Loading...
Res 051-2018Resolution No. 51-2018 Resolution awarding bid and contract for the Wastewater Collections Office and Equipment Storage Facility to Robert Eason dba Santa Rosa Construction Co. in the amount of $934,000.00 WHEREAS, the City of Wichita Falls has advertised for bids for the Wastewater Collections Office and Equipment Storage Facility; and, WHEREAS, it is found that the lowest responsible bidder is Santa Rosa Construction Co., who made a unit price bid with an estimated total of $934,000.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WICHITA FALLS, TEXAS, THAT: The unit price bid for the Wastewater Collections Office and Equipment Storage Facility is awarded to Robert Eason dba Santa Rosa Construction Co., in an estimated total amount of $934,000.00, and the City Manager is authorized to execute a contract for the City with said Contractor for the construction of such project. PASSED AND APPROVED this the 1st day of May, 2018. mop i,7J1 ATTEST: A-V Deputy City Cl , k PROPOSAL TAB RESULTS —� Waste Water Collections Office and Equipment Storage Facility A5 City of Wichita Falls T E X ,A S Wichita Falls RFP #06-18 F SLA Project No. 17040 Bid Date: April 17, 2018 Time: 2:00 PM SLA Location: Room 113 Memorial Auditorium, 13007th Street, Wichita Falls. Texas 76301 ,�R��iIT'EC'TS Ack. Bid Band, Insurance Contractor/Contact Adden Certificate, Safety Base Proposal Deductive Alternate Calendar Days Record, Qualification No. 1 1 2 Statement Anthony Inman Construction x x x $968,000.OD -$61,000.OD 270 M 8 F Litteken x x x $1,425,000 -$61,000.OD 3DO Cunningham Clark Construction x x x $1,049,750.00 459,500.00 195 Trinity Hughes Construction x x x $990,000.00 -$65,000.00 210 Santa Rosa Construction x x x $934,000.00 420,800.00 1 B I 0 C` 1 A a croM.r*�RKov�w evM*`en f yiffi�Fla i+��S LU 2 6 LL LL — d < F C7 J u a Il! I} 0 F W I— W z SLS. ITM IIATE 8!11M SHED TITLE PROPOSE!b SITE PLAN (FULL BITE4 snee-uo. PROPOSED SITE PLAN .y-`.� 02A SLA A R C H I I E C IS April 18, 2018 Mr. Russell Schreiber, P_E_ Director of Public Works City of Wichita Falls P.O_ Bou 1431 Wichita Falls, TX 76307 (940) 761-7477 Re= Waste Water Collections Ciffice and Equipment Storage Facility 1004 River Road, Wichita Falls, TX SLA Project #17040 City of WF RFP #06-18 Dear Mr_ Schreiber Attached is the Proposal Tab Results for the Waste Water Collection Office and Equipment Storage Facility for the City of Wichita Falls_ The proposal amounts and construction times listed by the five proposals were very competitive due to the current local bidding climate. All proposal costs listed in the tab sheet are below SLVs last opinion of construction costs_ Having reviewed all information contained in the praposals, our recommendation would be to accept the proposal of Santa Rosa Construction based on the point system listed in the project manual_ Of the five firms who provided proposals, Santa Rosa Construction is the smallest but should be capable of completing a project of this size and scope_ We would recommend acceptance of their base proposal amount of $938,000 and not accept Deductive Alternate No_ 1 for $20,800 (deletion of one bay)_ Please contact me if you have any questions or concerns_ Sincerely, Jackie Lebow, Jr., AIA JL/sr File 2004 Quail Creek Drive, Suite 200 ♦ Wichita Falls, Texas 7630a * 940.767.7478 ♦ wwYv.slatx_us