.36 Percent change from original contract: 0.72% CHANGE IN CONTRACT TIME: Original Contract Time: 180 calendar days Net change from previous Change Orders: 0 calendar days Contract Time prior to this Change Orders: 180 calendar days Net increase / decrease of this Change Orders: 7 calendar days Contract Time with all approved Change Orders: 187 calendar days CONDITIONS OF APPROVAL: Contractor a;rees that execution of this Change Order settles any and all claims related to the items addressed herein. The aforementioned change, and work affected thereby, is subject to all contract stipulations and covenants. Page 2 of 4 ATTACEENMNT A TO CHANGE ORDER NO.2 Indicate below any new pay items or revisions to original contract pay items resulting from this Change Order. CONTRACT QUANTITY AND PRICE CHANGES: Page 3 of 4 Contract Quantity Item No. Description Unit Unit Cost Change Price Change L- 108 -5.1 Temporary Cable installations, splicing LS $10;000.00 (1.00) $ (10,000.00) and Phasing of Ductbanks L- 108 -5.2 Temporary No. 8, 5kV, L -824C LF $1.75 (8,400.00) $ (14,700.00) Shielded Cable L- 108 =5.3 Temporary No. 6, 5kV, L-824C LF $3.10 (1,680.00) S (5,208.00) Shielded Cable L- 108 -5.4 No. 8, 5kV, L-824C Shielded Cable, LF $1.75 (85,770.00) $ (150,097.50) Installed in Duct or Conduit L- 108 -5.5 No. 6, 5kV, L-824C Shielded Cable LF $3.10 (6,240.00) $ (19,344.00) Installed in Duct or Conduit L- 108 -5.6 No. 4 Counterpoise Wire with Ground LF $1.15 1,15 0.00 S 1,322.50 Rods and Connectors L -1 10 -5.1 4 -Inch Conduit, Direct Earth Burial, LF $12.00 (4,490.00) $ (53,880.00) including Trench and Backfill L- 110 -5.2 2 Way, 4 -Inch Duct Bank, Direct Earth LF $24.00 4,850.00 $ 116,400.00 Burial including Trench and Backfill L- 110 -5.3 4 Way, 4 -Inch Duct Bank, Concrete LF $50.00 60.00 S 3,000.00 Encased, including Trench and BackfUl L- 110 -5.5 12 Way, 4 -Inch Duct Bank, Concrete LF $81.00 280.00 $ 22,680.00 Encased, including Trench and Backfill L- 115 -5.1 Light Box Type Handhole, 2.5'x 2.5'x EA $4,000.00 (11.00) $ (44,000.00) 3' L- 115 -5.2 Handhole, 3' x 3' x 3' with Spring Assist EA $5,000.00 (4.00) S (20,000.00) Cover L -108 -5.10 No. 8, SkV, L -824 C Unshielded Cable, LF $1.67 80,000.00 $ 133,600.00 Installed in Duct or Conduit L- 108 -5.11 No. 6, SkV, L-824C Unshielded Cable LF $2.85 6,240.00 S 17,784.00 Installed in Duct or Conduit L- 110 -5.6 Remove 4 way 4" concrete encased LF $39.11 186.00 $ 7,088.46 duetbank, disposal included L- 110 -5.7 Remove 2 - 4" direct buried conduit, LF $7.40 4,200.00 $ 31,080.00 disposal included L- 125 -5.4 New L -862 Elevated Runway Edge EA. $583.00 26.00 $ 15,158.00 Light with Transformer on Relocated Light Box P- 150 -4.3 2'x2'xT Light Box Removal EA $ 132.50 24.00. S 3,190.00 Total: $34,063.46 Page 3 of 4 Prepared by URS Corporation: Todd Hebert, P.E. Proiect Manager 12/22111 Name Title Date Accepted by Contractor: y, Ce- Si re Title Accepted by Sponsor: Signature lZ zZ, Zo 1 Date City Manager Title Date Page 4 of 4 I